BlockBefore

Happy Isles Bridge, Spanning Merced River on Service road, Yosemite Village

Happy Isles Bridge, Spanning Merced River on Service road, Yosemite Village, Mariposa County, CA. Surveyed as HAER CAL,22-YOSEM,18-, with a 1,693-word written history.

From the record

“The Happy Isles Bridge exemplifies the National Park Service " rustic style" of architecture.”

Written record, HAER CAL,22-YOSEM,18- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,22-YOSEM,18- · the record runs 1693 words · one of 124 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

89 words

Source document Quoted word for word from HAER CAL,22-YOSEM,18-. Not written, edited or summarised by this site.

Happy Isles Bridge carries a park road across the Merced River at Happy Isles at the east end of the Yosemite Valley in Yosemite National Park, Mariposa County, California. QUAD: HALF DOME, CA UTM: Date of Construction: Designer and Builder: Designed by the San Francisco office of the Bureau of Public Roads, with design assistance from the National Park Service Landscape Architecture Division. Contractors: Schuler and McDonald Original and Present Owner Yosemite National Park, National Park Service. Structure Type: stone-faced reinforced concrete filled spandrel arch bridge FHwA Structure No.:

Written history

1539 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,22-YOSEM,18-. Not written, edited or summarised by this site.

Documentation of Happy Isles Bridge is part of the Yosemite National Park Roads and Bridges Recording Project, conducted by the Historic American Engineering Record in summer Richard H. Quin, Historian HAPPY ISLES BRIDGE HAER No. CA-97 (page 2) II.

History

This is one in a series of reports prepared for the Yosemite National Park Roads and Bridges Recording Project. HAER No. CA-117, YOSEMITE NATIONAL PARK ROADS AND BRIDGES, contains an overview history of the park roads.

History of Happy Isles Bridge

Although the National Park Service constructed the Happy Isles Bridge [HAER No. CA-104] over the Merced River at the upper end of Yosemite Valley in the bridge had only been in use for seven years before the agency determined that it was inadequate for traffic loads. Accordingly, the Bureau of Public Roads which assumed responsibility for new road construction in all the national parks in drew up plans for a new bridge at their San Francisco district office in The BPR chose a site 500 yards downstream from the old bridge for a new stone-faced reinforced concrete filled spandrel arch bridge. Test pits for the structure were1 dug in March and the data was transmitted to the district office.

Bids for the construction of the bridge were opened at the Bureau' s San Francisco office on 12 July Schuler & McDonald, an Oakland, California construction firm, submitted the low bid of and the Department of the Interior awarded the firm the contract on 23 July. The firm was alloted 135 days to complete the project.2 Schuler & McDonald established their construction camp near the base of Bridalveil Fall, using a site that had been used by several other bridge and tunnel contractors, and lately used by the firm of Rocca & Caletti, which had just completed the construction of five other Valley bridges.

The bridge site having already been cleared by National Park Service crews, construction began on 13 August Work began with excavation of the east abutment, using a tractor hoist fitted with a derrick and dump buckets. Schuler & McDonald purchased a used cement mixer that Rocca & Caletti had used on their projects, despite the misgivings of the supervising engineer that the machine was badly worn and potentially unreliable. Schuler & McDonald engaged stonecutters who had worked for Rocca & Caletti to prepare the stone for the bridge, having no experienced masons of their own.

The cutting of stone for the bridge began on 17 September; the granite stone was obtained from a boulder at the base of Rocky Point, a talus cone at the foot of the Lower Brother (smallest of the Three Brothers, a prominent Yosemite Valley landmark). The arch ring stones or voussoirs were cut using wooden templates. While this work was going on, the excavation for the west abutment was finished and the wooden falsework for the arch centering was erected. In addition to the stone taken from the boulder at Rocky Point, the project utilized crushed rock aggregate obtained from the crusher plant located below Pohono Bridge, and sand from a pit in Wildcat Creek.

