BlockBefore

Rush Creek Hydroelectric System, Rush Meadow Dam, June Lake

Rush Creek Hydroelectric System, Rush Meadow Dam, June Lake, Mono County, CA. Surveyed as HAER CA-166-H, with a 2,515-word written history.

From the record

“The Rush Meadow Dam, constructed in and is a contributing element of the Rush Creek Hydroelectric System historic district.”

Written record, HAER CA-166-H survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-166-H · the record runs 2515 words · one of 25 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

163 words

Source document Quoted word for word from HAER CA-166-H. Not written, edited or summarised by this site.

The Rush Meadow Dam is located approximately 6.0 air miles southeast of the approximate center of the town of June Lake in Mono County, California, and approximately 3.4 air miles southeast of the Rush Creek Powerhouse, which is situated on the west side of California State Route 158 (the June Lake Loop). The dam is located in the Ansel Adams Wilderness in the Inyo National Forest. From the Rush Creek Powerhouse, the dam site is accessible by incline railroads, the Agnew Tram and the Gem Tram, and by boat across Agnew Lake and Gem Lake, controlled by Southern California Edison Company. Public access to the dam site from the highway is provided by a foot/equestrian trail. There is no automobile access to the site.

The approximate center of the crest of the Rush Meadow Dam is located at UTM Zone easting northing Distances and coordinates were obtained on November 6, by plotting location using Google Earth. The coordinate datum is World Geodetic System

Significance

1576 words

Source document Quoted word for word from HAER CA-166-H. Not written, edited or summarised by this site.

The Rush Meadow Dam, constructed in and is a contributing element of the Rush Creek Hydroelectric System historic district. It is significant for its position in the development of hydroelectric generation on the eastern slope of the Sierra Nevada. The district is significant under National Register of Historic Places Criterion A (broad patterns of history) and Criterion C (distinctive characteristics of period and type of engineering and construction that represent the work of a master). The Period of Significance for the district is Description: The Rush Meadow Dam is a concrete radial-arch structure. The crest is long and located at in elevation. The radius of the outside of the arch is 165 . The dam is 50 high at its tallest point over the incised streambed, and thick at its base.

The upstream side of the dam is vertical, while the downstream side is stepped. The first eight steps are each 5 high and 2.2 deep, while the top step, which comprises the crest, is 10 tall and 2.5 thick. The north end of the dam abuts the rocky canyon wall; the south end is buttressed.2 1 James C. Williams and Roger A. Hicks, Evaluation of the Historic Resources of the Lee Vining (FERC Project Number and Rush Creek (FERC Project Number Hydroelectric System, Mono County, California (Fair Oaks, California: Theodoratus Cultural Research, Inc., A-76. 2 Southern California Edison Company, Rush Creek Meadows Dam Southern California Edison Company database (SCE Drawing No. Rush Creek Hydroelectric System, Rush Meadow Dam HAER No.

CA-166-H (Page 2) The south end of the dam tangentially adjoins a wing wall with a vertical upstream side and a slope on the downstream side. The wing wall contains the spillway, which is a wide notch 55 wide and 3 lower than the crest, at an elevation of .3 Metal pipe handrails are installed along a runway atop the crest of the dam. A geomembrane layer covers the upstream face of the dam. The concrete inlet chamber is located off-center at the base of the upstream side of the dam. The upstream face of the inlet chamber is tilted at a 1:1 slope and contains a pair of 6 wide metal screens. Behind the screens, two slide gates installed in the dam face control the flow of water into steel outlet pipes located at in elevation. The north outlet is a inside-diameter (i.d.) square steel pipe.

The south outlet is a i.d. square steel pipe, which transitions to a i.d. pipe, which telescopes to a round steel pipe. On the downstream side, both outlet pipes discharge into the streambed from their points of termination at the lowest step of the dam.4 The Rush Meadow Dam spans the upper reach of Rush Creek canyon. The dam is aligned along a generally north-south axis. It impounds Waugh Lake, a former natural alpine meadow, which is located on the west side of the dam at in elevation.

