Zaca Creek Bridge No. 1, Spanning Zaca Creek at Jonata Park Road, Buellton, Santa Barbara County, CA. Surveyed as HAER CAL,42-BUEL.V,3-, with a 4,409-word written history.

From the record

“Zaca Creek Bridge No. 1 is significant because it is a rare example of a pre- World War I short-span reinforced concrete girder bridge once common in California.”

Written record, HAER CAL,42-BUEL.V,3- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,42-BUEL.V,3- · the record runs 4409 words · one of 167 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

46 words

Source document Quoted word for word from HAER CAL,42-BUEL.V,3-. Not written, edited or summarised by this site.

Jonata Park Road spanning Zaca Creek 2.6 miles north ofBuellton Santa Barbara County, California USGS Zaca Creek, California, quadrangle UTM Coordinates: Z..'Z,\e. 3, i 311 l 1 Date of Construction: Engineer: Edward L. Mayberry, Llewellyn Parker, and Fred L. Johnston Builder: Charles Krug and Robert Sneathen

Significance

4291 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,42-BUEL.V,3-. Not written, edited or summarised by this site.

Zaca Creek Bridge No. 1 is significant because it is a rare example of a pre- World War I short-span reinforced concrete girder bridge once common in California. Additionally, the important Los Angeles engineering firm of Mayberry & Parker designed the bridge-these engineers fashioned innovative concrete reinforced bridges and structures in various places throughout the western United States. The bridge is part ofthe original state highway system alignment that established an all-weather route in Santa Barbara County which makes Zaca Creek Bridge No. I locally important. Report Prepared By: Kevin (Lex) Palmer Applied EarthWorks, Inc. North Fruit Avenue Suite 101 Fresno, CA 93 711 Date: July ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page2

Description

Zaca Creek Bridge No. 1 is an 85-foot-long reinforced concrete girder bridge (Photos 1 and 2). The two-lane flush roadway bridge is 25 feet wide with two spans and has a bituminous surface over concrete. The reinforced concrete main span has a standard girder and spaced soffit. This smooth- surfaced bridge has solid rails and no pedestrian walkway. A bronze commemorative plaque is located on the southeast pilaster (see Photos 3 and Historic concrete posts and steel guard rails exist on both sides of the south road approach and on the west side of the north road approach. Zaca Creek Bridge No. 1 is located on Jonata Park Road, which takes its name from the Rancho San Carlos de Jonata land grant that the study area lies within.

The bridge lies near the east terminus of the east-west trending Purisima Hills, which are typified by oak savannah vegetation and shallow canyons formed by seasonal streams (see Photo 1). These hills, which border the study area on the east and west, rise an average of300 feet above the bridge to a typical height of900 feet above sea level. Highway engineers took advantage of this topographical break in the Purisima Hills formed by the effects of eight creeks that join Zaca Creek immediately north of the study area and flow south for approximately 2 miles to the Santa Ynez River. The study area is typified by valley oak, scrub oak, pine, and willows growing in Zaca Creek. Highway 101 is located immediately to the east; the road forms the north and south borders of the bridge.

Zaca Creek, a gun and bow club, and an electrical substation are found to the west of the bridge. On-site reconnaissance of the bridge, a review of Santa Barbara County engineering drawings and reports, and archival research indicate that the structure has lost some of its physical integrity. Two commemorative plaques existed on the southeast and northwest pilasters. The northwest pilaster has been struck and the plaque is no longer present. The curb iron also is no longer extant. As noted above, Highway 101 is situated immediately east of the bridge. A concrete culvert is within the highway embankment, and a wing wall from this structure has been joined to the bridge on the northeast corner of the second span's northeast pier (Photo 6). ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page 3 II.

ARCIDTECTURAL AND ENGINEERING INFORMATION Zaca Creek Bridge No. 1 Station 448 was designed by Edward L. Mayberry, and Llewellyn Parker of Los Angeles in association with Fred L. Johnston of Santa Barbara. Santa Barbara general contractors Charles Krug and Robert Sneathen ofKrug & Sneathen constructed the bridge in for (Clerk of the Board File Agreement). Prior to the California Highway Commission required counties to build bridges for the new state highway system. With its rugged terrain that required over 100 bridges, Santa Barbara County hired the Los Angeles civil engineering firm of Mayberry & Parker during the State Highway 2 construction project to design county highway bridges. The engineers had an excellent reputation for designing reinforced concrete bridges and buildings.

