BlockBefore

Hunters Point Naval Shipyard, Commercial Drydock Area, Drydock No. 2, East of Intersection of Robinson Avenue & Fischer Drive, San Francisco

Hunters Point Naval Shipyard, Commercial Drydock Area, Drydock No. 2, East of Intersection of Robinson Avenue & Fischer Drive, San Francisco, San Francisco County, CA. Surveyed as HAER CA-2273-E, with a 2,546-word written history.

From the record

“Drydock 2 is located within the Hunters Point Naval Shipyard, Commercial Drydock Area.”

Written record, HAER CA-2273-E survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2273-E · the record runs 2546 words · one of 382 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1679 words

Source document Quoted word for word from HAER CA-2273-E. Not written, edited or summarised by this site.

Drydock 2 is located within the Hunters Point Naval Shipyard, Commercial Drydock Area. The Hunters Point Naval Shipyard, Commercial Drydock Area is significant at the state level for its important association with the development of commercial shipping and ship-repair in the San Francisco Bay area. The historic area is also a significant example of marine engineering, the work of master engineer, Howard C. Holmes, and a significant example of Neoclassical Revival architecture used for industrial buildings. Drydock 2, engineered by Holmes, and utilized as a commercial ship repair drydock from - contributes to the significance of the historic area. Description: Drydock 2, just south of Building is a long, 89' wide, and 28' 10" deep graving dock.

This drydock, constructed in is currently open to the bay, therefore only approximately 6' of the drydock chamber was visible between the water line and drydock coping. The basin is sheathed in concrete, smooth around the bow and at the entrance (stern) end. The top five of twelve altars (steps in the wall of a drydock) beneath the coping are currently visible. A series of fourteen service galleries line each side of the drydock just beneath the curb. Each gallery has a metal railing around the perimeter. Two sets of metal flush-mounted staircases on each wall descend into the water. A chain handrail consisting of posts with an eye at the top, and at mid- level support two chains, stretch around the drydock, with breaks at access points (Photograph 1).

Original capstans, some electric, some hand-operated, were replaced by the Navy, and remnants of the replacements remain around the perimeter (Photograph 6). Original crane tracks have mostly been removed from the perimeter as well. The floating caisson, a replacement built by Pacific Coast Engineering Company of Alameda in remains afloat at the bow end of the drydock (Photograph 6). Eight valves flood the drydock through the caisson, and two valves flood the caisson to sink it in place. The caisson deck is enclosed by the same type of chain handrail around the perimeter of the drydock. Cleats and capstans are also present on deck level of the caisson. HUNTERS POINT NAVAL SHIPYARD, COMMERCIAL DRYDOCK AREA, DRYDOCK 2 HAERNO.

CA-2273-E (Page 2) History: For a detailed history of Hunters Point Naval Shipyard, Commercial Drydock Area, please refer to HAER No. CA-2273. The San Francisco Dry Dock Company, successor of California Dry Dock Company, owned and operated the original Drydock 1 at Hunters Point at the turn of the twentieth century. Since construction of that original drydock at Hunters Point in ships had increased in size. In order to accommodate the larger commercial ships, San Francisco Dry Dock Company decided to construct a new, larger drydock at its site. The company offered well-established engineer Howard C. Holmes a position as chief engineer to design the new drydock, which he accepted, resigning his post as chief engineer of the California State Board of Harbor Commissioners.

Once Holmes had prepared plans and specifications for the new drydock, San Francisco Dry Dock Company opened construction bids late in October and awarded the contract to the City Street Improvement Company. Work began on January 9, and on February 1, the first vessel drydocked. The new drydock, Drydock 2, was significantly larger than the old drydock at long compared to While not the largest drydock in the world, its dimensions and engineering put it in the same class with the largest, most modern drydocks. The new drydock was not intended to replace Drydock 1, but to expand the Hunters Point facility. The Holmes plan called for the new drydock to be situated south of existing Drydock 1, with the axes of the two drydocks at about a 14 degree angle.

The composition of the peninsula, green serpentine, provided an ideal location for excavating another drydock. Construction crews used excavated material to fill the embankment adjacent to the south side of the new drydock. Holmes specified that the rock be excavated close to the actual contours of the drydock chamber so that only a thin layer of concrete would be required to finish the drydock. Concrete lined all parts of the drydock chamber except the sides of the approach, seat for the caisson, and the apron arch, all cut of granite masonry. Sixteen altars, eleven at the top, five on the bottom, lined the sides of the basin from from the gate to from the head of the chamber. Construction crews poured concrete flush with timbers bolted to the stone basin to form the drydock floor.

