BlockBefore

Ahwahnee Bridge, Spanning Merced River on service road, Yosemite Village

Ahwahnee Bridge, Spanning Merced River on service road, Yosemite Village, Mariposa County, CA. Surveyed as HAER CAL,22-YOSEM,21-, with a 2,018-word written history.

From the record

“The only-triple arched masonry bridge in Yosemite Valley, the Ahwahnee Bridge is characteristic of the National Park Service's rustic style~ of architecture.”

Written record, HAER CAL,22-YOSEM,21- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,22-YOSEM,21- · the record runs 2018 words · one of 124 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

102 words

Source document Quoted word for word from HAER CAL,22-YOSEM,21-. Not written, edited or summarised by this site.

Ahwahnee Bridge carries a limited- access road across the Merced River in the east end of Yosemite Valley, Yosemite National Park, Mariposa County, California. The structure is one of two spans located approximately 1/4-mile south of the Ahwahnee Hotel on the Mirror Lake access road. QUAD: EL CAPITAN, CA UTM: Date of Construction: Designer and Builder: Designed by George D. Whittle, Senior Highway Engineer for the San Francisco district office of the Bureau of Public Roads. Contractors: Rocca and Caletti Original and Present Owner Yosemite National Park, National Park Service. Structure Type: Stone-faced reinforced concrete filled spandrel arch bridge FHwA Structure No.:

Written history

1846 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,22-YOSEM,21-. Not written, edited or summarised by this site.

This document was prepared as part of the Yosemite Roads and Bridges Recording Project, conducted by the Historic American Engineering Record in summer Richard H. Quin, HAER Historian AHWAHNEE BRIDGE HAER NO. CA-100 (page 2) II.

History

This is one in a series of reports prepared for the Yosemite Roads and Bridges Recording Project. HAER No. CA-117, YOSEMITE NATIONAL PARK ROADS AND BRIDGES, contains an overview history of the park roads.

History of Ahwahnee Bridge

Ahwahnee Bridge is a graceful three-arched bridge carrying the limited-access Mirror Lake Road across the Merced River in the upper end of Yosemite Valley. Like five other spans built under a Valley bridge replacement program, Ahwahnee Bridge is a stone-faced reinforced concrete structure; however, unlike the other bridges, the Ahwahnee Bridge is distinguished by its use of three separate arches, making for an especially picturesque example of the rustic style of architecture employed by the National Park Service during the and Construction of Ahwahnee Bridge and the neighboring Sugar Pine Bridge (HAER No. CA-99] enabled the National Park Service to reroute the old Mirror Lake Road southward in order to provide space for the opulent new Ahwahnee Hotel constructed at about the same time.

The original road to Mirror Lake ran closer to the north wall of the Valley; part of this road was retained as a cul-de-sac to provide access to the new hotel. The new road ran east across Ahwahnee Meadow. Here, the Merced River made a northerly meander, requiring two new bridges. Like the other Yosemite Valley bridges constructed in this period, Ahwahnee Bridge was designed by George D. Whittle, Senior Highway Engineer for San Francisco district office of the Bureau of Public Roads (United States Department of Agriculture). Under an agreement with the National Park Service in the Bureau of Public Roads assumed responsibility for design and construction of major park roads and road structures. Daniel R.

Hull, chief of the NPS landscape engineering division, did not accept the original site chosen, but ordered the structure moved downstream about 1 Nathan W. Morgan, NPS Office Engineer, visited Yosemite in October to investigate the sites for the new bridges. In a letter to Thomas C. Vint of the NPS Landscape Engineering Division, he urged that either an 80' single span stone-faced arch bridge or a twin-span girder bridge be constructed. 2 After further review, a three-arch stone-faced bridge was selected. The final design was reviewed and approved by two members of the Washington-based National Commission on Fine Arts. The construction contract for the Ahwahnee and four other bridges was awarded to the San Francisco firm of Rocca and caletti.

3 The bridge was first called Kenneyville Bridge No. 1, after the little establishment of Kenneyville * where the Valley livery stables were located. (The nearby Sugar Pine Bridge was called Kenneyville Bridge No. 2. ) The * After George Kenney, an Yosemite stage line operator, who joined with partner William T. Coffman in to operate a livery service in the Valley. James M. Hutchings had maintained stables on the site even earlier; these were acquired by Coffman in ( The Yosemite Travel--A Round Trip, Mariposa Gazette, 21 April 2; Homer w. Robinson, History of Business concessions in Yosemite, Yosemite Nature Notes XXVII (June 89; rncorporated, Mariposa Gazette, 3 November 3; Hite' s Cove and Yo Semite, Mariposa Gazette, 15 April 2.) AHWAHNEE BRIDGE HAER NO.

