From the record

“The San Bernardino Valley College contains the core complex of the first junior college in California, built under legislative guidelines and standards established for junior colleges.”

Written record, HABS CA-2729-C survey. Machine-read text.

Surveyed by the federal HABS program as HABS CA-2729-C · the record runs 4087 words · one of 145 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

3996 words

Source document Quoted word for word from HABS CA-2729-C. Not written, edited or summarised by this site.

The San Bernardino Valley College contains the core complex of the first junior college in California, built under legislative guidelines and standards established for junior colleges. These structures are also exemplary examples of the Spanish Colonial Revival style prominent in the early part of 20th-century California. SAN BERNARDINO VALLEY COLLEGE, LIBRARY HABS No. CA-2729-C Page2 PART I. HISTORICAL INFORMATION A. Physical History: 1. Date of erection: (Schuiling building plans) 2. Architect: Howard E. Jones (Schuiling 3. Original and subsequent owners, occupants, uses: The building was constructed as the library for San Bernardino Valley College. It has remained in use for this purpose since its construction. 4.

Builder, contractor, suppliers: The Library was completed in for It was the last of the original four buildings, including the Administration Building, Life Science Building, and Gymnasium, to be constructed on the San Bernardino Valley Union Junior College campus. The Administration and Life Science buildings, designed by Jones, were both completed in by Bakker and Robinson, San Bernardino contractors. It is likely they also built the Library. 5. Original plans and construction: Designed primarily in the Spanish Colonial Revival style, the Library retains most of its exterior detailing, including iron grillwork, art stone trim, quatrefoil iron vent grilles, and mission-tiled roof. The north and east elevations appear much as they did when the building was new.

The south elevation that contained the original principal entry vestibule was extensively altered when a large addition was constructed in A walled utility yard containing air conditioning equipment, along with a large square air duct, obscure part of the west elevation. The interior of the Library, once open to a beamed ceiling 28 feet above the floor, was divided into two stories during the or early The original as-built blueprints for the Library, drawn in Jones' office, include plan views of the foundation, reading room level, mezzanine level, and ceiling of the library; elevation views of all four sides of the exterior; cross sections; decorative details, and construction details. They do not include original dates.

The blueprints are stored in the basement of the school print shop run by the San Bernardino Valley College Maintenance Department. 6. Alterations and additions: Between and the early the Library underwent major renovations, including the attachment of a large addition to its main entry facade on the south, and division of the original single-story interior into two stories. When the addition was built, the principal entry vestibule on the south elevation was altered and SAN BERNARDINO VALLEY COLLEGE, LIBRARY HABS No. CA-2729-C Page3 incorporated into the interior, forming a transitional hall between the old Library building and the addition. Additional details on alterations can be found in the architectural descriptions below. B.

Historical Context The library opened in as one of the new buildings constructed for the expanding college campus. At the time, the library housed over volumes and 85 periodicals (Lanto According to the San Bernardino Sun (Dec 14, the building suffered severe structural damage in a earthquake. The building was extensively remodeled the same year. PART II. ARCHITECTURAL INFORMATION A. General Statement: 1. Architectural character: The original portion of the San Bernardino Valley College Library is designed primarily in the Spanish Colonial Revival style.

The Spanish Colonial Revival is reflected in the building's ornamental detailing, including iron grillwork, cast art stone trim, quatrefoil iron vent grilles, arched windows, mission-tiled roof, stucco exterior wall finish, and beamed and coffered ceiling. 2. Condition of fabric: Between and the early the Library underwent major renovations, including the attachment of a large addition to its main entry facade and division of the original single-story interior into two stories. What remains exposed of the original fabric of the building has been maintained in good condition. B. Description of Exterior: 1. Overall dimensions: The Library measures 124 feet 2 inches (north/south) by 52 feet (east/west).

The northwest and southwest comers are recessed 4 feet into the north and south elevations and 3 feet 10 inches into the west elevation. The main entry vestibule on the south elevation, altered and incorporated into the addition, originally had a bay 27 feet 4 inches wide (east/west), that projected 10 feet 3 inches south from the building. Concrete stairs extended an additional 11 feet south. An entry vestibule on the east elevation is 24 feet wide (north/south), and projects 7 feet 9 inches east. The Library is 43 feet high from grade to roof ridge, and originally consisted of a large, single story reading room inside, open to the ceiling 28 feet above the floor, with a mezzanine on either end. SAN BERNARDINO VALLEY COLLEGE, LIBRARY HABS No. CA-2729-C Page 4 2.

