Mare Island Naval Shipyard, Pump House, California Avenue, east side between Dry Dock 1 & Dry Dock 2, near Ninth Street, Vallejo
Mare Island Naval Shipyard, Pump House, California Avenue, east side between Dry Dock 1 & Dry Dock 2, near Ninth Street, Vallejo, Solano County, CA. Surveyed as HABS CAL,48-MARI,1BQ-, with a 932-word written history.
From the record
“Building 110 is a contributing element of the Mare Island Historic District.”
Written record, HABS CAL,48-MARI,1BQ- survey. Machine-read text.
Surveyed by the federal HABS program as HABS CAL,48-MARI,1BQ- · the record runs 932 words · one of 191 surveyed structures published for this county.
Source document
Quoted word for word from HABS CAL,48-MARI,1BQ-.
Not written, edited or summarised by this site.
Building 110 is a contributing element of the Mare Island Historic District. Built in this small octagonal pumphouse served both Dry Dock 1, which was completed in and Dry Dock 2, construction for which began the same year that Building 110 was completed. This building was obviously important functionally, helping to water and dewater the two most important structures in the shipyard. It is also an interesting example of the high quality of brick masonry construction in the shipyard at Mare Island, which persisted well into the century.
Present Use
621 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HABS CAL,48-MARI,1BQ-.
Not written, edited or summarised by this site.
Vacant Last Use: Pump house Description: Building 110 exists along the waterfront in the old shipyard, immediately adjacent to Dry Dock 1. It was built in as a pumping station for Dry Dock 1, which was completed in and in anticipation of nearby Dry Dock 2, which was under construction in and was completed in Its context is that of the dry docks and the immediate waterfront area. Photograph and show the building in relation to Dry Docks 1 and 2. The building is an octagonal brick structure with a two tiered metal roof. Framed in metal, each roof level is covered with sheet copper. A narrow octagonal vent separates the levels. The upper cap terminates in an eyebolt which facilitates removal of the central octagon of the roof.
Skylight windows make up the inner portion of the lower level roof. Roof eaves are lined with molded
Mare Island Naval Shipyard
Pump House (Building HABS No. CA-1543-BQ (Page 2) terra cotta cornice and frieze. Brick pilasters with terra cotta capitals stand at each of the eight corners of the octagonal walls. Headers over doors and windows are formed by concrete lintels molded and scored in the form of splayed stones. The brick building above grade sits over a below grade deep concrete structure in which the pumps are set. Small vertical single paned windows with terra cotta lintels and sills are set in each wall except one where a door gives access to the interior. A substantial concrete block addition was built at the east side of the building at some point after This addition is shown in Photograph BQ- 7. Most of Building 110 is below grade.
The massive pumps and water lines needed to water and de-water the dry docks are housed below grade while the electrical and mechanical controls for that equipment are at grade. The machinery has been upgraded on several occasions, such that the brick walls of Building 110 form a shell for a modern equipment room below. The interior of the building is shown in Photographs through Historical Context: Building 110 was built in about a decade after Dry Dock 1 had been completed and while Dry Dock 2 was still under construction. It appears that planning for this building was initiated as part of the general contract for Dry Dock 2. Initial work on Dry Dock 2 began in The contract was let to the Atlantic, Gulf, and Pacific Construction Company.
The work was supervised by engineer Alexis von Schmidt, a well-known California water engineer who had previously designed private dry docks at Hunters Point in San Francisco. The Atlantic, Gulf, and Pacific Company would fail after a few years and the work was taken over by the Scofield Construction Company of Philadelphia. All early plans for Dry Dock 2 were prepared by the Scofield Company, as were the plans for Building The fact that the building was faced in brick, however, suggests that the Bureau of Yards and Docks may have influenced the design of this building. Thus, the history of Building 110 cannot be understood except in the context of Dry Dock 2. Completion of Dry Dock 2 in represented the completion of the old shipyard.
All subsequent construction, including that of Dry Docks 3 and 4 during the late and would be focused on the Shipyard South area. The design of Building 110 symbolizes the end of the old tradition of design at Mare Island. MARE ISLAND NAVAL SHIPYARD Pump House (Building HABS No. CA-1543-BQ (Page 3) This handsome little brick building, with its terra cotta frieze and cornice, is an early century link to the old shipyard; buildings of this sort would not be built in the Shipyard South area.
Written history
104 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HABS CAL,48-MARI,1BQ-.
Not written, edited or summarised by this site.
The action causing this documentation to be undertaken is the disposal of historic properties at Mare Island Naval Shipyard in accordance with the Base Realignment and Closure Act, as amended in Once the transfer occurs, these National Register properties will no longer be afforded the protection of the National Historic Preservation Act. This documentation is a requirement of the MOA among the Navy, SHPO and ACHP reached in accordance with the regulation for the "Protection of Historic Properties," (36 CFR Part implementing Section 106 of the National Historic Preservation Act.
Mare Island Naval Shipyard
Pump House (Building HABS No. CA-1543-BQ (Page 4) LOCATION MAP
The federal surveyors worked through Vallejo building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HABS CAL,48-MARI,1BQ-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.