CA-100 (page 3) original name was used in park administrative documents describing the bridge's construction. In October NPS Office Engineer Nathan W. Morgan suggested to NPS landscape architect Thomas c. Vint that Yosemite superintendent Washington B. Lewis or some ot~er party be consulted to find more suitable names for the structure than No. 1 or No. 2 (The name Ahwahnee, meaning something like oeep Grassy Valley, was ultimately chosen, probably on account of the simultaneous construction of the nearby Ahwahnee Hotel.) Work began in winter with the construction of a work road between the two bridge sites. Actual bridge work began in July with excavation for the abutments and the placing of wooden falsework. Rocca and Caletti concentrated their crews on the project in August.

The piers and abutments were completed in September, and in October the timber arch centering was placed and the three stone arch rings went up. Rocca and Caletti encountered trouble in finding competent stone masons at this point, and the work was slightly delayed. 4 By the end of March the spandrel walls and west approach wing walls were up, and concrete was poured in April. A membrane waterproofing was placed in May prior to adding the fill, which came from the river bed just above the bridge site. All work was completed over the summer except for some pointing work and placing of the placing of riprap, and the bridge was accepted by the National Park Service in September.

5 The area around the bridge was landscaped with native plants and willows in by enrollees in the Emergency Conservation Works program. 6 In the National Park Service closed the eastern third of Yosemite Valley to private automobiles and instituted a shuttle bus system to provide alternate transportation. The Mirror Lake Road was closed at the same time closed to private vehicles, and today the Ahwahnee Bridge carries mainly walkers and cyclists bound for Mirror Lake. Ahwahnee Bridge is long and 41' wide; the width allows for two 13' 5 lanes of roadway, a 7' bridle path and a 5' sidewalk. (The width of the spandrel walls accounts for the remaining The bridge is carried by three semi-elliptical arches. The central arch has a clear span of 42' and rises 7' from the springing line.

The two side arches have 39' clear spans and rise 6'. The bridge abutments and the two piers are dug to firm foundations but do not rest on wooden piles as do several of the other bridges. Class B concrete was used for the abutments and the base of the piers; all other concrete work utilized Class A concrete.* The bridge is faced in native granite. The hand-cut arch ring stones or voussoirs were cut from templates and erected into the three arches on wooden falsework. The concrete barrel vaults were constructed next. The concrete was reinforced by deformed steel rebar diameter longitudinal bars on i2 centers, and 1/2 diameter transverse bars on is centers, laid in two grids joined by 1/2 diameter metal hoops spaced alternately on 35 centers).

Once the steel was in place, the concrete was poured in four stages. First, the abutments and piers were poured with Class B concrete. Next the crown sections of each arch were poured, followed by the haunch sections. The construction keys (located at the points where the arch haunches join the tops * Classes of concrete ref er to the amount of Portland cement used in the mixture, with Class A having the highest proportion and so on. AHWAHNEE BRIDGE HAER NO. CA-100 (page 4) of the abutments or piers) were poured last. Tile weep holes were provided on 8' spacing in the masonry work. Once the concrete work was complete, a membrane waterproofing treatment was applied, and the compacted earth fill was added. Stone parapet walls, rising 3' 11 from the profile grade, were then constructed.

A 20' pavement (done under a separate contract) was then laid atop the bridge. This pavement was separated from the bridle path and sidewalk by stone curbs. The walks were covered with 4" of stone screenings. 7 The bridge, which carries only occasional service vehicles, is in good condition. However, concerns have been expressed that the bridge's piers are restricting the flow of the Merced River and contributing to seasonal flooding. For this reason, the park administration is now considering the replacement of the bridge. Ahwahnee Bridge is listed in the National Register of Historic Places. AHWAHNEE BRIDGE HAER NO. CA-100 (page 5) III. ENDNOTES 1. Robert c.

Pavlik, In Harmony with the Lan~scape: A History of the Built Environment of the Yosemite National Park (Master' s Thesis, University of California at Santa Barbara, w. K. Reed, Associate Engineer, National Park Service, to Bert H. Burrell, Acting Chief Civil Engineer, National Park Service, 17 September National Archives, Record Group 79, Entry 22, Box 20. 2. Nathan W. Morgan, NPS Office Engineer, Yosemite National Park, to Thomas c. Vint, NPS Landscape Engineering Division, San Francisco, 9 October National Archives, Record Group 79, Entry 22, Box 20. 3. Pavlik, 3. 4. Washington B. Lewis, Superintendent's Monthly Report, December 1; Acting Superintendent's Monthly Report, July 8; Acting Superintendent's Monthly Report, August 6; E. P.

Leavitt, Acting Superintendent's Monthly Report, September 6; Acting Superintendent's Monthly Report, October 8; Acting Superintendent's Monthly Report, November 6. 5. Leavitt, Acting Superintendent's Monthly Report, March 5; Acting Superintendent' s Monthly Report, April 4; E. c. Solinsky, Acting Superintendent's Monthly Report, May 5; Leavitt, Acting Superintendent's Monthly Report, June 4; Acting Superintendent's Monthly Report, July 4; Acting Superintendent's Monthly Report, September 3. 6. Charles Goff Thomson, Superintendent's Monthly Report, February 10. 7. Construction information taken in part from United States Department of Agriculture, Bureau of Public Roads, Yosemite National Park, Plans for Five Bridges, Kenneyville Bridge No.