Foundations: The rectangular substructure supporting the four exterior walls of the Library consists of reinforced concrete foundation walls under the north, south, and east elevations. These foundation walls rest on reinforced concrete footings under the north, south, and east elevations. The footings are buried below grade, and the exposed portions of the exterior foundation walls are finished with stucco to match the upper walls. Original interior walls delineating the two large rooms and closet on the west end of the first story, and the three large rooms, janitor's room, two restrooms, entry, and hall on the east end, are supported by reinforced concrete foundation walls.

The spaces between the foundation walls under the restrooms, janitor's room, east entry, halls, and closet are filled with thick reinforced concrete slabs. The Library originally had an entry vestibule on its south elevation that was extensively altered when the new wing was constructed in Under the vestibule, the foundation walls rested on footings. The space between the vestibule's foundation walls was filled in with a thick reinforced concrete slab. In between the concrete foundation walls and footings, partially buried below grade, that support the exterior and interior walls of the building, 46 piers are arranged in four east-west rows. Each footing supports a thick steel plate lying beneath a square vertical wooden post.

On top of the posts, each of the four lines of piers carries a built-up wooden girder made of three sandwiched boards standing on edge. The four girders support floor joists, oriented north-south. The foundation supports the first-story floor above a crawl space. 3. Walls: The exterior walls of the Library are constructed of reinforced concrete that is covered with stucco and painted beige. At the transom level of the second-story arched windows, there is a 3 foot high band of cast art stone, decorated with a stylized scrolled leaf pattern surrounding repeated escutcheons. The art stone finish has been painted beige. The band is recessed into the concrete so that its surface is nearly flush with the wall surface.

It continues around the entire building, breaking for windows and the south and east entry bays. Along the gable rakes, the east and west walls are decorated with cement-plaster arcaded cornices. 4. Structural system, framing: The Library is constructed predominantly of concrete reinforced by 5/8 inch and 3/4 inch steel bars. The first-story wood floor is supported by a system of concrete, steel, and wood piers, built-up wood girders, and wood joists. The roof is framed with trusses consisting of riveted and bolted steel beams, struts, rafters, and purlins. SAN BERNARDINO VALLEY COLLEGE, LIBRARY HABS No. CA-2729-C Page5 5. Vestibules: The Library was originally entered through two vestibules. The primary entry was in the center of the south elevation.

Concrete stairs extended from the entry. When the addition was built, the primary entry vestibule was altered and incorporated into the interior, forming a transitional hall between the original Library building and the addition. The primary entry vestibule retains its ornamental wrought and cast iron gateway and twisted rope art stone trim. The art stone is now painted beige. The double iron gates have been removed from the gateway, and the acoustical drop ceiling, installed when the second floor was added, interrupts the vestibule's former outer entry below the arch. On the second floor, the former upper portion of the vestibule is now a small alcove that functions as a sitting area and landing for the elevator, that was added during renovations.

The outer vestibule arch in the sitting area has been filled in with a fixed-pane window. Originally, the interior of the primary entry vestibule had walls covered with smooth art stone, a staff (plaster of Paris reinforced with hemp fiber) frieze matching the decorative staff panels on the Library's interior walls, ceiling beams, staff panels between the ceiling beams, a marble threshold, a terra cotta tiled floor, paneled wooden inner doors, and decorative tiles on the stair returns. All ornamentation and detail have been removed from the vestibule interior, and it is now stuccoed and painted beige. The doors to the added elevator are on the east vestibule wall, and a door to an added room is on the west wall.

The floor is carpeted, and the former location of the stairs and stair returns is now a continuous flat floor into the addition. The original wooden inner doors have been replaced by aluminum framed glass doors. The secondary entry is in the center of the east elevation. As-built drawings of the Library show a shallow canopy over the secondary entry arch, supported on either side by short projections of the vestibule walls. The lower halves of the supporting wall projections are shown as engaged Tuscan colonettes. The canopy in the drawings has an open-beamed gable, and a mission-tiled roof.