Working with specifications provided by Santa Barbara County Surveyor OwenH. O'Neil, Mayberry & Parker and Johnston produced a series of bridge plans for the Zaca Creek area in the 3rd Road District and the highway between Gaviota and Santa Barbara (Snyder 1). A notable extant example oftheir work in Santa Barbara County is the Arroyo Quemado Bridge on Highway 101 north of Refugio State Park (Bridge No.

The Santa Barbara County Board of Supervisors authorized Mayberry & Parker to design the six Zaca Creek bridges, three others near Los Alamos, and four in De La Cuesta Canyon in (Morning Press Other county bridge projects at the time included construction of a Santa Ynez River crossing; in the month of November 17 bridges were in various stages of construction (Morning Press Santa Barbara County placed a notice for sealed bids in the 19 February Morning Press for construction ofthe Station 448 +00 bridge. Ten bids came from contractors based in Santa Barbara, San Francisco, and San Luis Obispo-Los Angeles firms submitted the highest number of proposals. The bids ranged from a high of to Krug & Sneathen's winning low bid of$10,436 (Clerk of the Board File Rejected Bids).

City directory information suggests that Charles Krug and Robert Sneathen formed a brief partnership to take advantage of the numerous available highway construction contracts (Santa Barbara City Directory The Krug and Sneathen partnership only constructed one of the Zaca Creek bridges and information could not be located on other work performed by these contractors. The bridge was built between March and June under Krug and Sneathen's direction. County Engineer O'Neil required the contractors to use open hearth steel for reinforcement work. Krug and Sneathen encountered some delay in the project due to difficulty in receiving a shipment of steel from the Pacific Coast Steel Company.

While the excavation work had been completed by mid-May, a lack of steel forced the contractors to lay the work crew off (Clerk of the Board File Application for Extension of Time). This was not unusual, as steel was difficult to obtain on the west coast. ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page4 After setting the reinforced steel, the contractors used the following concrete proportions provided by County Surveyor O'Neil to construct the bridge. Concrete Proportions Coarse No. 1 Coarse No. 2 Cement Sacks 1 Fine Aggregate Aggregate Class Use (no.) (cubic feet) (cubic feet) (cubic feet) A All reinforced concrete 1 2.0 2.0 1.5 B Caissons 1 2.5 3.0 2.0 194-powid sacks. Concrete was mixed by a batch mixer and poured into forms that had studding wired together with No. 10 galvanized wire.

Upon completion of construction, the abutments as well as the backs and ends of the wing wall received a coat ofasphaltic paint (Clerk of the Board File Agreement). Based on documents from contemporaneous bridges constructed on Zaca Creek, this bridge would have been built using subcontractors who supplied horse-drawn dump wagons to haul fill. Quarry sources included a supply at the mouths of Cuesta and Zaca canyons, while other contractors shipped crushed rock in by rail car. Other tasks such as pile driving also were subcontracted out (Clerk of the Board File Notice of Claim; Application for Extension). Specifications provided by Santa Barbara County Surveyor 0. H. O'Neil called for an 80-foot bridge; however, the structure measures 85 feet long.

The 25-foot-wide reinforced concrete main span has a standard girder and spaced so:ffit. This smooth-surfaced bridge has solid rails and no pedestrian walkway. A bronze commemorative plaque is located on the southeast pilaster (see Photos 3, 4, 9, and 11; Drawing 1). Historic concrete posts and steel guard rails exist on both sides of the road approach and on the west side of the north road approach. A series of five rectangular recesses are found in both sides of each span's rail. A so:ffit extends down from the exterior rails along the north and south girder spans. Pilasters cap the north and south ends of both rails. Bronze commemorative plaques were placed on the interior of the northwest and southeast pilasters.

The south girder span and north girder span are supported by the abutments, piers, and floor system. The south abutment corresponds to the north abutment, except that the wing walls on the south abutment are nearly 50 percent larger than the north abutment wing walls (Photos 5 and 6, Drawings 2 and 6). Both abutments are devoid of weep holes, and all the wing walls have a ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page 5 45 degree angle. The piers that support the spans have a diamond configuration on the pier base to deflect debris carried by Zaca Creek (Photo 8, Drawings 2 and 5). The floor, which employs the Arch Rib System developed by Mayberry & Parker and Johnston, is a vaulting configuration underneath the two girder spans (Photo 7, Drawing 3).

