The documentation of Plant One, Buildings 150 and was conducted in for MT II LLC under a CEQA mitigation measure.2 For related Plant One Complex and Building 150 descriptions and histories, see the following: Lockheed Martin Space Systems Company, Plant One Complex, HAER No. CA-2322 Lockheed Martin Space Systems Company, Building HAER No. CA-2322-A 1 WSA Inc. to Alex Jewell, memorandum, August 31, Archeological Records Search and Preliminary Architectural Evaluation for the Moffett Towers 2 Project in Sunnyvale, Santa Clara, California, 20. 2 Farallon Consulting Phase I Environmental Site Assessment Report Lockheed Martin Space Systems Company Buildings and 155 (Parcel (Sunnyvale: Lockheed Martin Space Systems Company, LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING HAER No.
CA-2322-B Page 2 Part I. Historical Information A. Physical History: 1. Date of erection: a. Building b. Building 2. Architect: a. Building Staff Dale Paape addition) b. Building Staff 3. Original and subsequent owners, occupants, uses: The original owner was the Lockheed Missile Space Company, which evolved into Lockheed Missile & Space Division, and later, Lockheed Martin Space Systems Company. The occupants had continuously been Lockheed employees, and the building was continuously used as an engineering and laboratory building. MT II LLC presently owns Building a. Building By the Agea D program moved into Building In electronics engineering and electronics manufacturing merged into a new team and moved into building b.
Building Building 152 was constructed to meet the company s expanding activity in the Space Systems Division, and was constructed attached to the north of Building 5. Original plans and construction: a. Building Building 151 was constructed as a square foot building, for a total construction cost of $4 million. The building was the first building constructed on the 345-acre expansion of Plant One.6 b. Building Building 152 was constructed to house engineering and manufacturing operations for expanding Space Systems programs. Known as the engineering support building, the northern attachment to Building 151 was square feet. 7 6. Alterations and additions: Portions of building have been contemporaneously remodeled at the interior, with upgraded finishes and interior wall reconfigurations. a.
Building A two-story Building 151A addition was constructed on the east side of the building by E Street in The first and second floors were used entirely as office space. b. Building A High Bay addition was designed in built at the northeast corner sometime soon after. In an addition was built to house the Meteorological Satellites division, which was designed by Whisler Patri and constructed by Swinerton & Walberg contractors. 3 Lockheed Directors View Production. Lockheed MSC Star, no. 20 (November 26 2. 4 Integration, caption. Lockheed MSC Star, no. 26 (February 22 2. 5 SV to Get Two New Buildings. The Lockheed MSC Star, no. 4 (February 27, 4. 6 Plans for a $4 Million Building Expansion. Lockheed MSD Star, no. 25 (November 22, 1. 7 SV to Get Two New Buildings.
The Lockheed MSC Star, no. 4 (February 27, 4. LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING HAER No. CA-2322-B Page 3 Part II. Structural/ Design/ Equipment Information A. General Statement: 1. Architectural character: Building looks like the other buildings on the Plant One campus (extant and demolished), as they shared a similar visual language of non- ornamented, industrial construction, made to serve utilitarian purposes. At the internal public entrances and along internal public roads, there are suggestions to mid-century details including cantilevered overhangs, louvered windows, and a mixed exterior material palate of corrugated metal, concrete, and stone. 2. Condition of fabric: Very good. As the facility is vacant, there is various debris and furniture scattered throughout.
Minimal portions of the finish material have been removed, and portions of the flooring have been test bored throughout. B. Description of Exterior: 2. Foundations: The foundation is slab-on-grade. 3. Walls: Tilt-up concrete panels are interspersed with vertical patterned sheet metal siding at each elevation. At the public west elevation, a masonry wall sits below a band of windows. 4. Structural system, framing: Steel columns and steel truss beams compose the structural system and framing. 7. Openings: a. Doorways and doors: i. Building Glazed storefront assemblies are present at the main south elevation. ii. Building A large glazed storefront assembly is present at the main entrance at the northeast elevation.
At the northwest corner, another glazed storefront assembly projects from the building. b. Windows and shutters: i. Building Fixed metal windows along the south elevation at the office spaces, covered in metal vertical louver fins. There area fixed metal windows at the east and northeast elevations, which also have metal vertical louver fins at the exterior. A large glazed storefront-type assembly is present at the main entrance at the east elevation. ii. Building Windows are limited to the northwestern corner of the building, which has an entryway storefront with large plate windows, and corresponding multilite configurations at the lobby area. 8. Roof: a.
Shape, covering: Shape, covering: The flat, membrane roof, has mechanical penthouses, mechanical units, piping, conduits, ducts, and roof vents. Certain portions of the building have a corrugated metal roof deck. Building has a mechanical screen around the perimeter at the south elevation. Portions of the roof have a parapet. LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING HAER No. CA-2322-B Page 4 C. Description of Interior: 1. Floor plans: a. Building The floor plan is presently square feet, and is largely square in shape, with a rectangular addition projection at the east elevation. The building has three primary east-west hallways, and three primary north-south hallways, which continuously span much of the building.