Historical photographs show that the canopy and supporting wall projections were not built, and that the east entry vestibule was originally as it is today, with the exception that the decorative tiles that once covered both the outer arch surround and the stringers on either side of the concrete steps have been removed. Scarring where they were pried off is visible under the beige paint around the arch. The interior of the secondary entry vestibule retains many, if not all, of its original details. The floor is covered with square terra cotta tiles, interspersed with decorative square tiles, each bearing an impressed fleur- de-lis, lion rampant, or narrow cross Formee surrounded by four smaller Greek crosses.

Designs in these tiles are glazed in blue, yellow, green, SAN BERNARDINO VALLEY COLLEGE, LIBRARY HABS No. CA-2729-C Page6 black, or gray. The interior vestibule walls are finished with stucco painted beige, and have a base of square terra cotta tiles. The north and south side walls of the vestibule each have a wood sash window covered by an exterior concrete grille with 12 ovoid quatrefoil openings. The stringers along the sides of the top concrete step are covered with blue- glazed square tiles. The original double wooden 18-panel doors are still in place, with a single fixed-pane fanlight above the transom. The transom bears hand-painted, gold letters with black outlining that spell: "ENTRANCE SOUTH SIDE." The sign is quite faded, and may be original.

A lantern, made of wrought iron with a textured, cylindrical, milk-glass shade, hangs by a chain from the center of the ceiling. This light fixture is not shown on the as-built drawings, but it appears to be original. 6. Chimney: n/a 7. Openings: a. Doorways and doors: Originally there were double 18-panel wooden doors leading to the interior of the Library inside both the primary entry vestibule on the south elevation and the secondary entry vestibule on the east elevation. Original doors remain in the east entry vestibule.

In the south entry vestibule, the original doors were replaced with aluminum-framed glass double doors when it was turned in to a transitional hall between the original Library and the addition in Doors on each entry had a wooden architrave, and a single fixed pane fanlight above the transom. b. Windows and vents: The Library has 22 main windows, each consisting of an arch divided at the mezzanine level by a cast art stone panel. Each panel is decorated with a scrolled leaf pattern similar to the art stone band above, surrounding an escutcheon.

Below the mezzanine level, in the present first story, the 8 windows in the south elevation and 11 windows in the north elevation each consist of a six-over-six double hopper sash in the center, with four fixed panes on either side in a vertical line. A wrought iron grille with a repeating quatrefoil pattern covers a blank panel below the glass, and the sill is cast art stone. Above the mezzanine level, in the present second story, each window has a six-over-six-over-six triple hopper sash in the center, six fixed panes in a vertical line on each side, and, filling the arch above the transom, nine fixed panes in the center with two fixed panes on either side. Each window is surrounded by a cast art stone architrave, and divided vertically by two twisted rope art stone mullions.

The sashes and muntins are made of quarter-sawn oak. All parts of the windows, with the exception of the black wrought SAN BERNARDINO VALLEY COLLEGE, LIBRARY HABS No. CA-2729-C Page7 iron grilles at the bottoms, are now painted beige. The three windows on the east elevation are the same as those on the north and south, except that a third six-pane hopper sash is behind the wrought iron grill at the bottom of each instead of a blank panel. The lower portion of the window at the west end of the north elevation has been converted into a wheelchair entry with double metal-covered doors. Access to this entry is by a concrete ramp that extends to the west. The lower portion of the northernmost window in the west elevation is now partially obscured by a large air conditioning duct.

The bottom portions of the two innermost windows right (east) of the former south entry vestibule are now covered by the addition. The east elevation has three smaller arched windows above the mezzanine level, and two below the mezzanine. Above the mezzanine, one window is in the center of the entry vestibule, and the other two are on either side. The two lower windows are on either side of the vestibule. Each of the four windows on either side of the vestibule consists of a six-over-six double hopper sash, with three fixed panes filling the arch above the transom, divided by vertical mullions. The window in the center of the vestibule, above the entry arch, consists of side-by-side four-over-four awning sashes, with four fixed panes above the transom.

