Mare Island Naval Shipyard, Forge Shop, Railroad Avenue, southwest corner of Railroad Avenue & Twelfth Street, Vallejo
Mare Island Naval Shipyard, Forge Shop, Railroad Avenue, southwest corner of Railroad Avenue & Twelfth Street, Vallejo, Solano County, CA. Surveyed as HABS CAL,48-MARI,1BV-, with a 1,476-word written history.
From the record
“Building is a contributing element of the Mare Island Historic District.”
Written record, HABS CAL,48-MARI,1BV- survey. Machine-read text.
Surveyed by the federal HABS program as HABS CAL,48-MARI,1BV- · the record runs 1476 words · one of 191 surveyed structures published for this county.
Source document
Quoted word for word from HABS CAL,48-MARI,1BV-.
Not written, edited or summarised by this site.
Building is a contributing element of the Mare Island Historic District. The significance of this building is both historical and architectural. Its construction in represented the beginning of the use of the Shipyard South area as a major shipbuilding operation. Building and Building 680 together represent the core of the Shipyard South area. These two buildings, more than any other buildings on the island, were the sites of major contributions of Mare Island to the American war effort during World War II. Architecturally, this building is one of three monumental curtain-wall industrial buildings on Mare Island; the others are Buildings 680 and Together these buildings represent some of the America's earliest and most significant examples of curtain wall shipyard building techniques.
Present Use
1141 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HABS CAL,48-MARI,1BV-.
Not written, edited or summarised by this site.
Metal shop Last Use: Forge Shop Description: Building is, along with Building the structural, functional, and visual core of the Shipyard South. It rivals Building 680 in its footprint, although it is not as tall. The three building numbers apply to three side-by-side, full-length bays; the building is unified structurally. Located in the industrial area of the shipyard, the structure occupies an entire block: Railroad Avenue by Street by Cedar Avenue by Street. It is a steel framed curtain wall building, supported on large vertical steel I-beams. There are two elevator and stairwell shafts on the east fa~ade that appear as towers above the main fa~ade. The roof comprises a series of square light monitors in a castellated pattern. The end monitors are shed roofed.
The walls are enclosed by huge banks of steel
Mare Island Naval Shipyard
Forge Shop (Building HABS No. CA-1543-BV (Page 2) industrial sash, with concrete spandrels and end beams. Each bay is accessed through very large roll-up industrial doors at either end. There are also many steel personnel doors and a few remnants of the original glazed industrial doors. An original glazed rolling door is shown in Photograph Although not technically part of Building there are dozens of plate racks on the west side of the building which have always been used as part of the operation there; these are shown in Photograph The interior of Building comprises three large rooms, each open at both ends.
The three rooms had separate functions at the time they were built and most of the time they were used by the Navy; the Building 386 bay was the forge; the 388 bay was the structural shops, and the 390 bay was the "Shipfitting Shop." The large clear span rooms, however, are adaptable to a variety of uses. Since the closure of Mare Island Naval Shipyard, the building has been reused for civilian metal working purposes. Historical Context: Buildings and 390 all occupy the same structure which is divided into three bays. Since it was built in this large structure was a focal point of the ship construction and repair operation in the Shipyard South area.
Its most significant period of operation was during World War II when it and the other Shipyard South buildings formed the core of the submarine construction and ship repair capabilities at Mare Island. The decision to build Building and the collateral decision to make the Shipyard South into a major ship construction and repair facility, had their origins in congressional appropriation bills passed during World War I. One of the most important provisions of the Navy Department's preparedness program of was for increased facilities for the construction of capital ships and submarines at Navy Yards.
Construction of larger and heavier ships and high-technology underwater craft necessitated the remodeling and rebuilding of cranes, dry docks, shipways, fitting-out berths, and larger shop facilities equipped with modern tools. Improved facilities were necessary for testing and construction of a vast array of smaller vessels, such as destroyers and gunboats. Six million dollars had been made available for improving shop facilities in but no money was earmarked for Mare Island shop and repair facilities until The Mare Island structural MARE ISLAND NAVAL SHIPYARD Forge Shop (Building HABS No. CA-1543-BV (Page 3) group shops (Buildings and was completed in with funding from the wartime appropriation bill.
In all essential features, the building and its equipment duplicated those erected a few years earlier at Norfolk, Virginia and the Philadelphia Navy Yards. This group of buildings comprises a huge steel-framed curtain wall building, consistent in construction methods and architectural treatment with the buildings of Carl Carlson during the World War I era. The combined floor space is about square feet, with massive clear spans and roof heights for ship construction. The building plainly expresses its function as the shipbuilding core of the base and is highly significant as an example of century factory design in addition to its obvious significance in the business of shipbuilding.
Improvements to shipbuilding facilities were prepared under the general supervision of the Board on Department of Navy Yard Plans. In addition to establishing standards and a uniform plan for shops, the board addressed issues of yard layout, the routing of materials to and through shops and between the shops and building ways, and the fitting out of piers, berths, and wharves. In planning the improvements at the various yards, local conditions were taken into consideration, but by following uniform plans a great deal was saved in preparation of designs and details in the fabrication and erection of a number of structures.
Since Mare Island already had an operating shipyard, the expansion to the yard was established to the south of existing facilities in what is here designated the Shipyard South. During the century much of this area was covered with tule lands and tidelands. These were reclaimed before World War I and temporary training facilities were erected over much of the acreage. With demobilization and the establishment of a new Naval Training Center in San Diego, the old receiving ship and recruit training grounds became open and available for new shipbuilding activities. The complex was available for use during the and It was during World War II, however, that the shops saw their most frenetic level of activity.
These great shops were used to fabricate elements of all of the ships that were built at Mare Island, particularly submarines, and also to fabricate elements used in the repair of all types of battle-damaged vessels. Building was the primary shipbuilding facility on Mare Island. MARE ISLAND NAVAL SHIPYARD Forge Shop (Building HABS No. CA-1543-BV (Page 4) The functions of these three important shops during World War II were recorded in detail. During the war, the operations of the three bays were distinctively different, although they represented steps in an industrial process. The Building 386 wing was called the Blacksmith or Forge Shop.
It was used to produce huge amounts of forgings, including shafting, bolts, and turnbuckles, as well as to process large amounts of material through its heat-treating furnaces. At the start of the war, there were over 70 major machine tools and furnaces. This was increased by about 40 new furnaces, forging hammers, and so forth during the period from to inclusive. The personnel in the shop increased from 61 m (one shift) to 365 in (three shifts). The Building 388 wing was called the "The Welding and Cutting Shop." It had about 172 welding machines and other pieces of equipment. The Building 390 wing, called the Shipfitting Shop, had about eighty bending rolls, punches, shears, etc.
By the end of this machine tool inventory had increased to a total of items for both shops, and they had expanded to six small outside working areas. Where they previously had about men, this figure was increased to in
Written history
106 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HABS CAL,48-MARI,1BV-.
Not written, edited or summarised by this site.
The action causing this documentation to be undertaken is the disposal of historic properties at Mare Island Naval Shipyard in accordance with the Base Realignment and Closure Act, as amended in Once the transfer occurs, these National Register properties will no longer be afforded the protection of the National Historic Preservation Act. This documentation is a requirement of the MOA among the Navy, SHPO and ACHP reached in accordance with the regulation for the "Protection of Historic Properties," (36 CFR Part implementing Section 106 of the National Historic Preservation Act.
The federal surveyors worked through Vallejo building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HABS CAL,48-MARI,1BV-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.