The reservoir has a storage capacity of acre-feet.5 The dam maintains minimum instream flows within Rush Creek, and it replenishes Gem Lake, located downstream to the east, which is the forebay for the hydroelectric system.6 History: The Nevada-California Power Company, under the control of the Nevada-California Electric Corporation, originally constructed the Rush Meadow Dam in The dam was constructed in order to increase the water storage on the Rush Creek Hydroelectric System. It was the third dam to be built in the system, in addition to the Agnew Lake Dam and the Gem Lake Dam. Company engineer R. G.

Manifold used a standard single-arch design for the Rush Meadow Dam, in contrast to the controversial multiple-arch design that was 3 Southern California Edison Company, Rush Creek Meadows Dam. 4 Southern California Edison Company, Rush Creek Meadows Dam. 5 Southern California Edison Company, Southern California Edison Hydro Generation Division (Draft) (Rosemead, California: Southern California Edison Company, 15. 6 State Water Resources Control Board, In the Matter of Water Quality Certification for Southern California Edison Rush Meadows Dam Geomembrane Liner Installation Project 1. ows_cert.pdf. Rush Creek Hydroelectric System, Rush Meadow Dam HAER No.

CA-166-H (Page 3) used for the other dams.7 The Rush Meadow Dam was constructed at an elevation of , one and a half miles above the head of Gem Lake. As with the earlier dam developments on Rush Creek, transporting building materials to the Rush Meadow Dam site was difficult and expensive. It involved railroads, trucks, tractors, tramlines, boats, and mule packs. Also as occurred in the earlier dam developments, local deposits of gravel and sand were used to mix concrete. These were found in the meadow above the dam.8 The first phase of construction was completed in September At that time, the structure was high and comprised of six equal steps on the downstream side. The crest was 400 long and 5.4 thick. The dam had a storage capacity of acre-feet.

In the Southern Sierras Power Company (which owned the dam at the time) undertook a second phase of development that had been planned since its original construction. That year, the dam was raised to ; and the following year the dam was raised to its current height and storage capacity.9 At some point during its construction, the spillway design changed from a curving inclined wall to a flat inclined wall.10 Since that time, minimal alterations to the Rush Meadow Dam have occurred as a result of maintenance and improvement projects.

Deteriorated concrete was repaired in and At the intake, the manual lift gates were replaced with hydraulic lift gates in The outlet pipes were replaced in and 12 of outlet pipe were removed after a portion broke loose in In ten post-tension anchors were installed in a 28 span at the south end of the dam to provide stability. These anchors consisted of Stressteel special grade bars, drilled vertically through the top step of the dam and 12 deep into the bedrock.12 Between and ten new vertical anchors were installed in 7 Valerie H. Diamond and Roger A. Hicks, Historic Overview of the Rush Creek and Lee Vining Creek Hydroelectric Projects (Fair Oaks, California: Theodoratus Cultural Research, Inc., 24. 8 Diamond and Hicks, Historic Overview, 24.

9 Diamond and Hicks, Historic Overview, 10 Nevada-California Power Company, Rush Creek Meadows Dam revised Southern California Edison Company database (SCE Drawing No. 11 Williams and Hicks, Evaluation, A-76. 12 Southern California Edison Company, Additional Dam Reinforcement last revised Southern California Edison Company database (SCE Drawing No. Rush Creek Hydroelectric System, Rush Meadow Dam HAER No. CA-166-H (Page 4) the spillway wing wall.

They augmented an existing framework of eight slanted anchors and three horizontal anchors in the spillway wall.13 The new anchor rods were installed vertically through the concrete wall in depths from approximately 4 to 22 6 , and the minimum embedment depth in the bedrock below varied from 12 6 to 16 6 , plus 5 to 9 of minimum bonding length at the bottoms of the anchors.14 Also at that time, spalled and loose concrete at the downstream face of the dam, adjacent to the outlet, was repaired.15 In the summer and fall of the ten original post-tension anchors at the south end of the dam, which had corroded, were replaced. Ultimately, the top 12 of the existing anchors were removed, and the remaining sections were abandoned in place and grouted over.