All five of the windows have cast art stone architraves and sills, and quarter-sawn oak mullions and muntins. All are now painted beige. The north and south side walls of the vestibule each have a wood sash window covered by an exterior concrete grille with 12 ovoid quatrefoil openings. The crawl space beneath the Library was originally ventilated by 23 small openings covered by cast iron quatrefoil grilles. Two of the vent openings on the south elevation were eliminated when the addition was built in The iron grilles of the remaining vent openings are still in place, but have been covered with wire mesh and are barely visible. A hinged crawl space entry is located in the center of the north elevation foundation wall.

The entry is covered with a grille perforated by four quatrefoil openings. The east and west elevations of the Library each have a round attic vent centered in the gable end. The vents originally had four horizontal metal louvers, not five as shown on the as-built drawings. The louvers in the east elevation attic vent are still in place, while those in the west elevation vent have been replaced by wire mesh. SAN BERNARDINO VALLEY COLLEGE, LIBRARY HABS No. CA-2729-C Page8 8. Roof: a. Shape, covering: The Library has a low-pitched, gabled roof with its ridge oriented east/west, along the long axis of the building. The roof is sheathed in wood planks supported by steel trusses, and covered with mission-patterned curved terra cotta tiles.

The concave tiles on the bottom are single, while the convex tiles bridging them are doubled. b. Cornices, eaves: The rakes of the east and west elevation gable ends have arcaded cornices made of cement plaster. 'The eaves are supported by exposed wooden rafters with decoratively shaped tails. c. Drainage: Rain water is collected along the edges of the eaves by copper gutters. It then pours into copper downspouts located at the east and west ends of the building. The downspouts enter the concrete walls near the top, and reemerge from the walls near the bottom, where the water is emptied onto the ground. C. Description of Interior: 1.

Floor plans: Originally, the interior of the Library consisted primarily of a large reading room in the center, overlooked by mezzanines on the east and west ends. Below the mezzanines were a seminar room, a conference room, and a closet on the west end, and a seminar room, a work room, an office, a janitor's room, two restrooms, an entry, and a hallway on the east end. Between and the early the reading room was converted to office space and divided by adding interior walls. Two offices were constructed along the center of the north wall, and a hallway and two rooms were built along the south wall. A large built-in counter was placed near the center of what remained of the former reading room.

Available information indicates that the original rooms on the east and west ends under the former mezzanines still exist. 2. Stairways: The Library originally consisted primarily of a large, single story reading room inside with a mezzanine on either end. When the building was renovated during the and early the two mezzanines were replaced by a floor, converting the Library into a two- story building. Originally, single concrete stairways inside narrow stairwells, near the center of each end of the reading room, led straight up to the mezzanines. These were eliminated when the second story was built, and were replaced by a concrete dogleg stairway with one landing, located just inside the former main entry vestibule on the right (east) side. SAN BERNARDINO VALLEY COLLEGE, LIBRARY HABS No.

CA-2729-C Page 9 3. Flooring: The original reading room, seminar rooms, conference room, work room, office, and mezzanines had wood floors supported by wood joists. The restrooms, janitor's room, and hall had concrete slab floors. The reading room, mezzanine, workroom, and janitor's room floors were originally covered with rubber tile. The floors in the office, conference room, seminar rooms, hall, and closet had linoleum tiles. The restroom floors had glazed ceramic tiles. All floors, except those in the restrooms, are now covered by carpeting. 4. Wall and ceiling fmish: The original interior walls dividing the rooms are made of reinforced concrete finished with sand-textured beige paint.

The Library ceiling is spanned by 8 ceiling beams oriented east/west, intersected by 12 beams oriented north/south, forming coffers. The beams are made of wood covered with staff panels, but are now hidden by an acoustical drop ceiling. 5. Openings: a. Doorways and doors: As-built drawings and historical photographs show two arched doors on either end of the reading room, leading to the rooms located under the mezzanines. These doors were made of wood and had 15 panels each. The doors currently mounted in the same doorways are made of vertical planks covered with smooth wood veneer. On the as-built drawings, decorative tiles are shown surrounding the doorways. Historical photographs indicate that the tiles were not included when the building was constructed. b.

Windows: From the interior of the Library, the windows are as described on the exterior, except that the quarter-sawn oak retains its original brown stain and clear finish, rather than being painted over. 6. Decorative features and trim: Decorative staff panels fill the interior wall spaces between the beam ends in what was originally the reading room. These panels have a leaf and escutcheon design similar to that of the art stone band around the exterior of the building. The ceiling beams have ornamental staff soffits, and each beam end is supported by an ornamental staff console.