The building contains large offices with multiple cubicles, large, open clean room manufacturing spaces, an engineering planning storage room, a computer room with a raised floor, and production and testing areas. A hallway at the northern extent of Building 151 serves as the internal connection to Building b. Building The building is presently square feet, and is irregular in footprint, as it has largely been since its original construction. A three-story High Bay addition sits at the northern extent of the building. The public entrance to the building is located at the northwestern corner. One major hallway runs from this lobby area north-south toward a hallway that delineates original Building 151 from Building 152 at the south.
This building includes office space, chemical testing labs, large, open clean room manufacturing areas, a mezzanine space with a large roll-up door, multiple former production spaces, and an anechoic chamber. 2. Stairways: a. Building Two stairways which are located at the west extent of the building lead to the second floor. b. Building 152:Two stairways in the eastern part of the building lead to two unconnected portions of the second floor. 3. Flooring: The hallways, laboratories, and offices include vinyl-tiled flooring. Tile is present in the restrooms. Private offices and conference rooms have carpet flooring. Production, clean room, and mechanical areas have either unfinished concrete or industrial finish coated concrete floors. There are raised computer floors in select rooms. 4.
Wall and ceiling finish: a. Wall finish: The hallways are comprised of gypsum material with fiber- reinforced plastic wainscoting, and painted concrete masonry. An anechoic chamber has specialty finishes for testing purposes. Sound-dampening textile wall finishes are present in the conference rooms. b. Ceiling finish: There are drop-ceiling tiles in individual rooms, including conference rooms and offices. The hallways and some laboratory spaces have gypsum-finished ceilings. Manufacturing spaces have exposed corrugated metal roof decking visible at the interior. 5. Openings: a.
Doorways and doors: There are a variety of door-types at the interior, including wood veneer, metal rollup, and specialty metal doors of varying heights and thickness depending on the particular function of the space. b. Windows: Fixed interior windows are present in certain laboratory spaces, and mezzanine areas. LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING HAER No. CA-2322-B Page 5 7. Hardware: The hardware present in this building includes several electrically powered tracks with hoists at the ceiling, warning lights, fume hoods, autoclaves, PA alarm horns, a plate burner, and cable trays. 8. Mechanical equipment: a. Heating, air conditioning, ventilation: There is forced air heating and cooling through vents in a suspended ceiling.
Exhaust vents are present in laboratory and manufacturing spaces. b. Lighting: Lighting in the building is comprised of fluorescent fixtures, both flush in the dropped ceiling and suspended from the gypsum ceiling. E. Site Layout: Building is located in the southern of what remains of the Plant One site. Numerous machinery, including compressors, compressed air cylinders, an emergency generator, diesel fuel aboveground storage tank, and a wastewater drainage structure sit to the north east corner of the building and to the west of the conjunction of the two buildings. Landscaped areas and a parking lot sit to the building s north and west elevations. G Street separates the building from the western parking lot.
Building 150 sits to the south of Building LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING HAER No. CA-2322-B Page 6 Part III. Operations and Process A. Operations: a. Building By the Agena D program moved into the building and the plant layout of Building 151 was altered to accommodate the new Agena headquarters here. 8 A year later in the electronics engineering and electronics manufacturing efforts integrated into a new team together into Building This was done to bring a closer relationship between two important elements of the company s overall electronics capability. 9 b. Building Due to the classified and highly sensitive nature of the production activities at Building limited specific information was available about the operations and processes at the building.
There was composite work done, as there were a few extant autoclaves in the building. The production in the high bay addition remains classified. The anechoic chamber room would have absorbed sounds or electromagnetic waves as part of testing or research for related programs. D. End Product: a. Building In the electronics engineering and electronics manufacturing efforts integrated into a new team together into Building This was done to bring a closer relationship between two important elements of the company s overall electronics capability.
The integration of these two important elements of s electronics efforts occurred now under one roof in Building Most recently this building was used primarily by Strategic & Missile Defense Systems LOB: Engineering and Development work on Terminal High Altitude Air Defense (THAAD) missile interceptor system. 8 Integration, caption. Lockheed MSC Star, no. 26 (February 22 2. 9 Ibid. 10 Ibid. LOCKHEED MARTIN SPACE SYSTEMS COMPANY, BUILDING HAER No. CA-2322-B Page 7 Part IV. Sources of Information A. Architectural drawings: a. Building Existing floor plans for the first and second floors, produced in and were produced for inclusion in this report. b. Building Existing floor plans for the first and second floors, produced in were produced for inclusion in this report.
The Facilities Department at the Sunnyvale campus has access to an internal database which has digitized plans of Building The plans include Building 151A Addition plans and exterior elevations from Building 152 High Bay Addition plans from and Building 152 Exterior Elevations from B. Early Views: Aside from the early aerial views present in the LOCKHEED MARTIN SPACE SYSTEMS COMPANY, PLANT ONE report number HAER No. CA-2322, limited photographs of the complex were accessible, and/or available in a reproducible format. C. Interviews: Jeff Gaut, Senior Bay Area Facilities Manager at Lockheed, was interviewed over the phone in March of D. Selected