MCS Construction of Clovis, California, installed ten new anchors at the south end of the dam. They included triple corrosion protection grout, a plastic sleeve over the anchor rod, and the galvanized surface of the anchors and watertight caps. The loads of the new anchors were approximately three times higher than the original anchors installed in The new anchors, Williams R71 type, were located 4 8 apart. The rods varied in total length between approximately 61 and 66 , and they were embedded in bedrock to a minimum depth of 34 .17 As part of that project, MCS Construction also repaired deteriorated concrete at the central portion of the dam. In addition, ACE Restoration, Inc.

of Fullerton, California, repaired a large diagonal crack on the downstream face, which had occurred shortly after construction and which extended approximately 85 in length above the foundation.18 Other work at that time included installation of a photovoltaic facility and antenna support at the crest of the dam.19 Also in the summer and fall of a geomembrane liner was installed on the upstream face of the dam to prevent leakage and 13 Southern California Edison Company, Rush Creek Meadows Dam Modifications, Spillway Modifications, Plan & Elevation Southern California Edison Company database (SCE Drawing No. 14 Southern California Edison Company, Rush Creek Meadows Dam Modifications. 15 Southern California Edison Company, Rush Creek Meadows Dam Modifications. 16 John C.

Stoessel et al., Remote Rehabilitation, Civil Engineering: The Magazine of the American Society of Civil Engineers 81 17 Southern California Edison Company, Rush Meadows Dam Anchor Installation Plan and Elevation revised Southern California Edison Company database (SCE Drawing No. Southern California Edison Company, Rush Meadows Dam Anchor Installation, Anchor and Walkway Details Southern California Edison Company database (SCE Drawing No. 18 Stoessel et al., Remote Rehabilitation, 64. 19 Southern California Edison Company, Additional Dam Reinforcement. Rush Creek Hydroelectric System, Rush Meadow Dam HAER No. CA-166-H (Page 5) extend the life of the dam by approximately 30 years.20 CARPI USA, Inc.

of Roanoke, Virginia, designed and installed the geomembrane liner, a polyvinyl chloride geocomposite that provided a waterproof seal of the entire dam face.21

Sources

479 words

Source document Quoted word for word from HAER CA-166-H. Not written, edited or summarised by this site.

Primary Drawings provided by Southern California Edison Company: Nevada-California Power Company. Rush Creek Meadows Dam. revised Southern California Edison Company database (SCE Drawing No. Southern California Edison Company. Additional Dam Reinforcement. last revised Southern California Edison Company database (SCE Drawing No. Rush Creek Meadows Dam. Southern California Edison Company database (SCE Drawing No. Rush Creek Meadows Dam Modifications, Concrete Repair, Plan, Sections & Details. Southern California Edison Company database (SCE Drawing No. Rush Creek Meadows Dam Modifications Project Notes. Southern California Edison Company database (SCE Drawing No. Rush Creek Meadows Dam Modifications Project Notes. revised Southern California Edison Company database (SCE Drawing No.

Rush Creek Meadows Dam Modifications, Spillway Modifications, Anchor Details. Southern California Edison Company database (SCE Drawing No. Rush Creek Meadows Dam Modifications, Spillway Modifications, Plan & Elevation. Southern California Edison Company database (SCE Drawing No. 20 State Water Resources Control Board, In the Matter of Water Quality Certification, 1. 21 Stoessel et al., Remote Rehabilitation, 64. Rush Creek Hydroelectric System, Rush Meadow Dam HAER No. CA-166-H (Page 6) Rush Creek Meadows Dam Modifications. Southern California Edison Company database (SCE Drawing No. Rush Meadows Dam Anchor Installation, Anchor and Walkway Details. Southern California Edison Company database (SCE Drawing No. Rush Meadows Dam Anchor Installation Plan and Elevation.