Cedar bilge blocks had eye bolts to accommodate ropes connected to pulley blocks on the side walls. Belaying and locating pins were set into the concrete on the curb and the first step. Crews installed three hand operated capstans on the north side of the drydock, and four steam powered capstans on the south side. A chain handrail, with cast iron posts each with two eyes to accommodate chains, was installed along the curb. 1 "Four Wharves to Cost Nearly Half a Million," San Francisco Call, October 11, 12; "Ready to Begin the Construction of a Drydock of Gigantic Size," San Francisco Call, November 18, 23; "Chief Engineer Holmes Resigns His Position," San Francisco Chronicle, February 21, 12. 2 Howard C.

Holmes, Plan Showing Location of Old and New Dry Docks at Hunters Point San Francisco Col, Property of San Francisco Dry Dock Co, Water Resources Center Archives, Berkeley, Charles Derleth Papers, Box 18, Folder 96. 3 The caisson seat is the place at the entrance of the drydock where the caisson is secured in place. 4 Howard C. Holmes, Plan Showing Location of Old and New Dry Docks, "Four Wharves to Cost Nearly Half a Million," San Francisco Call October 11, 12; "Ready to Begin the Construction of a Drydock of Gigantic HUNTERS POINT NAVAL SHIPYARD, COMMERCIAL DRYDOCK AREA, DRYDOCK 2 HAERNO. CA-2273-E (Page 3) Drydock 2 required construction of a new floating steel caisson, or gate. Holmes also designed the new caisson, built by Union Iron Works.

Rather than requiring a separate tunnel for flooding the drydock around the caisson, this caisson's design included thirteen, 30" valves that allowed water to flood the drydock through the caisson. Union Iron Works ceremoniously launched the gate on August 23, with Holmes and other engineers present. Union Iron Works had previously produced a smaller version of this caisson for the Navy shipyard at Mare Island. At the time of the launching, two other replicas of the Hunters Point caisson were under construction, commissioned by the Russian government. This caisson remained in operation until the Navy replaced it in At the end of January just a few days after completion of Drydock 2, the first vessel drydocked.

The battleship Ohio was successfully docked in the presence of an audience of engineers, Babcock, president of the drydock company, the other directors, and about 100 "friends" interested in the operation. As the water level receded in the drydock, workers scraped and cleaned marine undergrowth off the bottom of the vessel; the drydock was completely drained in two hours. The San Francisco Call reported after the successful docking, that the drydock was a "monument to mechanical skill of which any engineer might well be proud." Reporters also noted that although the Ohio was a large vessel at in length, it looked small in the long drydock, one of the largest in the world at the time. In the late the Navy took interest in acquiring Hunters Point in response to war in Europe and the Pacific.

A congressional act in allowed Bethlehem Shipbuilding to sell Hunters Point to the Navy and in December after the attack on Pearl Harbor, the Navy moved onto the site. Although operating successfully since and the drydocks and pumping houses needed modernizing and rehabilitation to accommodate the Navy's wartime needs. This work began in earnest in early with construction of new buildings, and particular attention to repair of the drydocks themselves. Between and the Navy added a series of concrete service galleries just below the rim of Drydock 2, followed by a series of new cleats.

They installed two new capstans around the drydock, and the capstan from the bow end of Drydock 3 was relocated to Drydock 2 in The Navy scheduled a replacement deck for the caisson of Drydock 2 during August and then replaced the caisson entirely in One of the more significant alterations came in when they replaced the entire original wood plank drydock floor with reinforced concrete.

They Size," San Francisco Call, November 18, 23; "The New Dry-Dock of the San Francisco Dry-Dock Co., at Hunter's Point, Cal." Engineering News (October 5 "Will Launch Caisson," San Francisco Call, August 23, 10; "Mammoth Gate Floats on Bay," San Francisco Call, August 24, 26; "Launch of Water Gate for Dry Dock," San Francisco Chronicle, August 24, 12; "The New Dry-Dock at Hunter's Point, Cal.," Engineering News (October Drydock No. 2, General, Department of the Navy, Bureau of Yards & Docks, San Francisco, Drawing No. April 7, 6 "Big Battleship Ohio Seems Lost in New Hunters Point Drydock," San Francisco Call, January 30, 12; "New Dry Dock Opens with Big Battleship as Guest," San Francisco Chronicle, January 30, 9.

