BlockBefore

Big Creek Hydroelectric System, Powerhouse 3 Penstock Standpipes, Big Creek, Big Creek

Big Creek Hydroelectric System, Powerhouse 3 Penstock Standpipes, Big Creek, Big Creek, Fresno County, CA. Surveyed as HAER CAL,10-BICRK.V,1B-, with a 2,925-word written history.

From the record

“Three of the four powerhouse no. 3 penstock standpipes were constructed in during the Big Creek System period of significance Their significance derives from association with the Big Creek Historic District as an original system component.”

Written record, HAER CAL,10-BICRK.V,1B- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,10-BICRK.V,1B- · the record runs 2925 words · one of 32 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

62 words

Source document Quoted word for word from HAER CAL,10-BICRK.V,1B-. Not written, edited or summarised by this site.

At a bend in the San Joaquin River and the confluence with Jose/Mill Creek in the southwest 114 of Section 17, T. 9 S., R. 24 E., Fresno County, California (UTM Coordinates in the western Sierra Nevada Mountain Range approximately 6.4 miles northeast of Auberry, California, and approximately 40 air miles east of Fresno. Date of Construction: Builder: Southern California Edison Company

Significance

2777 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,10-BICRK.V,1B-. Not written, edited or summarised by this site.

Three of the four powerhouse no. 3 penstock standpipes were constructed in during the Big Creek System period of significance Their significance derives from association with the Big Creek Historic District as an original system component. The Big Creek System is significant as a classic example of hydroelectric engineering and technology, for its association with John S. Eastwood, Henry E. Huntington, and George C. Ward, and its contribution to development of the Los Angeles metropolitan Area. Report Prepared By: Thomas T. Taylor Southern California Edison Company Environmental Affairs Division Rosemead, CA Date: March 1, Big Creek Hydroelectric System, Powerhouse 3, Penstock Standpipes HAER No. CA-167-B (Page 2)

Description

When constructed in Big Creek Powerhouse No. 3 was characterized the Electric Giant of the West (Shoup With a capacity of horsepower, making it the most powerful hydroelectric plant in the western United States (ibid.), it was the one of the key components of the great expansion of the Big Creek Hydroelectric System during the Each of the three original kva generation units installed in Powerhouse No. 3 in 23 were fed by separate penstocks constructed in a parallel line from the fore bay (photo 1). These penstocks were vented by way of approximately 200 foot tall standpipes arranged in a triangular formation and connected to each other by steel lattice-work (SCE Drawing When unit no.

4 was installed in a fourth penstock and standpipe were erected (photos 2 and 3); this additional standpipe was connected by steel lattice-work to the originals (photo 4). By the time unit no. 5 was installed in it was found to be more economical to install state-of-the-art mechanical ventilators on the penstock feeding that unit instead of another standpipe (photo 5). The 21 x 21 foot Tunnel No. 3 was driven approximately 5.3 miles through solid granite south from Dam No. 6, located just downstream from Powerhouse No. 8, to a point above Powerhouse No. 3. The capacity of Tunnel No. 3 was double that needed for the initial Powerhouse No. 3 project, anticipating the addition of future generation units (Redinger At the critical junction between Tunnel No.

3 and the powerhouse penstocks, a 200 foot tall hourglass shaped surge chamber was excavated adjacent to the flowline. The purpose of the surge chamber is to cushion the water column in the penstock. In order to control the enormous water pressure at the top of the penstocks, an unusual coupling was designed. This is a set of two spherical manifolds, 24 feet in diameter, made from riveted steel plates. This design allowed the pressures to be equally distributed. The manifolds were placed one in front of the other, connected by a short length of pipe. Six 7 foot 6 inch penstock outlets, two in the rear manifold and four in the front manifold, fed from this coupling (photo 6).

Only three of the penstock outlets were used in the initial development; the others were held in reserve for future expansion. The three original penstocks were 90 inches in diameter at the top, tapering to 54 inches at the powerhouse. The standpipes are mounted on concrete piers (SCE Drawing and are connected to the penstocks by way of riveted nozzles (SCE Drawing Cl and small diameter pipes which serve to vent the penstocks from above the standpipes (SCE Drawing photos 6 and 7). The standpipe access ladder is now attached to the fourth standpipe (SCE Drawing photo 7). The standpipes were constructed in short sections, riveted on the original three Big Creek Hydroelectric System, Powerhouse 3, Penstock Standpipes HAER No. CA-167-B (Page 3) standpipes and welded on the fourth.

The strength of the structure lies in the geometry of the lattice-work connecting the standpipes.

