Mare Island Naval Shipyard, Drydock No. 2, California Avenue, east side near Ninth Street, Vallejo

Mare Island Naval Shipyard, Drydock No. 2, California Avenue, east side near Ninth Street, Vallejo, Solano County, CA. Surveyed as HABS CAL,48-MARI,1BR-, with a 1,122-word written history.

From the record

“Building commonly called Dry Dock 2, is a contributing element of the Mare Island Historic District.”

Written record, HABS CAL,48-MARI,1BR- survey. Machine-read text.

Surveyed by the federal HABS program as HABS CAL,48-MARI,1BR- · the record runs 1122 words · one of 191 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

128 words

Source document Quoted word for word from HABS CAL,48-MARI,1BR-. Not written, edited or summarised by this site.

Building commonly called Dry Dock 2, is a contributing element of the Mare Island Historic District. Its significance relates chiefly to its historic role in the ship repair and construction business at Mare Island. This dry dock gave Mare Island the capacity to accept work on any ship of the Navy that was then afloat or under design. The existence of this dry dock helped preserve Mare Island's position as the preeminent Navy shipyard in California, at a time in which the usefulness of this inland facility was under scrutiny by Navy planners and political leaders. Dry Dock 2 would continue to serve as the backbone of the Mare Island operation between its completion in and construction of the Dry Docks 3 and 4 in the late and

Present Use

779 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HABS CAL,48-MARI,1BR-. Not written, edited or summarised by this site.

Vacant Last Use: Dry Dock Description: Dry Dock 2, like nearby Dry Dock 1, is a key element of this historic landscape at the waterfront on Mare Island. It is located just south of Dry Dock 1 along the historic waterfront at Mare Island. It is shown in the context of the waterfront in Photograph Photograph shows the structure in the context of the historic shipyard. Buildings 46, 50, and 52, the oldest group of buildings at Mare Island, are at the center of that view. To achieve a much greater length (and avoid demolishing existing buildings), the designers of this facility built it at a 45-degree angle to the shoreline. Dry Dock 2 is a deep concrete bowl, measuring wide (at the crest), long, and 36' deep.

The side and end walls are stepped, permitting workmen to access a vessel at various levels. These concrete platforms may be accessed through concrete

Mare Island Naval Shipyard

Dry Dock 2 (Building HABS No. CA-1543-BR (Page 2) stairways on the side walls. The edges of the dry dock, as well as the edges of the various platforms, are defined by tubular metal railings. Although it is predominantly a reinforced concrete structure, Dry Dock 2 does include granite masonry at crucial structural locations, including the lip of the bowl. The dry dock appears to be largely unmodified, except for changes in its mechanical system and installation of incidental safety devices, such as the metal railing. Historical Context: Dry Dock 2 was built between and during a period of intensive modernization at Mare Island. Two events of worked to transform fundamentally the operations at Mare Island. First, an earthquake leveled many of the unreinforced masonry structures there.

Second, the Spanish-American War helped to convince the Navy and Congress that it was necessary to maintain a substantial fleet in the Pacific. For both reasons, the years after were some of the busiest in the history of Mare Island with respect to construction of new and different building forms. Although new buildings were constructed throughout the base, the most important work took place in the industrial area of the shipyards.

The new construction program in the industrial area included: steps to provide more modern shops; addition of ventilating monitors to existing shops; extensions to lighting, water, and fire protection systems; conversion of the central power plant from coal to oil fuel; an improved waterfront, including construction of dikes to maintain water depth; new berths; a new ferry slip; and reconstruction of the railroad track leading to the freight shed, down Central A venue and in the area of Dock Street south of Dry Dock 2; an extension of the quay wall south of the entrance to Dry Dock 2; and the addition of a larger dry dock Dock 2) capable of docking any ship of the Navy afloat or under design. Dry dock 2 was the key element of this modernization program.

Work on this massive structure commenced in The Atlantic, Gulf, and Pacific Company of San Francisco had the first contract for constructing this structure. The work was supervised by noted engineer, Alexis Von Schmidt, who would also design and supervise construction on private dry docks at Hunters Point in San Francisco. The Atlantic, Gulf, and Pacific Company failed and the work was turned over to Scofield Construction from Philadelphia. The Scofield firm prepared all existing original plans for the dry dock. The second dry dock was distinctive for its concrete design, a MARE ISLAND NAVAL SHIPYARD Dry Dock 2 (Building HABS No. CA-1543-BR (Page 3) major achievement in hydraulic concrete construction during early century California.

Although a modern concrete structure, it pays homage to its masonry predecessor through incised masonry- like elements at its locks and through the use of granite blocks along the upper sill. Construction continued for more than a decade; the dry dock was finished in Dry dock 2 was designed as a "state of the art" facility for its time, capable of accepting any ship the Navy had afloat or in design. At x it was several hundred feet longer than Dry Dock 1, which was completed only a few years before work began on Dry Dock 2. Dry Dock 2 was so long that it had to be built at a 45- degree angle to the shoreline to avoid demolition of the older shops building. This great dock was lined in concrete, with granite masonry used only at selected critical areas.

It would serve as the main dry dock at Mare Island between and the late During the build-up leading to World War II, two other dry docks would be completed, both in the emerging Shipyard South area.

Written history

105 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HABS CAL,48-MARI,1BR-. Not written, edited or summarised by this site.

The action causing this documentation to be undertaken is the disposal of historic properties at Mare Island Naval Shipyard in accordance with the Base Realignment and Closure Act, as amended in Once the transfer occurs, these National Register properties will no longer be afforded the protection of the National Historic Preservation Act. This documentation is a requirement of the MOA among the Navy, SHPO and ACHP reached in accordance with the regulation for the "Protection of Historic Properties," (36 CFR Part implementing Section 106 of the National Historic Preservation Act.

Mare Island Naval Shipyard

Dry Dock 2 (Building HABS No. CA-1543-BR (Page 4) LOCATION MAP

In context

Vallejo, California The place record: every map, photograph and survey of this town.
Solano County, California 258 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Vallejo

24 of 110 records shown

The federal surveyors worked through Vallejo building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Mare Island Naval ShipyardHABS CAL,48-MARI,1-36,508 words
Carquinez BridgeHAER CAL,48-VALL,1-22,059 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1C-8,099 words
Mare Island Naval ShipyardHABS CA-1543-CX5,167 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1G-4,916 words
Carquinez Straits Transmission SpanHAER CA-1914,904 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1-I-4,561 words
Mare Island Naval ShipyardHABS CA-1543-CW4,510 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1J-4,224 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1H-4,011 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1F-3,328 words
Mare Island Naval ShipyardHABS CA-1543-CV2,856 words
Mare Island Naval ShipyardHABS CA-1543-CY2,827 words
Mare Island Naval ShipyardHABS CA-1543-CU2,379 words
Mare Island Naval ShipyardHABS CA-1543-CR2,126 words
Mare Island Naval ShipyardHABS CA-1543-CT2,089 words
Mare Island Naval ShipyardHABS CA-1543-DA2,026 words
Mare Island Naval ShipyardHABS CA-1543-CZ1,955 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1B-1,858 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1AP-1,793 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1D-1,664 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1N-1,636 words
Mare Island Naval ShipyardHABS CAL,48-MARI,1AT-1,616 words
Mare Island Naval ShipyardHABS CA-1543-CS1,568 words

Provenance

  • Written history. Quoted verbatim from HABS CAL,48-MARI,1BR-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.