Construction of the six Zaca Creek bridges took place between February and October County plans indicate all the bridges possessed Mayberry & Parker and Johnston design qualities and technology, including the Arch Rib System they developed for the floor system (Clerk of the Board Files 203 7 and 203 8: Bridge Plans). On the southernmost bridge, local contractors M. R. Dominguez and H. E. Walter entered into a contract with the County of Santa Barbara on 22 May to build an 85-foot reinforced concrete girder bridge at Station 310 The Santa Barbara-based firm beat out five other Los Angeles contractors with a bid of$26,000 (Clerk of the Board File Bids for Construction). William M.

Ledbetter of Los Angeles secured contracts to build three bridges at Stations 562 565 and 574 +75 by putting in three low bids. Ledbetter also constructed the extant Arroyo Quemado bridge. Zaca Creek Bridges Constructed in Station Bridge Traits Contractor Comments Station 310 +50 Two 41.8-feet-long and 23.8-feet-wide M. R. Dominguez and Demolished simple girder spans with central pier H. E. Walter of Santa and abutment wing walls Barbara Station 448 +00 Two 42-feet-long and 25-feet-wide Charles L. Krug and Extant, demolition pending simple girder spans with central pier Robert A. Sneathen and abutment wing walls partners in Krug & Co. Station 472 Three simple girder spans 88 feet long No information Extant, demolition pending and 23.

7 feet wide Station 562 +50 One simple girder span 45 feet long W. M. Ledbetter of Demolished and feet wide with abutment Los Angeles wing walls Station 565 +50 One simple girder span feet long W. M. Ledbetter of Demolished and feet wide with abutment Los Angeles Extended feet long wing walls northeast wing wall Station 574 +75 One simple girder span feet long W. M. Ledbetter of Demolished and feet wide with abutment Los Angeles wing walls ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page6 Ledbetter bid on the Station 562 +50 bridge project, for the Station 565 +50 bridge, and for construction of the Station 574 +75 bridge (Clerk of the Board File Proposal for Construction; Clerk of the Board File Proposal for Construction).

During construction, Ledbetter utilized rock shipped by rail from a Pacific Coast Coal Company quarry and a second pit in Watsonville for construction of all three highway bridges (Clerk of the Board File 203 7: Request for Extension). State transportation officials authorized realignment of Highway 101 to the east in This decision forced motels and roadside businesses located on what became Jonata Park Road to close by the early (Santa Barbara News Press Four of the six Mayberry & Parker- designed bridges were demolished during the realignment. ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page?

Id. Historical Information

Community History The study area lies within the Rancho San Carlos de Jonata land grant, one of nearly 40 ranchos granted in present-day Santa Barbara County between and Granted to Jose Covarrubias and Joaquin Carrillo in the acre rancho extended north of the Santa Ynez River. The drought broke the Covarrubias and Carrillo cattle partnership, and they sold the tract to Rufus Thompson Buell in Rufus and his brother developed the former rancho into a diverse farming operation. The Buell ranch produced crops typical of contemporary late nineteenth century farms in Santa Barbara County and coastal California.

The Buells operation included dryland grain (wheat, com, and barley) farming, wine grapes, fruit trees, dairy cows, sheep, and cattle (Easton Gallery Mason A small community named Buellton grew on the north bank of the Santa Ynez River approximately 3. 5 miles north of the Buell Ranch. Buellton historically has been an unincorporated service community that catered to the local residents and highway travelers. The town's juxtaposition between the north-south Highway 101 route and east-west trending Highway 150 (today's Highway proved an ideal stopping place for those traveling between north and south Santa Barbara County and a destination for residents of the farming communities in the Lompoc and Santa Ynez valleys.

Buellton served as a stage stop for travelers heading east to Los Olivos on the stagecoach lines that serviced Santa Barbara County during the These lines connected to wharves at Gaviota and Lompoc where passengers could board coastal steamers. Travelers continued to pass through Buellton on their way to Los Olivos to catch the northbound Pacific Coast Railroad beginning in which allowed them to link up with a San Francisco-bound train (WPA Buellton's service role grew as the automobile age fueled an increase in travelers during the early twentieth century.