The beams, decorative panels, and consoles are currently obscured by the acoustical drop ceiling that was installed below the original ceiling during renovation in the or early The exposed edges of the two mezzanine floors were decorated with decorative staff panels with a leaf and escutcheon design. Ornamental SAN BERNARDINO VALLEY COLLEGE, LIBRARY HABS No. CA-2729-C Page 10 wrought iron railings were installed along the edges of the mezzanines. When the second-story floor was constructed, the mezzanines were eliminated. Decorative lighting sconces, made of staff, were once located at the transom level in between each of the large arched windows of the reading room. These fixtures no longer exist. 7. Hardware: The window hardware inside the Library appears to be original.

Although the interior doors have been replaced, original hardware appears to have been reused. The door hinges have a particularly interesting design. Rather than being flush, they slightly extend from the door and wall surface into the former reading room area. The hinge pins are capped with conical finials. A unique feature, consisting of a thin metal strut attached to the wall below the hinge, forms a triangular brace supporting it from below. The original wooden stairwell railings were supported by cast bronze brackets. The stair nosings were made of brass. The stairs and stairwells, along with their hardware, have been eliminated. 8: Mechanical equipment: a.

Heating, air conditioning, ventilation: As-built drawings show heating ducts built into the walls, with vents located below the window sills, suggesting a central forced-air heating system. Historical photographs show steam radiators next to the reading room wall. A combination of both types of heating may have been used. Today, the Library is air conditioned by a central heating and cooling system, with equipment located inside a fenced yard on the west side of the building. b. Lighting: The reading room originally had decorative staff wall sconces with incandescent bulbs at transom level between each of the windows. Incandescent lamps with round milk-glass shades hung from the ceiling by chains. None of this lighting remains.

When renovations were conducted between and the early acoustical drop ceilings with built-in fluorescent lighting were installed throughout the building. c. Plumbing: As-built drawings of the Library indicate a water closet and sink in the women's restroom; a water closet, urinal, and sink in the men's restroom; one sink each in the janitor's room, office, and workroom; and a drinking fountain in the east entry hallway. When the second story was created, two upstairs restrooms were added. SAN BERNARDINO VALLEY COLLEGE, LIBRARY HABS No. CA-2729-C Page 11 d. Elevator: When the Library was converted to a two-story building, an elevator was installed on the east side of the original south entry vestibule. 9. Original furnishings: Historical photographs show wooden chairs and tables being used.

Available information indicates that few, if any, of the original pieces of furniture remain in the library. D. Site: 1. Historic landscape design: Historical maps and photographs show that the landscaping of the grounds surrounding the Library has been changed drastically from its original design on the south and west sides, but remains much the same on the north and east sides. The greatest changes consist of a large addition built in the lawn area adjacent to the south elevation in and a walled air conditioning equipment yard built along the west elevation. As it always has, the east elevation overlooks a narrow planter containing foundation shrubs, and a tree-shaded concrete courtyard between the Library and the Life Science Building.

The north elevation originally faced a narrow planter filled with large shrubs, bordered by a concrete sidewalk, then a paved parking area. The planter is now a strip of grass. The sidewalk still exists, but the eastern portion of the parking area has been replaced with a raised concrete planter containing shrubs, with a grass lawn lying beyond. PART III. SOURCES OF INFORMATION See HABS No. CA-2729. PART IV. PROJECT INFORMATION See HABS No. CA-2729.

In context

San Bernardino, California The place record: every map, photograph and survey of this town.
San Bernardino County, California 963 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in San Bernardino

5 records

The federal surveyors worked through San Bernardino building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
San Bernardino Valley CollegeHABS CA-2729-A4,558 words
San Bernardino Valley CollegeHABS CA-2729-B3,018 words
San Bernardino Valley CollegeHABS CA-27292,158 words
San Bernardino Valley CollegeHABS CA-2729-D1,881 words
San Bernardino City HallHABS CAL,36-SANBER,1-1,200 words

Provenance

  • Written history. Quoted verbatim from HABS CA-2729-C. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.