The steel reinforcing bars were obtained from the Soule Steel Company of San Francisco.4 The arch ring stones were set in place using a old traveling crane, also purchased from Rocca & Caletti. This venerable device utilized a wooden Howe truss and did its job well. The concrete was then poured for the arch rings, followed by the spandrels, with the concrete for the crown or key being poured last. The steel reinforcing rods or rebar were dowled out from the abutments. The placing of weathered stone for the head walls followed.5 The acting park superintendent noted in his monthly report that the work was behind schedule because the contractor was evidently unfamiliar with this sort of work.6 HAPPY ISLES BRIDGE HAER No.

CA-97 {page 3) On 1 October, Schuler & McDonald was notified that park funds for the construction of the bridge were exhausted, and that work should stop unless the contractor was willing to finance the ongoing work out of pocket. The contractor decided to continue work for a while, as the pouring of the concrete was well underway and a disruption would cause considerable problems when work resumed. When pouring for the major part of the bridge was completed, the contractor asked for the proferred shutdown on 7 November, and was approved.7 Work on the bridge resumed on 15 April with excavation for the east subway or equestrian tunnel. Footings for the wing walls were excavated, the struts poured, and arch stones set for the east subway.

The spandrel wall was then constructed, the stones being placed by the traveler crane. All rock was placed by the end of June. A membrane waterproofing was then applied to the concrete surfaces. The bridge was filled with in part with material taken out in the excavation. Another delay occured at this point, when some of the crushed rock for the fill was rejected by the engineer. By the end of July, 157 percent of the alloted time had elapsed, and the bridge was still not ready. By late summer the backfill had been placed and the bridge was subsequently paved.

The structure was completed and accepted by the Park Service on 16 August Although the engineers were pleased with the new bridge, they noted that the contractor lost on the project; reasons given were the entering of too low a bid for the work, the employment of too small a force to meet the deadline, and the use of worn equipment that was in some cases far too light for the project.8 Total cost of the structure was Happy Isles Road was graded and paved in an accompanying project. Shoulders were widened and stone was set between the road and the bordering sidewalk.

The curb stone was quarried at Arch Rock.10 Workers from the Emergency Conservation Works, a federal relief program, landscaped the approaches to the bridge in The Happy Isles Bridge is long, and constructed on a 20 percent skew from the centerline. The bridge is 40' wide, with a clear roadway of 27* and 5' sidewalks on either side. The single span across the river measures 75' . Each of the abutments features a semi-circular arched equestrian tunnel 9' 8" high; the west tunnel is 8' 9" in width, and the east one 9' 3" ; these subways are similar to the ones on Clark' s Bridge, which was constructed at about the same time. The equestrian tunnels were designed to accomodate a bridle path that was built through the east end of the Valley at about the same time as the bridges.

Stonework on the bridge differs from that on the other stone-faced bridges in the Valley, in that it used freshly-quarried stone, bedded in mortar with raked joints. This angular, rough-cut stone was laid in a random, almost haphazard pattern, contrasting sharply with the larger coursed blocks employed four years later in the construction of the Stoneman Bridge. The Happy Isles Bridge is very similar to the Clarks Bridge [HAER No. CA-96] three-quarters of a mile downstream, which was built within the year. NOTE: Some thirty of forty yards west of the bridge, the Happy Isles Road crosses a stone arched culvert over an intermittent branch.

The barrel vault and arch for the culvert is of similar construction to the equestrian subways on the bridge, but the embankment walls flanking the culvertn are faced with cut river rubble stone. This culvert was built in May HAPPY ISLES BRIDGE HAER NO. CA-97 (page 4) III. BNDNOTES 1. H. S. Tolen and A. W. Schimberg, Final Construction Report, Yosemite National Park Project Happy Isles Bridge, June 1; . P. Leavitt, Acting Superintendent's Monthly Report, March 5. 2. Tolen and Schimberg, 2. 3. Ibid., 3. 4. Ibid., 5. Ibid., 6. Leavitt, Superintendent's Monthly Report, September 3. 7. Tolen and Schimberg, 5. 8. Ibid., 9; Charles Goff Thomson, Superintendent' s Monthly Report, May 15; Superintendent' s Monthly Report, June 9; Superintendent* s Monthly Report, July 7. 9.