Historical Context

The Building of the Big Creek Hydroelectric System is considered one of the world's most important engineering and technological achievements during the first third of the Century (Hill Its construction was compared at the time with that of the Panama Canal as a major undertaking. It held many records including longest hard-rock tunnel, longest transmission lines, and highest head powerhouse (Myers Its enormous (for the time) generation capacity contributed significantly to the development of the Los Angeles metropolitan area. And it was associated with the lives of three significant historical figures: o John S. Eastwood, one of the pioneer hydroelectric and dam engineers of California, the initial Big Creek Project was his vision and design; o Henry E.

Huntington, one of California's leading capitalists during the early decades of the Century, was the key financier behind the Big Creek Project. His wealth, connections, and ambitions--both for this project and the development of the Los Angeles area--made possible the initial construction of the Project; and o George C. Ward, manager of the complex engineering and construction operations during the great Big Creek Project expansion of the became famous in engineering and construction circles because of his work on the Project. The Big Creek area was first recognized as having potential for hydroelectric development by the engineer John S.

Eastwood in the Eastwood played an important role in the creation of the System not only by laying out the project, but also by inducing a notable Los Angeles businessman, Henry E. Huntington, to finance the project. Huntington was the nephew of Collis P. Huntington, one of the so-called Big Four who founded the Central Pacific (later Southern Pacific) Railroad which built the western half of the transcontinental railroad. Henry Huntington inherited his uncle's share of the multi-million dollar railroad business which he sold in for $50 million. Huntington increased the size of his fortune many times through his development of public utilities, real estate and various Los Angeles area interurban electric railways.

A man of statewide significance, Huntington's business ventures, like his support for the Big Creek Project, led to Los Angeles becoming one of the most important cities in the United States in the early Century (Frederick Through the huge amounts of power produced by the Big Creek Project, Huntington hoped to consolidate under his control all the utilities in Southern California. He and several associates, Big Creek Hydroelectric System, Powerhouse 3, Penstock Standpipes HAER No. CA-167-B (Page 4) including the Southern Pacific Railroad, W. F. Kerckhoff, and A. C. Balch, incorporated Pacific Light and Power Corporation in (Fowler As agreed years earlier, John S. Eastwood was compensated for his contribution to the Big Creek Project with 10% of stock.

In Huntington consolidated his personal control over and eliminated most of his associates' interests, including Eastwood's, through a series of agreements and stock maneuvers. In financing for the Big Creek Project was completed by a syndicate of New York bankers who made $10 million available (Shoup Construction on Powerhouses No. 1 and No. 2 began during the years to Work also started on building the dams to create Huntington Lake, and the various tunnels and penstocks to transport water from the lake to the powerhouses.

In conjunction with this early project development, the town of Cascada (later renamed Big Creek) was established at construction headquarters (Shoup During the war years construction slowed considerably at Big Creek due to the scarcity of capital and the drop in demand for power in Los Angeles. In Huntington exchanged his stock in Pacific Light and Power for Southern California Edison stock, and he retired from daily management of the business. In following the end of World War 1, a new period of expansion began at Big Creek initiated by Southern California Edison in response to a surge in power demand in the Los Angeles area. This boom period extended through the in Los Angeles, creating a continually increasing need for electrical power which Big Creek was largely expected to fill.

During the the bulk of construction was completed that created the Big Creek System as it exists today. From to Powerhouses No. 1 and No. 2 were expanded by adding third units, and three new powerhouses were built: Powerhouse No. 8, the so-called "90-day wonder," Powerhouse No. 2A (an extension of Powerhouse No. 2 fed by water from Shaver Lake), and Powerhouse No. 3. A vast new construction effort was also undertaken to augment the water supply to the new and expanded plants. Reservoirs named Florence Lake and Shaver Lake were created and connected to the system by a series of tunnels. One of these tunnels, the Ward Tunnel (named after George C.

Ward) was drilled just over 13 miles through solid granite to transport water from the upper South Fork of the San Joaquin River into the Big Creek System. Considered the centerpiece of the great Big Creek expansion of the Ward Tunnel took five years to complete and was considered an achievement on par with construction of the Panama Canal in terms of engineering and cost. During the period following the population growth and level of activity at Big Creek decreased considerably. First, construction came to a virtual standstill during the Great Big Creek Hydroelectric System, Powerhouse 3, Penstock Standpipes HAER No. CA-167-B (Page 5) Depression as capital and new demand for electricity dwindled.

The Great Depression was followed by World War II when many employees at Big Creek were drafted for service in the armed forces. Big Creek did not enter a new period of expansion until when growth in population and economic activity in Southern California substantially increased the demand for electricity (Shoup III.

