Central Pacific Transcontinental Railroad, Tunnel No. 4, Milepost 180.95, Cisco
Central Pacific Transcontinental Railroad, Tunnel No. 4, Milepost 180.95, Cisco, Placer County, CA. Surveyed as HAER CAL,31-CISCO,2-, with a 968-word written history.
From the record
“The Central Pacific First Transcontinental Railroad is a segment of the western half of the first transcontinental railroad, built from Sacramento, California to Promontory Summit, Utah between and where it joined the Union Pacific Railroad which had built west from Omaha.”
Written record, HAER CAL,31-CISCO,2- survey. Machine-read text.
Surveyed by the federal HAER program as HAER CAL,31-CISCO,2- · the record runs 968 words · one of 28 surveyed structures published for this county.
Source document
Quoted word for word from HAER CAL,31-CISCO,2-.
Not written, edited or summarised by this site.
Southern Pacific Dormer Pass Route Tunnels Milepost at Cisco, Placer County, California. UTM: Quad: Cisco Grove, Calif. (photorevised (west portal) UTM: Quad: Cisco Grove, Calif. (photorevised (east portal) Date of Construction: Engineer: Theodore Judah and Central Pacific Railroad Engineering Department Southern Pacific Railroad Engineering Department
Significance
849 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER CAL,31-CISCO,2-.
Not written, edited or summarised by this site.
The Central Pacific First Transcontinental Railroad is a segment of the western half of the first transcontinental railroad, built from Sacramento, California to Promontory Summit, Utah between and where it joined the Union Pacific Railroad which had built west from Omaha. For the purpose of the current project, the first transcontinental railroad was found likely to be eligible for the National Register of Historic Places at the national level of significance under Criterion A for its significance in transportation history, in uniting the East and the West, and in the development of the West.
The railroad's period of significance is to from the line's completion in through the years of its role in the settlement and development of the West, to the conclusion of the railroad's achievements in World War H. Tunnel 4 is a contributive element of this historic property. Report Prepared By: John W. Snyder Co-Principal Preservation Services P.O. Box Sacramento CA CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 4 HAER No. CA-214 Page 2
Description
Tunnel 4 is a 160-foot, single track railroad tunnel bored through a rocky point on the north slope of Mclntosh Hill by Central Pacific forces in The Southern Pacific Railroad slightly enlarged the tunnel in during the double-track project, and again in to accommodate larger locomotives and rolling stock; these alterations, however, do not appear to have appreciably changed its appearance from the period of its original construction. The tunnel is on an eight degree right-hand curve, and carries the tracks of the Union Pacific Railroad's (formerly Southern Pacific) Donner Pass line. II.
HISTORICAL INFORMATION When the Central Pacific built the first transcontinental rail line over the Sierra Nevada in expediency stemming from time considerations and from the hand labor used to build the line forced a circuitous route that, wherever possible, hugged the outside slopes of hills to maintain reasonable grades in the climb over the mountain rampart. The builders were able to avoid tunneling until they had nearly reached Blue Canon, more than seventy miles from Sacramento. There they built Tunnel 1 (HAER CA-207), and sequentially numbered the tunnels following to the east as they pushed the tracks toward Promontory Summit and the May meeting with the Union Pacific.
Tunnel 4, located just east of Cisco, is typical of the simple tunnels built by the Central Pacific crews when they had to tunnel: a hard rock bore through a small point, lacking the finished portals that would come with later construction, and with no interior timbering required. Immediately adjacent to Tunnel 39 on the new second track, Tunnel 4 is included in the documentation set for the Central Pacific Transcontinental Railroad (HAER No. CA-196) in order to provide context, as a rare survivor of the initial construction of the pioneer route. m.
Sources
Beebe, Lucius. The Central Pacific & The Southern Pacific Railroads. Berkeley, CA: Howell- North, California Department of Parks and Recreation, Office of Historic Preservation. California Historical Landmarks. Sacramento: Daggett, Stuart. Chapters on the History of the Southern Pacific. New York: Augustus M. Kelley, Publishers, originally published Howard, Robert West. The Great Iron Trail: The Story of the First Transcontinental Railroad. New York: G. P. Putnam's Sons, Kraus, George. High Road to Promontory: Building the Central Pacific across the High Sierra. Palo Alto: American West Publishing Company, CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 4 HAER No. CA-214 Page 3 Sabin, Edwin L. Building the Pacific Railway.
Philadelphia and London: Lippincott Company, United States Geological Survey. Topographic maps. Cisco Grove, Calif, quadrangle, series, (photorevised IV. PROJECT INFORMATION As a result of the merger of the Union Pacific and Southern Pacific Railroads, a federal undertaking under the jurisdiction of the Surface Transportation Board of the U.S. Department of Transportation, and in order to accommodate freight trains utilizing longer and taller cars and loads~tri-level auto rack cars and cars carrying double-stacked containers, the Union Pacific will need to increase tunnel clearances on the former Southern Pacific Donner Pass Route. The tunnels, built between and are contributing elements of the National Register-eligible Southern Pacific Donner Pass Route Tunnels Historic District.
All tunnels have been laser- measured and the railroad will determine clearance needs on a tunnel-by-tunnel basis. Some, because of curved alignment, will require interior work to allow for longer cars such as tri-level auto rack cars; others will require both interior and portal work to provide sufficient vertical clearance for "double-stack" container cars. The latter work may impact the character-defining tunnel portals if crown mining of the tunnels (as opposed to lowering the tunnel floors) is selected. Inasmuch as this would cause an adverse effect to the tunnels, Union Pacific has elected to record the tunnels for the Historic American Engineering Record.
Though apparently not requiring alteration, Tunnel 4 is included in the documentation set for the Central Pacific Transcontinental Railroad (HAER No. CA-196) in order to provide context, as a rare survivor of the initial construction of the pioneer route. Documentation was carried out by Preservation Services, John Snyder Field Director and Historian, and Ed Andersen, Photographer. Photos were made in October and research was carried out from August through March
The federal surveyors worked through Cisco building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER CAL,31-CISCO,2-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.