National Register of Historic Places nomination for the Yosemite Valley Bridges, prepared by Merrill Ann Wilson, August Sec. 7, p. 3. 10. Arthur E. Cowell, Associate Engineer, Bureau of Public Roads, "Report of Construction Activities, Typed 21 February 9. Yosemite National Park Maintenance and Engineering Office. The quarry at the Arch Rock Entrance Station (on the north side of the Ail-Year Highway) is still visible. 11. Thomson, Superintendent' s Monthly Report, February 10. 12. Idem, Superintendent's Monthly Report, May 8. HAPPY ISLES BRIDGE HAER NO- CA-97 (page 5) IV. BIBLIOGRAPHY UNPUBLISHED PUBLIC DOCUMENTS Cowell, Arthur E., Bureau of Public Roads. "Report of Construction Activities, Typed 21 February Yosemite National Park Maintenance and Engineering Office. Leavitt, E. P.

Acting Superintendent' s Monthly Report, March Acting Superintendent's Monthly Report, September Moss, Lonnie E. Bridge Safety Inspection Report, Happy Isles Bridge, Yosemite National Park. (Denver, CO: Federal Highway Administration, 27 January Thomson, Charles Goff. Superintendent' s Monthly Report, May Superintendent's Monthly Report, June Superintendent's Monthly Report, July Tolen, H. S. and A. W. Schimberg. Final Construction Report, Yosemite National Park Project Happy Isles Bridge, June Wilson, Merrill Ann. National Register of Historic Places nomination for the Yosemite Valley Bridges, August

In context

Mariposa County, California 179 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Mariposa County

24 of 123 records shown

The federal survey recorded these other structures elsewhere in Mariposa County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Yosemite National Park Roads & BridgesHAER CAL,22-YOSEM,5-61,713 words
Ahwahnee HotelHABS CA-283053,778 words
Ahwahnee HotelHABS CA-2830-B23,148 words
Camp CurryHALS CA-6522,874 words
Ahwahnee HotelHABS CA-2830-C21,781 words
Ahwahnee HotelHABS CA-2830-A21,698 words
Wawona RoadHAER CAL,22-WAWO,4-12,883 words
Big Oak Flat RoadHAER CAL,22-YOSEM,29-11,999 words
Yosemite Hydroelectric Power PlantHAER CAL,22-YOSEM,4-10,292 words
Wawona HotelHABS CAL,22-WAWO,1-8,556 words
All Year HighwayHAER CAL,22-ELPOR,1-8,260 words
Glacier Point RoadHAER CAL,22-YOSEM,10-6,292 words
Yosemite MuseumHABS CA-28094,975 words
Coulterville RoadHAER CAL,22-YOSEM,28-4,927 words
Sweetwater Gold MineHAER CA-2281-A4,915 words
Wawona TunnelHAER CAL,22-YOSEM,26-4,803 words
Sweetwater Gold MineHAER CA-22814,787 words
Wawona Covered BridgeHAER CAL,22-WAWO,5-3,748 words
Chinquapin Service Station & Lunch RoomHABS CAL,22-WAWO,2-3,510 words
El Capitan BridgeHAER CAL,22-YOSEM,22-3,219 words
Sweetwater Gold MineHAER CA-2281-B3,188 words
Tenaya Creek BridgeHAER CAL,22-YOSEM,19-2,497 words
Tamarack Creek BridgeHAER CAL,22-YOSEM,12-2,480 words
Cascade Creek BridgeHAER CAL,22-YOSEM,13-2,447 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,22-YOSEM,18-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.