Sources

Fowler, Frederick Hall Hydroelectric Power Systems of California and Their Extensions into Oregon and Nevada. Department of the Interior, United States Geological Survey, Water Supply Paper Washington, DC: Government Printing Office. Frederick, W. B. Henry E. Huntington and the Creation of Southern California. Columbus: Ohio State University Press. Hill, Ward Historic Architecture Assessment of Worker Housing at Powerhouses 2/2A and 8, Big Creek Hydroelectric Project, Big Creek, California. Report to the Southern California Edison Company. Santa Cruz: Biosystems Analysis, Inc. Myers, William A. Iron Men and Copper Wires, A Centennial History of the Southern California Edison Company. Glendale: Trans-Anglo Books. Redinger, David H. The Story of Big Creek. Pasadena: Pentrex.

Shoup, Lawrence "The Hardest Working Water in the World:" A History and Significance Evaluation of the Big Creek Hydroelectric System. Report to the Southern California Edison Company. Fair Oaks: Theodoratus Cultural Research, Inc. IV. PROJECT INFORMATION This Historic American Engineering Record documentation of Big Creek Hydroelectric System Powerhouse 3, penstock standpipes, was undertaken because the standpipes have deteriorated Big Creek Hydroelectric System, Powerhouse 3, Penstock Standpipes HAER No. CA-167-B (Page 6) and require replacement. They will be replaced with modem mechanical ventilators with a much shorter profile.

Replacement of these standpipes with modem but functionally equivalent parts is typical of the evolution of these historic hydroelectric facilities, and an important reason why they remain a useful component of Edison's modem electric grid. \., \ \ ' \ I i& " I MONO CREEK DIVERSION . ', f / :MONO/BEAR (}/ ; TUNNELS', / I // \. - , ' "'\.o'"-r ~,, / ~mmothPoot -- ~ .. -~ Portal \. 9uin ,t\i e, ,,- \BEAR CREEK - ~ Aeseivoir Folbay -- c j DIVERSION .. :;: ....MONO/BEAR/SIPHON :/ :i - ... /:. \ \ CAMP62CREEK-"7 ._ ' Ward Tunnel ' DIVERSION : I \ / I i ! I \ \ \ I ci::

Portal Powerhouse

La~ . l . : ~ ~ ::c < j > ::3 (JQ : (} tr1 Cll 0 :; { __ _ :-;o 8 . . , MAMMOTH POOL .. , :, i ~ Zn~ POWERHOUSE _ ;.. J ., . -N- o~~ ::c POWERHOUSE N POWERHOUSE NO. 1 : I . ~ POWERHOUSE NO. 2 2A : opr~ ': till~ Si~-~....\<. __ pjiiji,;::-~ > ::s ".fi \ --- ._ _,. : ~1 : ' YJ'I;($./. en '"O o . . ci'~ I : <$ .' -.J I - Cl> '"O CD tXl Cl> (") ~~: t ! LEGEND -;a Cll a. ii ,'? nSOq : i:ll (") J : : J : Q.. . ' c POWERHOUSE / ' PENSTOCK (JQ \ o/ 'POWERHOUSE .. 'x :1 . .. ~- ~~/ .. DAM 0 Cl> -.J ~ Cll ,ciN0.4 r- SURGE CHAMBER I I ~k I TUNNEL '-' ft , I <:" .- I , _a I I \ .\ . SCALE IN MILES \ I 0 2 4 _./ TCR J Cl> w l! ~. ; 9- ~ t' Big Creek Hydroelectric System, Powerhouse 3, i Penstock Standpipes HAER No. CA-167-B (Page 8) Hl!UH N 0 c .

Big Creek H dro Penstock HAER N stl.'idp'electric C ipes System' Po werbouse 3 o. A-167-B (Page 9) 'i " ll) ~ ~~~ Q !~ ~ ., ro I I ..; ~ Li( i ..1 ' ' ., . , ... , 111 - t. :::E O a: LL. 0 w :::E LL. 0 a: 0 :::E ' , 0 1' ,. I' r - . \, I' I ' " ': -~ l ! ~ Ill\! I I ~ ~ JJjJ(Ri~ .'>S'bt~~~~i~ ~i }:i~l;~ it!,l:Ji~'i ""i"~;:~ (~ ~~~ji,;~-i~, ~ii,":..:i.~f~-:...~ s. .- .. ; I\' ' // - :\_ / -- ~/ IC1r.;b~- ~ EE - I. I < [Jr.ti :s4 - 7t; _L- i_y- ~= Cl.I (JQ II i"or lt' r1 v~t:i. l/ ::0 s- (j , I NOTE- P Pc To 8 cuT ANO Ol?'LLEO IN F"IELO. '1 2! f') ~ '\ 0 ~ tt> '' 1 I NOZ.7:.1..E V1 ~ ~l ; ~ 3 Rc:ou1REO A-7-~, 5 I - -- I ~s~ JOB NO. I Q.. Q.. : ~.J I -_; _ ~Xi. .('o rHE M. KELLOGG CO. -Q\ "O "'I 0 --l "O tt> ' 1._ ~ I tt> - ~iYORO DEFT iI "It<.I ~ // t:C Cl.I ~ JERSEY CITY, N. J. 30 10.