A paved route spanning the Santa Ynez River, of particular importance to Buellton's success, did not come until Crossing the river during the nineteenth century had proven fatal to a number of travelers on horseback and in stagecoaches who perished in high water or quicksand. With burgeoning automobile traffic in mind, state legislators authorized an $18 million bond issue in voters passed the measure the following year and a series of road building projects began. The State Legislature also created the California State Highway Commission to oversee this effort. The commission sought to establish a paved road from San Diego north to the Oregon border that would roughly follow El Camino Real.

Known as State Highway 2 in the route became today's Highway one of the first major California highways. The drier interior weather of the Santa Ynez Valley and other factors prompted the State Highway Commission to place the road through ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page8 the smaller communities of Los Alamos and Buellton, rather than coastal burgs like Lompoc (Wilkinson Because the Highway Commission required counties to construct their own bridges, Santa Barbara County spent hundreds of thousands of dollars for bridge construction between and The County Board of Supervisors ignored County Surveyor Owen O'Neil's pleas for more personnel to aid in the bridge planning effort. O'Neil turned to consultants in Los Angeles for able bridge engineers.

By offering 2.5 percent of construction costs, O'Neil lured in quality engineers such as Mayberry & Parker, Thomas & Post, and Edward T. Flaherty. With more than 100 bridges to build, the County Board of Supervisors utilized designers from the California Highway Commission to expedite fashioning the reinforced concrete bridge at Arroyo Honda in (Federal Highway Administration Period newspapers are filled with reports of new auto stages and roads being established across Santa Barbara County. Following completion ofthe new state highway and its series ofbridges, automobile traffic naturally increased as auto camping and touring became popular. A Work Projects Administration (WP A) guidebook described the study area in " ...

the highway curves along the western rim of the Santa Ynez Valley, with the green-forested slopes of the La Purisima Hills dropping to the highway's edge" (WPA Buellton' s role as a farming supply center diminished as highway traveler services such as gas stations, motels, and roadside restaurants became prominent. In the late a tavern keeper became known for serving excellent split pea soup. Buellton established a reputation as the "Home of Split Pea Soup" with three competing restaurants by (WP A 8). Roadside diners such as Anderson's Pea Soup and Mullen's Dining Cars served meals to auto travelers on Highway 101 during the post-Word War II boom years. The extant Dining Cars Cafe, a street car roadside diner, was established in a short distance south of the Zaca Creek Bridges.

State transportation officials had Highway 101 realigned to the east in This decision forced businesses on what became Jonata Park Road to close by the early and the area is now primarily residential and agricultural in nature (Santa Barbara News Press Technological History Zaca Creek Bridge No. 1 is significant because it is a rare example of a pre-World War I short-span reinforced concrete girder bridge once common in California. Between and 36 percent of California bridges were in this class, and 82 percent of all bridges were of reinforced concrete (Federal Highway Administration Zaca Creek Bridge No. 1 exhibits construction techniques popular at the time and vernacular engineering techniques developed by consulting civil engmeers. ZACA CREEK BRIDGE NO. 1 HAER No.

CA-258 Page9 Use of reinforced concrete in the United States began in Although American engineers did not adopt the technology as quickly as those in Europe, by the early twentieth century concrete became more universally accepted as a building material. Reinforced concrete became popular in the United States following the Universal Cement Exhibit at the Panama Pacific International Exposition in San Francisco. Factors such as economy, ease of construction, and fireproof qualities resulted in a popular craze for the building material.

County Surveyor O'Neil followed a common practice by public agencies when he hired Mayberry & Parker to design a series of bridges, a hiring practice which faded away after (Federal Highway Administration O'Neil was challenged by the fact that the Highway 2 construction project was one of the earliest major routes through the state. Construction of approximately 100 miles of road in Santa Barbara proved difficult due to the lack of an established procedure and high number ofrequired bridges. O'Neil' s use of consultants both helped resolve the bridge problem and produced a series of unique structures that represent the lack of civil service engineering expertise then available in the public sector.