revised Southern California Edison Company database (SCE Drawing No. Rush Meadows Dam Anchor Installation Project Notes. Southern California Edison Company database (SCE Drawing No. Rush Meadows Dam Modifications. Southern California Edison Company database (SCE Drawing No. Rush Meadows Reservoir. Not dated. (SCE Drawing No. Southern Sierras Power Co. Details of the Rush Creek Meadows Dam. Southern California Edison Company database (SCE Drawing No. Secondary Diamond, Valerie H., and Roger A. Hicks. Historic Overview of the Rush Creek and Lee Vining Creek Hydroelectric Projects. Fair Oaks, California: Theodoratus Cultural Research, Inc., Prepared for the Southern California Edison Company, Rosemead, California. Located at the Southern California Edison Company, Bishop, California.

Myers, William A. Iron Men and Copper Wires: A Centennial History of the Southern California Edison Company. Glendale, California: Trans-Anglo Books, Southern California Edison Company. Southern California Edison Hydro Generation Division (Draft). Rosemead, California: Southern California Edison Company, Located at the Southern California Edison Company, Bishop, California. Rush Creek Hydroelectric System, Rush Meadow Dam HAER No. CA-166-H (Page 7) State Water Resources Control Board. In the Matter of Water Quality Certification for Southern California Edison Rush Meadows Dam Geomembrane Liner Installation Project. Stoessel, John C., Mike N. Knarr, John Wilkes, and Craig McElfresh.

Remote Rehabilitation, Civil Engineering: The Magazine of the American Society of Civil Engineers 81 Williams, James C., and Roger A. Hicks. Evaluation of the Historic Resources of the Lee Vining (FERC Project Number and Rush Creek (FERC Project Number Hydroelectric System, Mono County, California. Fair Oaks, California: Theodoratus Cultural Research, Inc., Prepared for the Southern California Edison Company, Rosemead, California. Located at the Southern California Edison Company, Bishop, California.

Written history

208 words

Source document Quoted word for word from HAER CA-166-H. Not written, edited or summarised by this site.

The Historic American Engineering Record (HAER) is a long-range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service United States Department of the Interior. The Rush Meadow Dam recording project was undertaken by Galvin Preservation Associates Inc. (GPA) for the Southern California Edison Company (SCE) in cooperation with Justine Christianson, HAER Historian SCE initiated the project with the intention of making a donation to Archaeologist Crystal West (SCE) oversaw the project and provided access to the site. Historian Andrea Galvin (GPA) served as project leader.

Architectural Historian Matthew Weintraub (GPA) served as the project historian. James Sanderson (GPA) produced the large format photographs. The field team consisted of Andrea Galvin (GPA), James Sanderson (GPA), and Crystal West (SCE). Rush Creek Hydroelectric System, Rush Meadow Dam HAER No. CA-166-H (Page 8) Researchers may also refer to: HAER No. CA-166-A, Rush Creek Hydroelectric System, Powerhouse Exciters (January 15, HAER No. CA-166-B, C, D, E, Rush Creek Hydroelectric Worker Cottages (Buildings (September 30, HAER No. CA-166-F, Rush Creek Hydroelectric System, Agnew Lake Dam (January 14, HAER No. CA-166-G, Rush Creek Hydroelectric System, Gem Lake Dam (January 14,

In context

June Lake, California The place record: every map, photograph and survey of this town.
Mono County, California 214 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in June Lake

7 records

The federal surveyors worked through June Lake building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Rush Creek Hydroelectric SystemHAER CA-166-G8,034 words
Rush Creek Hydroelectric SystemHAER CA-166-F5,909 words
Rush Creek Hydroelectric SystemHAER CAL,26-JULA.V,1A-2,583 words
Rush Creek Hydroelectric SystemHAER CAL,26-JULA.V,1E-2,494 words
Rush Creek Hydroelectric SystemHAER CAL,26-JULA.V,1C-1,924 words
Rush Creek Hydroelectric SystemHAER CAL,26-JULA.V,1B-1,609 words
Rush Creek Hydroelectric SystemHAER CAL,26-JULA.V,1D-1,595 words

Provenance

  • Written history. Quoted verbatim from HAER CA-166-H. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.