MOZ.ZLE ~~ S'. f) 1 ==----=-=EQ R- AN DP PE co N N E=~c~1~1o-Nc=s-_ 1 (JQ V1 tt> '-< BIG-_~!!lil\ '"" - 0 . Cl.I ;;- _---,:'iO\l:H~R-tt SCAlC c_ OAT[. o -.OY(O' -- j3 \ -- OCSCRIPTIOH. -~J Ol'llt.WH fl'l,O.CCO No. "" -- Uf;~=, - , - -- ' - ___ *' 0 / - _J) - ~ 0 a. Cl.I Mft~OF1IMED .I tt> ~w 16X iBEST AVAILABLE Big Creek Hydroelectric System, Powerhouse 3, Penstock Standpipes HAER No. CA-167-B (Page 11) D .Aw- d I I z .:J /~Z I '" ~ \1 PiPrbht I /Ml 01 z 7.# -' " !'7 ~1 .:J 'U L - r i IO' I /O" I co..:r. S ;;o,, / ... 2 Caxr. ~.kw-Ritr~. .. I I Z -' ToJ'M. Ex,. ~" -' _ _. , I (. ,1 1v1 ~. . A.~ovr:: $'1UT"'~"" LOC.&.nOtl Jl,,a .. .Prl!OJ11CT ,~ l , Nf( CA.Lll'CPINI& (OUO co lo"~-j'"! T_~I:..!!!_ ~J PAN/JPIPE --- - - - - - - - -- 6 ___ 1>- __j.A?'z.r"_ PIERS A.Y C~.O.

I' ,- - -1- 1 - - < ~ . Hd 836 _0 -~ i ..- .., ~ , -- .I - - lia ' .. , :.. .. !!'N:::lail'Jll@ - ::8 __ to - - -- -- .. ~ MICROFILMED FROM 16X ,__ j

Best Available Copy

Big Creek Hydroelectric System, Powerhouse 3 . Penstock Standpipes -- . --1 f.% .' __ JJ.AERNo . CA~167-B (Page U)-;--.1. s' - I: .; ' ' I i' : ' ;; f '~ t rt) . . ::_ n~ ! m. ~- w I. I .. ~~ i 1 n I' ' ( 1': l ! : ;{ I -. \ ' 'a I l,. :i :j __ : ! I I,. ' I ~ h IJJ I ' 1'1 ,l H l ,' / 1 ' I, / I I I I 1 ii -~ I II , l 1,, , :~ l r- 1 I/ __ ~ ~ ~ I 'H t .. !,/ ~ .. il l .. l~' ~. .Hi \ t 1 Um I I i , \UH . - l' I l/ 1:~ . ~ - ' I l I I ~ I I I /1, I II :I ' I -! ' "' 1 1 I I- '. I .. (.JI ' (() ~ W' (.JI . I 1~ I L I I - - __ i Big Creek Hydroelectric System, Powerhouse 3 . Penstock Standpipes ' HAER No. CA-167-B (Page 13) ; j ~ ~s 96tlif 111 1 I .;. ~ ~ I ! ~ -r' i ; ~. I :! t ''l ~ .v' . " ' ~ I , , . ~ .' / ' ~ '' -< 1 . /-.

"' \ J-- - 1\ r r 1 ~ I i "'l~II +~- l I : t ' "\ l ''I .f 1 I I '.1 \' \\ \}

In context

Big Creek, California The place record: every map, photograph and survey of this town.
Fresno County, California 484 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Big Creek

13 records

The federal surveyors worked through Big Creek building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Big Creek Hydroelectric SystemHAER CA-167-F21,229 words
Big Creek Hydroelectric SystemHAER CA-167-E18,209 words
Big Creek Hydroelectric SystemHAER CA-167-G16,945 words
Big Creek Hydroelectric SystemHAER CA-167-H16,107 words
Big Creek Hydroelectric SystemHAER CA-167-L12,008 words
Big Creek Hydroelectric SystemHAER CA-167-O9,799 words
Big Creek Hydroelectric SystemHAER CA-167-M8,210 words
Big Creek Hydroelectric SystemHAER CAL,10-BIGRK.V,1A-3,583 words
Big Creek Hydroelectric SystemHAER CA-167-K3,476 words
Big Creek Hydroelectric SystemHAER CA-167-I3,391 words
Big Creek Hydroelectric SystemHAER CA-167-J3,118 words
Big Creek Hydroelectric SystemHAER CAL,10-BICRK.V,1C-2,808 words
Big Creek Hydroelectric SystemHAER CAL,10-BICRK.V,1D-57 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,10-BICRK.V,1B-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.