7 "History of Bethlehem's San Francisco Yard, Pacific Marine Review (October 88. HUNTERS POINT NAVAL SHIPYARD, COMMERCIAL DRYDOCK AREA, DRYDOCK 2 HAERNO. CA-2273-E (Page 4) installed steel mesh staircases in Drydock 2 and added service lines supplying salt water, compressed air, and chemicals to the full length of the drydock on both sides, near the bottom. After World War II the Hunters Point facility continued to serve as a docking area for Navy ships for repair, overhaul, maintenance and conversion. In the Navy deactivated the shipyard and leased the facility to private industry; however, the Navy continued to station several of its ships at Hunters Point. In the Base Realignment and Closure (BRAC) Commission identified Hunters Point for closure.

Over the next decade, the Navy and City and County of San Francisco negotiated terms for the lease and subsequent transfer of the facility.

Sources

783 words

Source document Quoted word for word from HAER CA-2273-E. Not written, edited or summarised by this site.

Bamburg, Bonnie L. "Historical Overview of Hunters Point Annex Treasure Island Naval Base and Descriptions of Properties that Appear Eligible for Listing in the National Register of Historic Places." Submitted to Western Division, Naval Facilities, Engineering Division, Black, Steven R. "Mare Island Naval Shipyard." Historic American Engineering Record for Hunters Point Naval Shipyard, Drydock No. 4, HAERNo. CA-181-A, (April Holmes, Howard C. "Plan Showing Location of Old and New Dry Docks at Hunters Point San Francisco Cal,Property of San Francisco Dry Dock Co, Water Resources Center Archives, Berkeley, Charles Derleth Papers, Box 18, Folder 96. Engineering News "The New Dry-Dock of the San Francisco Dry-Dock Co., at Hunter's Point, Cal." (October JRP Historical Consulting Services.

"Historic Context and Inventory and Evaluation of Buildings and Structures, Hunters Point Shipyard, San Francisco." September Pacific Marine Review "San Francisco Naval Shipyard in Permanent Status," (June "History of Bethlehem's San Francisco Yard, (October 88. 8 Photograph, May 13, NARA (San Francisco), RG Records of Naval District and Shore Establishments, Naval District, SF Naval Shipyard - Hunters Point, Historical Shipyard Photographic Collection, S Box 1, Folder Hunters Point Aerial Views Folder, 2 of 7; Photograph, November 12, Box 2, Hunters Point Aerial Views Folder, 4 of 7, RG NARA (San Francisco); Location & Details of Cleats at #2 (M.I.5) & #3 (M.I.6), April 9, Naval Drydocks Hunters Point, Calif, Drawing No.

Location Plan for New Capstans at Drydocks 2 & 3, Naval Dry Docks, Hunters Point, Calif., BRAC PMOW Caretaker Site Office, Treasure Island, Drawing No. Drydock No. 2, General, Department of the Navy, Bureau of Yards & Docks, San Francisco, Drawing No. April 7, 9 JRP Historical Consulting Services, Historic Context and Inventory and Evaluation of Buildings and Structures, Hunters Point Shipyard, San Francisco, September "San Francisco Naval Shipyard in Permanent Status," Pacific Marine Review (June Bonnie L. Bamburg, Historical Overview of Hunters Point Annex Treasure Island Naval Base and Descriptions of Properties that Appear Eligible for Listing in the National Register of Historic Places, Submitted to Western Division, Naval Facilities, Engineering Division, Steven R.

Black, Mare Island Naval Shipyard, Historic American Engineering Record for Hunters Point Naval Shipyard, DrydockNo. 4, HAERNo. CA-181-A, (April HUNTERS POINT NAVAL SHIPYARD, COMMERCIAL DRYDOCK AREA, DRYDOCK 2 HAERNO. CA-2273-E (Page 5) Photograph, May 13, National Archives and Records Administration (San Francisco), RG Records of Naval District and Shore Establishments, 12l Naval District, SF Naval Shipyard - Hunters Point, Historical Shipyard Photographic Collection, Box 1, Folder Hunters Point Aerial Views Folder, 2 of 7.