This situation nearly completely reversed itself by when state-employed engineers designed the bulk of California bridges (Federal Highway Administration American reinforced concrete bridges tend to have larger massing than their European counterparts. In California, the shortage of steel was offset by the availability of local high-quality cement and resulted in the state leading the nation in number of reinforced concrete bridges. The engineers who fashioned the majority of California bridges used concrete in a spirit of vernacular engineering. Their innovation resulted in a number of new systems, many of which were patented, including the Arch Rib System that the Mayberry & Parker and Johnston team utilized in the Zaca Creek bridges (Federal Highway Administration Drawing 3).

The civil engineering team ofMayberry & Parker has been well documented (Snyder Edward Mayberry, had family roots in the California building trade that dated to the gold rush. Mayberry was schooled at the University of California and Massachusetts Institute of Technology (M.I.T.). After obtaining work experience, he formed a partnership in Los Angeles in with Llewellyn Adelbert Parker. Mayberry had met Parker while he attended M.I.T. The men appear to have had similar early career experiences with private architecture/engineering firms which led them to leave and start their own business. The Mayberry & Parker partnership lasted from to and was based in Los Angeles (Snyder During their partnership, the engineers focused on reinforced concrete and structural steel.

The men fashioned a number oflarge buildings throughout the west, including the Panorama Theater in Los Angeles and a series ofreinforced concrete Santa Fe Railroad hotels and stations (Snyder Mayberry & Parker also became known for their bridge designs, such as the Arroyo Seco Linda Vista Viaduct in Pasadena believed to have been the first reinforced concrete viaduct-style bridge in the United States. Other projects included the Prospect Avenue Bridge, also in Pasadena, and the ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page 10 Salt River Bridge in Phoenix, Arizona. The Salt River Bridge was the longest concrete girder bridge in the world when it was completed in To the south of the study area, the men fashioned a series of 10 reinforced concrete bridges in Ventura County.

In Santa Barbara County, Mayberry & Parker are known to have designed the San Antonio Creek Bridge (No. in a 54-foot- long reinforced concrete girder bridge (Snyder The Arroyo Quemado Bridge (Bridge No. also designed in is located north of Refugio State Park and has two two-rib reinforced concrete open spandrel arches with 11 spans. William Ledbetter constructed this bridge in addition to the three Zaca Creek bridges (Snyder 1). While the civil engineering team of Mayberry & Parker is well know, little information could be obtained on engineer Fred L. Johnston. County documents indicate that Johnston joined Mayberry & Parker in (Clerk of the Board File Specifications).

It appears that Fred Johnston, a Santa Barbara engineer, served as the local contact for the Mayberry & Parker Santa Barbara County Highway bridge design project. No information is available on Johnston in engineer trade sources such as Engineering News, The Architect and Engineer of California, and other standard professional biographical sources. Santa Barbara city directories indicate that Johnston worked as a civil engineer between and Perhaps in response to a slow-down in bridge construction projects following completion ofthe state highway, Johnston entered Santa Barbara's brisk real estate business (Santa Barbara City Directory Another factor may have persuaded Johnston to change careers-by only Division of Highways engineers designed highway bridges.

As previously discussed, Santa Barbara County Surveyor Owen Hugh O'Neil played a large role in bridging Santa Barbara County and warrants attention. During the early twentieth century O'Neil gained practical engineering training through work as a transitman, draftsman, and field engineer in the employ of the Santa Barbara City Engineer and Santa Barbara County Surveyor. He became County Surveyor in a position he held until 0 'Neil was active in professional engineering organizations (Snyder He played an important is role in estimating the costs, drafting the bridge specifications, and overseeing construction of the Santa Barbara County State Highway bridges from to All of the above persons and factors contributed to the construction ofZaca Creek Bridge No. 1.

The structure represents the rise in automobile culture, growth of transportation in Santa Barbara County, and ways vernacular engineering solved problems using reinforced concrete to bridge the Zaca Creek area in Santa Barbara County. ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page 11 IV.

