Mare Island Naval Shipyard, Hospital Ward, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo
Mare Island Naval Shipyard, Hospital Ward, Johnson Lane, west side at intersection of Johnson Lane & Cossey Street, Vallejo, Solano County, CA. Surveyed as HABS CAL,48-MARI,1BY-, with a 837-word written history.
From the record
“Building H70 is a contributing element of the Mare Island Historic District.”
Written record, HABS CAL,48-MARI,1BY- survey. Machine-read text.
Surveyed by the federal HABS program as HABS CAL,48-MARI,1BY- · the record runs 837 words · one of 191 surveyed structures published for this county.
Source document
Quoted word for word from HABS CAL,48-MARI,1BY-.
Not written, edited or summarised by this site.
Building H70 is a contributing element of the Mare Island Historic District. It is significant historically for its association with the major upgrade of the Mare Island Naval Hospital during the and for the important role it and the other hospital buildings played during World War II. Architecturally, the building illustrates the Mission Revival treatment applied to all of the hospital additions from the and
Present Use
553 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HABS CAL,48-MARI,1BY-.
Not written, edited or summarised by this site.
Vacant Last Use: Navy Guided Missile School Laboratory Description: Building H70 was built in and reflects two basic trends in the operation of the hospital during the mid- l First, the Naval Hospital was the scene of a major expansion; the Navy undertook nearly of improvements (more than $4 million in modern equivalencies) to the hospital during that decade. Second, the architectural treatment of these new buildings differed fundamentally from previous work in the area, or anywhere else at Mare Island. Building H70 was built as a contagious diseases ward and, for that reason, was sited some distance from the main hospital complex.
The building is nestled into the hillside overlooking the hospital complex, as shown in the attached contextual views, B Y-1 and Building H70 is a two-story reinforced concrete structure with a hipped roof in Mission tile. It features a projecting central bay,
Mare Island Naval Shipyard
Hospital Ward (Building HABS No. CA-1543-BY (Page 2) extending about four feet beyond the rest of the building. It also includes flat-roofed bays at either end; these were built as open-air rooms for the patients (similar bays exist at the ends of the wings on Building The windows throughout the building are six- over-six double-hung sash, many of which are now hidden behind metal grills. The building is accessed via tall concrete steps; these steps are shown in Photograph The main door is centered on the facade (east elevation) and includes a concrete surround with piers and an architrave.
Building H70 has been modified extensively, with many of those changes attributable to its conversion to non-hospital uses in the mid- l Tall concrete additions were built at the rear corner of both side elevations; these are shown in Photograph and BY- 6. Intrusive metal stairs were built on both side elevations, located just in front of the concrete wings. These concrete wings and stairs diminish the integrity of the two side elevations and, to a lesser degree, of the facade. The interior was modified dramatically when this building was converted to non-hospital uses.
Many of the more important interior spaces are now occupied by ductwork and wire harnesses, as shown in Photograph Historical Context: Building H70 was built in as part of a major program to upgrade the hospital at Mare Island. At a cost in excess of the U. S. Naval Hospital began a program to modernize its facilities in including construction of contagious and general hospital wards (Buildings H70 and respectively), quarters for sick officers (Building and a medical corps barracks (Building The main hospital building was also expanded in with construction of a five-story, L-shaped, reinforced concrete wing, extending to the northwest.
Expansion of these hospital facilities required installation of a separate heating plant near the hospital (Building and an electrical substation (Building to service the enlarged hospital complex. On the eve of World War II, construction began on a second major hospital wing on the southeast side of the old hospital that essentially duplicated the addition. These numerous additions to the hospital were completed in a timely manner. The Mare Island hospital was never busier than it was during World War II; the major contributions of Building H72 and the other hospital facilities were made during that war. MARE ISLAND NAVAL SHIPYARD Hospital Ward (Building HABS No. CA-1543-BY (Page 3)
Written history
107 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HABS CAL,48-MARI,1BY-.
Not written, edited or summarised by this site.
The action causing this documentation to be undertaken is the disposal of historic properties at Mare Island Naval Shipyard in accordance with the Base Realignment and Closure Act, as amended in Once the transfer occurs, these National Register properties will no longer be afforded the protection of the National Historic Preservation Act. This documentation is a requirement of the MOA among the Navy, SHPO and ACHP reached in accordance with the regulation for the "Protection of Historic Properties," (36 CFR Part implementing Section 106 of the National Historic Preservation Act.
The federal surveyors worked through Vallejo building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HABS CAL,48-MARI,1BY-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.