- Vacant Last Use: Bachelor Enlisted Quarters and Offices Description: Building 459 is in the North End of the Mare Island Historic District, north of the Public Works area and just south of the causeway. It is nestled within a small residential and recreational enclave that is far removed from most residential and social buildings at the base. This small area was built to support a submarine repair facility, which existed along the waterfront well north of the historic shipyards. It is shown in context in Photograph AH-1. It is at the northern edge of Walnut Avenue and is sheltered by the northernmost of the mature trees that line much of that avenue, as shown in Photograph AH-2. Building 459 is a large, 2-story, E-shaped building in the Mission Revival Style.
The building is constructed of reinforced concrete with a stucco finish, on a formed concrete foundation. The roof is hipped, covered in red clay tile. Windows throughout the building are replacement, double-hung aluminum sash. The building retains a few three-light, one panel wooden doors. A handsome cast stone surround is featured at the side entrance and arched windows flank the front entry. The side entrance detail is shown in Photograph AH-9. The area of Building 459 is square feet. It was built in as the Submarine Repair Base Barracks. MARE ISLAND NAVAL SHIPYARD BEQ I Offices (Building HABS No. CA-1543-AH (Page 2) Between and the Works Progress Administration added a courtyard, a mess, bathrooms, and storage areas to the building.
According to the original design, Building 459 was intended to house both officers and enlisted men. The building was designed to be self-sufficient, with room set aside for a tailor, barber shop, cobbler, and galley and mess decks to provide all necessary services. The galley and mess decks ceased operations in the late and the space was converted to offices in the early The building was last used by the Navy as a barracks for chief petty officers and for shipyard office space. The building retains a generally good degree of integrity. Notable modifications include: enclosure of the porch arcade, probably during the replacement of all windows and most doors; and a wood frame addition to the central rear extension.
Historical Context: Building 459 is significant as an example of the Mission Revival style, used in most construction at Mare Island during the and and as a remnant of the early submarine repair base, which was established at Mare Island following World War I. During and following World War I, there was a great growth in the number of submarines in the Navy and a consequent increase in their operations and the spare equipment that was needed on a submarine repair base. By the land on which the submarine complex was built had been fully reclaimed.
The Navy development program for that year authorized extension of the existing submarine base wharf 370 feet to the south, barracks for officers and crews of submarines under repair, a battery charging plant, remodeling of the submarine spare parts and stores building (Building and construction of roads and walks. By the repair complex consisted of about a dozen buildings, a single wharf, and six submarine berths. Building 459 was constructed in as part of the overall expansion of the submarine repair facility, which would grow into one of the major missions at Mare Island. Building 459 was used by submarine crews and officers awaiting repair of their boats at the base. The building contained sleeping accommodations, a mess hall, and limited recreational features.
For several years the MARE ISLAND NAVAL SHIPYARD BEQ / Offices (Building HABS No. CA-1543-AH (Page 3) barracks was surrounded on two sides by nothing but partially reclaimed dredge ponds. Building 459 was unusual among barracks at Mare Island (or at any other Navy facility) in that it accommodated temporary quarters for officers as well as enlisted personnel. The building was designed to be self-sufficient, containing living spaces, a tailor shop, barber shop, cobbler shop, dining areas (mess spaces) and kitchen areas (galley). In renovations were made to the original building by the Works Progress Administration (WPA). The building continued to be used as Bachelor Enlisted Quarters (BEQ) for Chief Petty Officers.
In the early the galley and mess deck were converted to office spaces and were used in that capacity at the time the Mare Island Naval Shipyard closed.