Sources

Easton Gallery Ranchos Santa Barbara Land Grant Ranches. Jane Freeburg, Santa Barbara, California. Federal Highway Administration National Register Eligibility Determination for Historic Bridges in California: Concrete Arch, Concrete Girder, Concrete Slab, Canticrete, Stone Masonry, Suspension, Steel Girder and Steel Arch. Federal Highway Administration, Washington, Mason, Jesse D. Facsimile Reproduction of Thompson and West's History of Santa Barbara & Ventura Counties California. Howell-North, Berkeley, California. Morning Press [Santa Barbara] Supervisors to Provide for 13 Bridges. 7 December: 10. Santa Barbara, California. Good Progress Is Made on Bridges. 7 November: 11. Santa Barbara, California.

National Park Service Historic American Building Survey/Historic American Engineering Record (HABS/HAER) Online Database. ParkNet, National Park Service Links to the Past, www.cr.nps.gov/habshaer. National Register ofHistoric Places, National Register Information System (NRIS)/Index to Listings. ParkNet, National Park Service Links to the Past, www.cr.nps.gov/nr. Price, Barry A. Historic Property Survey Reportfor the Jonata Park Road Bridges Replacement Project, Santa Barbara County, California. Applied EarthWorks, Inc., Fresno, California. Submitted to Santa Barbara County Department of Public Works, Santa Barbara, California. Santa Barbara County Board of Supervisors Clerk of the Board Records, Files On file, County Administration Building, Santa Barbara, California.

Santa Barbara Directory Company City Directory, Santa Barbara, California. Santa Barbara Directory Company, Santa Barbara, California. ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page 12 Santa Barbara News Press Railroad Dining Car Cafe Still Stands Near Buellton. 2 March:B-1. Santa Barbara, California. Diner Serves Up Helping of History. 10 July:D-1. Santa Barbara, California. Snyder, John W. California Department of Transportation Memo to Historical/Architectural File, San Antonio Creek Bridge, Bridge No. 6 February. An Evaluation of Arroyo Quemado Bridge on P.M 39. 75. California Department of Transportation, Sacramento. Wilkinson, Nancy Lee Perpetual Frontiers of the Central Coast: The Lompoc and Santa Maria Valleys, Santa Barbara County, California. dissertation, University of Oregon.

Works Projects Administration Santa Barbara: A Guide to the Channel City and Its Environs. Southern California Writers' Project. Hastings House, New York. Plans Reinforced Concrete Bridge on the State Highway over Zaca Creek at Station 448 (77-A-48-Z-1 to 77-A-48-Z-6}, Drawings County Administration Building, SantaBarbara, California. ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page 13 V. PROJECTINFORMATION Zaca Creek Bridge No.

I (SIC-225 Station 448 on Jonata Park Road (see attached location map) will be demolished as part of the Jonata Road Bridges Replacement Project (Price A Memorandum of Agreement (MOA) has been approved by the Federal Highway Administration (FHWA) and California State Historic Preservation Officer (SHPO) and accepted by the Advisory Council on Historic Preservation (ACHP). The MOA requires the County of Santa Barbara Public Works Department, the current bridge owner, to mitigate project effects through Historic American Engineering Record (HAER) documentation. Project Manager for the recordation was Barry Price of Applied EarthWorks, Inc. Kevin (Lex) Palmer of Applied EarthWorks, Inc. served as Principal Investigator, and William B.

Dewey of Santa Barbara, California, was the project photographer. ZACA CREEK BRIDGE NO. 1 HAER No. CA-258 Page 14 / . . ..1 N i \ (_; 16 Location Map Quad Name: Zaca Creek Bridge No. 1 Zaca Creek, Calif. T7N - USGS Quad 0 E-----3 E-----3 1 l! E-----3 E------1 E------1 Jonata Park Road Bridges Mile Replacement Project 0 Santa Barbara County, CA Feet 0 5 BROS-0083 E---3 E---3 E-3 E--3 E--3 Kilometer BROS-0083(17) Contour Interval: 40 Feet Prepared by Applied EarthWorks, Inc.

In context

Buellton, California The place record: every map, photograph and survey of this town.
Santa Barbara County, California 294 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Buellton

3 records

The federal surveyors worked through Buellton building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Zaca Creek Bridge No. 2HAER CAL,42-BUEL.V,4-4,014 words
La Casa de Cota de la CuestaHABS CAL,42-BUEL.V,2-310 words
La Casa de Eduardo de la CuestaHABS CAL,42-BUEL.V,1-275 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,42-BUEL.V,3-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.