1 Across Merced River, construction drawing, December Measurements confirmed by HAER, July AHWAHNEE BRIDGE HAER NO. CA-100 (page 6) IV. BIBLIOGRAPHY UNPUBLISHED PUBLIC DOCUMENTS Leavitt, E. P. Acting Superintendent' s Monthly Report, September --Acting Superintendent' s Monthly Report, October --Acting Superintendent' s Monthly Report, November --Acting Superintendent' s Monthly Report, March --Acting Superintendent' s Monthly Report, April --Acting Superintendent' s Monthly Report, June --Acting Superintendent' s Monthly Report, July --Acting Superintendent' s Monthly Report, September Lewis, Washington B. Superintendent's Monthly Report, December --Superintendent's Monthly Report, August Solinsky, E. c. Acting Superintendent's Monthly Report, May Thomson, Charles Goff.

Superintendent's Monthly Report, February Washington, National Archives. Nathan W. Morgan, NPS Office Engineer, Yosemite National Park, to Thomas c. Vint, NPS Landscape Engineering Division, San Francisco, 9 October Record Group 79, Entry 22, Box 20. K. Reed, NPS Associate Engineer, to Bert H. Burrell, NPS Acting Chief Civil Engineer, 17 September Record Group 79, Entry 22, Box 20. ARTICLES aite' s Cove and Yo Semite. Mariposa Gazette, 15 April 2. Incorporated. Mariposa Gazette, 3 November The Yosemite Travel--A Round Trip. Mariposa Gazette, 21 April 2. CONSTRUCTION DRAWINGS United States Department of Agriculture, Bureau of Public Roads. Yosemite National Park, Plans for Five Bridges, Kenneyville Bridge No. 1 Across Merced River.

Construction drawing, December SECONDARY SOURCE DOCUMENTS AHWAHNEE BRIDGE HAER NO. CA-100 (page 7) Pavlik, Robert c. rn Harmony with the Landscape: A History of the Built Environment of the Yosemite National Park. (Master's Thesis, University of California at Santa Barbara, Robinson, Homer w. The History of Business Concessions in Yosemite National Park. Yosemite Nature Notes XXVII (June ADDENDUM TO: HAER No. CA-100 AHWAHNEE BRIDGE (Kenneyville Bridge No. 1) Yosemite National Park Yosemite National Park Roads & Bridges Spanning Merced River on service road Yosemite National Park Mariposa County California PAPER COPIES OF COLOR TRANSPARENCIES HISTORIC AMERICAN ENGINEERING RECORD National Park Service U.S. Department of the Interior C St. NW Washington, DC

In context

Mariposa County, California 179 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Mariposa County

24 of 123 records shown

The federal survey recorded these other structures elsewhere in Mariposa County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Yosemite National Park Roads & BridgesHAER CAL,22-YOSEM,5-61,713 words
Ahwahnee HotelHABS CA-283053,778 words
Ahwahnee HotelHABS CA-2830-B23,148 words
Camp CurryHALS CA-6522,874 words
Ahwahnee HotelHABS CA-2830-C21,781 words
Ahwahnee HotelHABS CA-2830-A21,698 words
Wawona RoadHAER CAL,22-WAWO,4-12,883 words
Big Oak Flat RoadHAER CAL,22-YOSEM,29-11,999 words
Yosemite Hydroelectric Power PlantHAER CAL,22-YOSEM,4-10,292 words
Wawona HotelHABS CAL,22-WAWO,1-8,556 words
All Year HighwayHAER CAL,22-ELPOR,1-8,260 words
Glacier Point RoadHAER CAL,22-YOSEM,10-6,292 words
Yosemite MuseumHABS CA-28094,975 words
Coulterville RoadHAER CAL,22-YOSEM,28-4,927 words
Sweetwater Gold MineHAER CA-2281-A4,915 words
Wawona TunnelHAER CAL,22-YOSEM,26-4,803 words
Sweetwater Gold MineHAER CA-22814,787 words
Wawona Covered BridgeHAER CAL,22-WAWO,5-3,748 words
Chinquapin Service Station & Lunch RoomHABS CAL,22-WAWO,2-3,510 words
El Capitan BridgeHAER CAL,22-YOSEM,22-3,219 words
Sweetwater Gold MineHAER CA-2281-B3,188 words
Tenaya Creek BridgeHAER CAL,22-YOSEM,19-2,497 words
Tamarack Creek BridgeHAER CAL,22-YOSEM,12-2,480 words
Cascade Creek BridgeHAER CAL,22-YOSEM,13-2,447 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,22-YOSEM,21-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.