Lockheed Martin Space Systems Company, Building 150, 1111 Lockheed Martin Way, Sunnyvale

Lockheed Martin Space Systems Company, Building 150, 1111 Lockheed Martin Way, Sunnyvale, Santa Clara County, CA. Surveyed as HAER CA-2322-A, with a 1,717-word written history.

From the record

“The Lockheed Martin Space Systems Company Plant One Complex has had an important association with the development of the defense industry and advanced communications systems in the San Francisco Bay Area.1 Large-scale technological contributions to defense- related pursuits were achieved here through aerospace manufacturing, research, and development.”

Written record, HAER CA-2322-A survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2322-A · the record runs 1717 words · one of 216 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

116 words

Source document Quoted word for word from HAER CA-2322-A. Not written, edited or summarised by this site.

The Lockheed Martin Space Systems Company Plant One Complex has had an important association with the development of the defense industry and advanced communications systems in the San Francisco Bay Area.1 Large-scale technological contributions to defense- related pursuits were achieved here through aerospace manufacturing, research, and development. Extant complex Buildings 150 and Building were built using concrete tilt-up construction in the early to mid- and are representative of industrial buildings developed for highly sensitive defense manufacturing and testing of the era.

Over time, each of the buildings has served the for a variety of contract research endeavors, including ballistic missile programs and advanced military satellite systems, notably through the Polaris, Agena D, TIROS, and THADD programs.

Written history

1469 words

Source document Quoted word for word from HAER CA-2322-A. Not written, edited or summarised by this site.

The documentation of Plant One, Buildings 150 and was conducted in for MT II LLC under a CEQA mitigation measure.2 For related Plant One Complex and Building descriptions and histories, see the following: Lockheed Martin Space Systems Company, Plant One Complex, HAER No. CA-2322 Lockheed Martin Space Systems Company, Building HAER No. CA-2322-B 1 WSA Inc. to Alex Jewell, memorandum, August 31, Archeological Records Search and Preliminary Architectural Evaluation for the Moffett Towers 2 Project in Sunnyvale, Santa Clara, California, 20. 2 Farallon Consulting Phase I Environmental Site Assessment Report Lockheed Martin Space Systems Company Buildings and 155 (Parcel (Sunnyvale: Lockheed Martin Space Systems Company, LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING 150 HAER No.

CA-2322-A Page 2 Part I. Historical Information A. Physical History: 1. Date of erection: 2. Architect: The Building Engineering department Number designed the building under building manager J. Appenzeller, and E. D. Cowley, manager of plant engineering.3 3. Original and subsequent owners, occupants, uses: The original owner was the Lockheed Missile Space Company, which evolved into Lockheed Missile & Space Division, and later, Lockheed Martin Space Systems Company. The occupants had continuously been Lockheed employees, and the building was continuously used as a multi-purpose building, which housed office services, plant services, standard tools, and some manufacturing functions. The building was originally known as the Central Services Building. MT II LLC presently owns Building 5.

Original plans and construction: The building was originally constructed as a square foot engineering building for approximately Construction began in November of and the building was completed in The building was a, tilt-up concrete type, fully air conditioned with colors and interior development similar to other facilities. 4 6. Alterations and additions: Two-story Building 150A was constructed at the northwestern end in which transformed the building s original rectangular footprint, to an L-shaped footprint. In a one-story square Building was constructed between the original rectangular Building 150 and new rectangular Building 150A addition. 3 Plans Set for Multi-purpose Building: Work to Begin This Month, Lockheed MSC Star, 1 November, Vol. 9. No. 26, pg. 2 4 Ibid.

LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING 150 HAER No. CA-2322-A Page 3 Part II. Structural/ Design/ Equipment Information A. General Statement: 1. Architectural character: Building 150 looks like the other buildings on the Plant One campus (extant and demolished), as they shared a similar visual language of non- ornamented, industrial construction, made to serve utilitarian purposes. At the internal public entrances and along internal public roads, there are suggestions to mid-century details including cantilevered overhangs, louvered windows, and a mixed exterior material palate of corrugated metal, concrete, and stone. 2. Condition of fabric: Very good. As the facility is vacant, there is various debris and furniture scattered throughout.

Minimal portions of the finish material have been removed, and portions of the flooring have been test bored throughout. B. Description of Exterior: 1. Overall dimensions: The building is approximately 380 -0 by 560 -0 at the main rectangular volume, and 180 -0 by 180 -0 at the square addition at the northwest corner. The building measures approximately 560 -0 at both the west and south elevations. 2. Foundations: The foundation is slab-on-grade. 3. Walls: Tilt-up concrete panels are interspersed with vertical patterned sheet metal siding at each elevation. At the public west elevation, a masonry wall sits below a band of windows. 4. Structural system, framing: Steel columns and steel truss beams compose the structural system and framing. 5.