Photograph, November 12, National Archives and Records Administration (San Francisco), Records of Naval District and Shore Establishments, 12 Naval District, SF Naval Shipyard - Hunters Point, Historical Shipyard Photographic Collection, Box 1, Folder Hunters Point Aerial Views Folder, 2 of 7. San Francisco Call San Francisco Chronicle U.S. Department of the Navy, Bureau of Yards & Docks. "Drydock No. 2, General." Drawing No. San Francisco, April 7, BRAC PMO West Caretaker Site Office, Yerba Buena Island. . "Drydock No. 2, Cross Sections." Drawing No. Mare Island, April BRAC PMO West Caretaker Site Office, Yerba Buena Island. . "Drydock No. 2, Longitudinal Section." Drawing No. Mare Island, April 7, BRAC PMO West Caretaker Site Office, Yerba Buena Island. .

"Location & Details of Cleats at #2 (M.I.5) & #3 (M.I.6), Naval Drydocks, Hunters Point, Calif." Drawing No. Mare Island, April 9, BRAC PMO West Caretaker Site Office, Yerba Buena Island. . "Location Plan for New Capstans at Drydocks 2 & 3, Hunters Point, Calif." Drawing No. Mare Island, BRAC PMO West Caretaker Site Office, Yerba Buena Island. HUNTERS POINT NAVAL SHIPYARD, COMMERCIAL DRYDOCK AREA, DRYDOCK 2 HAERNO.

CA-2273-E (Page 6) Historians: Heather Norby and Toni Webb JRP Historical Consulting, LLC Drew Avenue, Suite 110 Davis, CA December Project This project was undertaken to fulfill the requirements of the Memorandum of Information: Agreement Among The United States Navy, The Advisory Council for Historic Preservation and The California State Historic Preservation Officer Regarding the Interim Leasing and Disposal of Historic Properties on the Former Hunters Point Naval Shipyard, San Francisco, California. Heather Norby and Toni Webb of JRP Historical Consulting, LLC prepared this document for the Navy. Both Ms. Norby and Ms. Webb conducted fieldwork, contributed to architectural descriptions and the historic context.

JRP conducted research at the California State Library, Hunters Point Naval Shipyard (Building National Archives and Records Administration (San Bruno), San Francisco Public Library, San Francisco Maritime National Historical Park Library, and the BRAC PMO West Caretaker Site Office on Treasure Island. William B. Dewey produced the photography. HUNTERS POINT NAVAL SHIPYARD, COMMERCIAL DRYDOCK AREA, DRYDOCK 2 HAERNO. CA-2273-E (Page 7) SITE MAP: SAN FRANCISCO BAY i1*^ : ^</ ^ . c^^f^AV- 272 U HISTORIC DISTRICT ^CONTRIBUTORS SCALE

In context

San Francisco, California The place record: every map, photograph and survey of this town.
San Francisco County, California 67 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in San Francisco

24 of 381 records shown

The federal surveyors worked through San Francisco building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
San Francisco Oakland Bay BridgeHAER CAL,38-SANFRA,141-127,296 words
Presidio of San FranciscoHAER CA-227086,796 words
Ship BalcluthaHAER CAL,38-SANFRA,200-80,588 words
Market StreetHALS CA-16434,536 words
San Francisco Cable RailwayHAER CAL,38-SANFRA,137-30,695 words
Aquatic ParkHALS CA-11328,000 words
George Washington High SchoolHABS CA-293919,932 words
Sloop Yacht KathleenHAER CA-229919,410 words
Fort FunstonHAER CAL,38-SANFRA, 214A-16,940 words
Schooner C.A. THAYERHAER CAL,38-SANFRA,199-16,891 words
North Beach PlaceHABS CA-272716,167 words
Presidio of San FranciscoHABS CAL,38-SANFRA,211-14,693 words
Pier 16 & Bulkhead BuildingHAER CAL,38-SANFRA,142-14,202 words
Jewish Community Center of San FranciscoHABS CAL,38-SANFRA,204-14,088 words
Knights of Pythias BuildingHABS CAL,38-SANFRA,172-13,633 words
City of Paris Dry Goods CompanyHABS CAL,38-SANFRA,135-11,407 words
Ferry EUREKAHAER CAL,38-SANFRA,194-11,248 words
Hunters Point Naval ShipyardHAER CAL,38-SANFRA,195A-10,629 words
Hunters Point Naval ShipyardHAER CA-227310,046 words
Steam Tug HERCULESHAER CAL,38-SANFRA,201-9,787 words
Presidio of San FranciscoHABS CAL,38-SANFRA,177-9,564 words
California State BuildingHABS CAL,38-SANFRA,202-9,200 words
Fort MasonHABS CAL,38-SANFRA,9A-9,188 words
Presidio Water Treatment PlantHAER CAL,38-SANFRA,197-8,476 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2273-E. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.