This magazine structure (Building No. A-210), built in is considered significant for its association with United States (U.S.) Naval history and the Mare Island Naval Shipyard (MINSY), the first Naval installation on the West Coast of the U.S. This warehouse is a contributing element of the successful base operations at MIN SY. It is a representative example of magazine design, construction methods and materials used at MINSY during the World War II era, and it is one of at least seven identical magazines built at this base in the same year. Description: This magazine (Building A-210) is a 5,356-square-foot, one-story, rectangular-shaped building of a functional design. The structure is located at the south end of the shipyard just off of Kieper Road.
This area includes high explosive magazines and munitions handling facilities. The magazine was built near a railroad spur line that serviced the hillside magazines. In later years the spur tracks were removed and replaced with asphalt roads. The magazine is buried into the hillside with only the front facade (south) side visible. The building's walls are constructed of steel reinforced concrete. The roof is reinforced concrete supported by reinforced concrete interior columns and is covered by two feet of earth. Four metal vents are set into the roof and extend above the earthen cover. Only one of the vent includes a cap. The building walls and interior columns are supported on reinforced concrete Mare Island Naval Shipyard, Magazine (Building No. A-210) HABS No.
CA-1543-CQ Page2 footings. The front facade of the magazine consists of a flat concrete wall with east and west angled wings. The total length of this facade is 181 feet; the central portion is 103 feet long and each wing is 39 feet long. Fenestration on the front facade of this magazine structure is symmetrical, with two sets of double doors and six windows. The two sets of doors are steel plate and are symmetrically placed on the wall. Each double door measures eight feet wide by eight feet, six inches high. A metal-screen-covered vent is located at the bottom of each door, and a louvered vent built is into the doorframe over each set of doors. There are four vents evenly spaced on the roof. Concrete awnings are set over the frames of both sets of doors.
Four of the windows are evenly space between the two doors, two evenly spaced to the east side of the easternmost door and two are evenly spaced to the west side of the westernmost door. All windows are fixed glass block, each measuring approximately 6 feet long by two feet, eight inches high. The front facade has a concrete loading dock that extends along the length of the 103-foot portion of the building and includes formed concrete stairs (seven risers) on the east and west ends. The wooden ramp that leads to the westernmost set of doors is later addition to the building. At least six other magazines at MIN SY (Building Nos. A-207, A-211, A-212, A-213, A-218, and A-219) were built identically to Building A- Historical Context: This magazine structure (Building No.
A-210) was constructed as part of the facility known as Mare Island Naval Shipyard (MINSY), located in Vallejo, California. The shipyard was established by the U.S. Navy in as a ship building and repair facility. MINSY was the first West Coast naval installation and was the only such facility in California for many years. MIN SY' s built environment is the product of over 100 years of construction and consists of a blend of buildings that demonstrate many different historical functions, construction technologies and architectural styles. Building No. A-210, constructed in is located at the southern end of the island within the Naval Ammunition Mare Island Naval Shipyard, Magazine (Building No. A-210) HABS No. CA-1543-CQ Page3 Depot.
The ammunition depot is the "least densely occupied area of the island and it retains the greatest degree of natural integrity, a fact attributable to its usage over time for the storage of munitions" Historical Consulting with PAR Environmental Services, Inc. 1996:Section 7, page In response to growing tensions in Europe, the U.S. Congress, in decided to expand the size of the American fleet by 20 percent. This expansion escalated at the end of with the entry of the U.S. into World War II. The Ammunition Depot increased its production and storage facilities in order to provide plenty of temporary storage of ordnance, manufacture of certain specialized ordnance, and repair of ordnance during the war.
The surviving buildings and structures from the World War II era represent an important collection of buildings, "arranged in a manner that enables an understanding of how the base functioned at that time" Historical Consulting with PAR Environmental Services, Inc. 1996:Section 8, page Building A- along with at least six other magazines of identical design (A-207, A-211, A-212, A-213, A-218, and A-219), was built during the war effort for the storage of munitions and was set along a railroad spur within the base Ammunition Depot. By Building A-210 was being used for storage for the nearby golf course. Magazine structures have been at MINSY since the early stages of its development as a military base.
The first magazine structure there was completed in Early magazines were mainly constructed of brick or sandstone. A explosion damaged and destroyed many of these buildings. Although several steel-framed, metal-clad magazine buildings were constructed after the explosion, by the beginning of World War I, the Bureau of Ordnance adopted standardized designs for the construction of magazines. As per these designs, potentially explosive materials had been stored underground in isolated areas for safety and temperature control. This new type of magazine was constructed of reinforced concrete, built into the side of hills, and included steel doors, framed with concrete wings as the only means of entrance into the building.
Four such magazine structures were built as MINSY in From this point and into the World War II years, many underground reinforced concrete magazines were built. The designs of these structures changed as the years went by, although they were always of reinforced concrete. Mare Island Naval Shipyard, Magazine (Building No. A-210) HABS No. CA-1543-CQ Page4