Porches and loading docks: Flat overhangs with standing seam fascia are supported by brick clad columns at two porches along the west elevations, both accessed by concrete steps with corresponding concrete ramps. At the north elevation, metal columns support overhangs. There are multiple loading docks at the southwest elevation. 7. Openings: a. Doorways and doors: A metal storefront with glazed doors characterizes the primary, west, entrance. At the perimeter of the building, there are steel frame, slab and glazed doors. Metal overhead rollup doors are located at the north and east elevations. b. Windows and shutters: Large fixed storefront windows with metal assemblies are present at entrances at the west and south entrances, and in the office spaces along the north and west elevations.

LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING 150 HAER No. CA-2322-A Page 4 8. Roof: a. Shape, covering: The flat, membrane roof, has mechanical penthouses, mechanical units, piping, conduits, ducts, and roof vents. Certain portions of the building have a corrugated metal roof deck. C. Description of Interior: 1. Floor plans: The building is presently square feet. The floor plan was originally rectangular, and after the construction of two additions, the building is presently L-shaped. The building interior contains long hallways that continuously span much of the building, with segregated laboratory rooms, cubicle office rooms and large, open clean room manufacturing spaces. 2.

Stairways: There are six stairways in the building, which lead to three non-connected second-story portions of the building. Two stairways are located in the northwest extent of the building, while four are located at the south-central portion of the building. 3. Flooring: The hallways, laboratories, and offices include vinyl-tiled flooring. Tile is present in the restrooms. Private offices and conference rooms have carpet flooring. Production, clean room, and mechanical areas have either unfinished concrete or industrial finish coated concrete floors. There are raised computer floors in select rooms. 4. Wall and ceiling finish: a. Wall finish: The hallways are comprised of gypsum material with fiber- reinforced plastic wainscoting, and painted concrete masonry.

An anechoic chamber has specialty finishes for testing purposes. Sound-dampening textile wall finishes are present in the conference rooms. b. Ceiling finish: There are drop-ceiling tiles in individual rooms, including conference rooms and offices. The hallways and some laboratory spaces have gypsum-finished ceilings. Manufacturing spaces have exposed corrugated metal roof decking visible at the interior. 5. Openings: a. Doorways and doors: There are a variety of door-types at the interior, including wood veneer, metal rollup, and specialty metal doors of varying heights and thickness depending on the particular function of the space. b. Windows: Fixed interior windows are present in certain laboratory spaces, and mezzanine areas. 7.

Hardware: The hardware present in this building includes several electrically powered tracks with hoists at the ceiling, warning lights, fume hoods, PA alarm horns, cable trays, and secrecy lights in conference rooms. 8. Mechanical equipment: a. Heating, air conditioning, ventilation: There is forced air heating and cooling through vents in a suspended ceiling. Exhaust vents are present in laboratory and manufacturing spaces. b. Lighting: Lighting in the building is comprised of fluorescent fixtures, both flush in the dropped ceiling and suspended from the gypsum ceiling. LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING 150 HAER No. CA-2322-A Page 5 E. Site Layout: The building is located in the southern portion of what remains of Plant One.

A large electrical substation sits at the northeast corner of the building adjacent to Avenue. Numerous machinery, including compressors, compressed air cylinders, an emergency generator, diesel fuel aboveground storage tank, and a wastewater drainage structure sit to the northeast corner of the building. Landscaped areas and a parking lot sit to the building s north and west elevations. G Street separates the building from the western parking lot. Attached Building sits to the north of Building Part III. Operations and Process A. Operations: The building was most recently used primarily for laser-related testing by the Terminal High Altitude Air Defense (THAAD) missile interceptor system. This building also has several large clean room manufacturing spaces for production.

Historically, this building has housed classified work related to directed energy development. D. End Product: The laser-related testing allowed for break through defense research applications and the clean room manufacturing spaces allowed for the assembly of space-bound equipment. Satellites were assembled here, in addition to other classified defense-related technologies. 5 Farallon Consulting Phase I Environmental Site Assessment Report Lockheed Martin Space Systems Company Building (Sunnyvale: Lockheed Martin Space Systems Company, LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING 150 HAER No. CA-2322-A Page 6 Part IV. Sources of Information A.

Architectural drawings: Original Building 150 elevations, sections, and floor plans, produced in and existing building floor plans for the first and second floors, produced in and were reproduced for inclusion in this report. The Facilities Department at the Sunnyvale campus has access to an internal database which has digitized plans of Building The plans include original drawings from Building 150A Addition Plans from Building Addition Plans from and Building 150 Architectural Exterior Elevations from B. Early Views: Aside from the early aerial views present in the LOCKHEED MARTIN SPACE SYSTEMS COMPANY, PLANT ONE report number HAER No. CA-2322, limited photographs of the complex were accessible, and or available in a reproducible format. C.

Interviews: Jeff Gaut, Senior Bay Area Facilities Manager at Lockheed, was interviewed over the phone in March of D. Selected

In context

Sunnyvale, California The place record: every map, photograph and survey of this town.
Santa Clara County, California 238 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Sunnyvale

3 records

The federal surveyors worked through Sunnyvale building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Naval Air Station Moffett FieldHAER CA-335-A11,102 words
Lockheed Martin Space Systems CompanyHAER CA-23222,996 words
Lockheed Martin Space Systems CompanyHAER CA-2322-B2,171 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2322-A. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.