This Historic American Engineering Record was prepared by Southern California Edison Senior Archaeologist Audry Williams and Rincon on behalf of Southern California Edison, as partial mitigation for impacts resulting from the removal and/or replacement of twelve towers on the Long Beach-Laguna Bell and Transmission Lines. Shannon Carmack, Rincon Senior Architectural Historian, served as the project lead and oversaw the preparation of this report. Rincon Architectural Historians Rachel Perzel and James Williams assisted in the preparation of this report. HAER photography was produced by architectural photographers Stephen D. Schafer and Dennis Hill in July Location maps were prepared by Rincon GIS Analyst, Allysen Valencia.
LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 3) Part I. Historical Information A. Physical History 1. Dates of construction: 2. Engineer: Southern California Edison Company 3. Builder: Stone & Webster Construction Co., Pacific Coast Steel Company (Tower Fabrication). 4. Original plans and construction: The Long Beach-Laguna Bell and Transmission Lines were installed from the Long Beach Steam Station to the Laguna Bell Substation in to transmit power from the Long Beach Steam Plants No. 2 and 3. These lines pass through the Lighthipe Substation and continue onto the Laguna Bell Substation, located approximately seventeen miles north of the Long Beach Steam Station.
From the Long Beach Steam Station to the Lighthipe Substation, the and lines parallel each other for a distance of roughly nine and a half miles. From Lighthipe to the Laguna Bell Substation, parts of the southern portions of the and lines were constructed in separate rights-of-way. The lines then come to parallel each other in a shared right-of-way. The construction of these lines included crossing the Cerritos Channel. The channel crossing consisted of two tall multiple-circuit lattice steel towers (one on either side of the channel) holding six circuits each and a tall double-circuit lattice steel tower that holds two circuits.
Starting at the forth span of towers, the lines are located either on a twelve-to-fourteen- circuit tower, constructed on three legs with two 55' bridges or on a single six-to- eight-circuit tower constructed on two legs with a 55' bridge, both of which stand approximately 94' tall (SCE Drawing No They were constructed complete with ladders and stairs to allow easy climbing access. As originally constructed, the transmission line (from Long Beach-Laguna Bell) lattice steel towers vary in their number of circuits, from two to twelve, as they leave and/or rejoin the right-of-way. The take-off towers and the first three spans are constructed on two side-by-side six-circuit towers, followed by thirteen twelve-circuit towers, nine seven-circuit towers, and twenty-eight six-circuit towers.
The lines enter a rack at Lighthipe Substation, after which they are in succession, one seven-circuit tower, two eight-circuit towers, six seven-circuit towers, three six-circuit towers, nine two-circuit towers, five six-circuit towers, and one eight-circuit tower. Finally, the lines enter the rack at Laguna Bell Substation.
LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 4) The transmission line as originally constructed from Long Beach-Laguna Bell begins at two take-off towers out of Long Beach and continues on various double-circuit towers, including two spans of double-circuit channel towers, a double-circuit special standard tower, eight 45-degree anchor towers, a 90-degree anchor tower, forty standard suspension towers, and two transposition towers. The transmission line enters a rack at Lighthipe Substation. From Lighthipe Substation to Laguna Bell Substation the transmission line was constructed on two parallel transmission lines on twenty-four spans of single- circuit standard Vincent towers. 5.
Alterations and additions: Originally, the transmission lines began at the Long Beach Steam Station, connected to the Lighthipe Substation and terminated at the Laguna Bell Substation. These lines were named the Long Beach-Lighthipe and Laguna Bell-Lighthipe circuits, respectively. The towers were designed to hold multiple circuits that entered and exited the right-of-way. Over time circuits were added and removed from the towers along the alignment as needed. Today these multi-circuit towers do not necessarily have the maximum number of circuits that a tower can hold. The majority of the original towers remain in the right-of-way between Long Beach and Lighthipe.
However, the following alterations have been made: A 15' extension was added to tower was removed and replaced with four double-circuit towers Four additional double-circuit towers, M3A-T4, were added in the alignment to interconnect the lines to the Hinson Substation Four Tubular Steel Poles were inserted between and to cross Interstate (I) 405 and were removed and replaced with five sets of taller three double-circuit towers to cross where I-710 and California State Route 91 interconnect From Lighthipe to Laguna Bell only eight six-circuit towers remain. These are the last eight structures before the line feeds into the rack at Laguna Bell. All other original towers have been removed and/or replaced.
As originally built, the lines began at the Long Beach Steam Station, connected to the Lighthipe Substation and terminated at the Laguna Bell Substation. They were originally named the Long Beach-Lighthipe and the East & West Lighthipe-Laguna Bell lines. Today the west circuit LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 5) loops into the Harborgen and Hinson Substations prior to entering Lighthipe Substation. The east circuit does not loop into these substations. The east line has been renamed the Harborgen-Long Beach, Harborgen-Hinson, and Hinson- Lighthipe circuits. The west line remains the Long Beach-Lighthipe Circuit.
To connect the lines with the Hinson Substation, two towers were added to the alignment, and To cross Interstate (I) 710 and California State Route 91, was removed and replaced with a taller tower, and M8-T3A was added to the alignment. The portion of the line between Lighthipe and Laguna Bell that contained the parallel single-circuit Vincent towers has been removed. SCE records indicate that the lines were reconfigured and rebuilt on double-circuit towers in the B. Historical Context 1. Long Beach and Port of Long Beach The beginnings of urban development in present-day Long Beach date to the A land development firm called the California Immigrant Union (CIU) organized a plan to purchase and subdivide acres of the Cerritos Ranch.
After the company backed out of this undertaking in former CIU employee William Willmore attempted to revive the venture. Under Willmore s leadership, the former ranch land was surveyed and the nascent community was named Willmore City. In spite of some success in luring settlers to the new community, Willmore s efforts ended in failure the following year, when severe rains flooded his tract.
Development soon resumed under the backing of the Long Beach Water and Land Company, and the settlement was renamed Long Beach in The Long Beach Development Company purchased the tract in A condition of this acquisition was that the company would assume ownership of 800 acres of marshlands immediately west of the town, at the site of the present Port of Long Beach.1 In the community of 800 was incorporated.2 Benefitting from a regional population boom and a corresponding wave of industrialization, Long Beach grew rapidly in the period between the through the The brought in prospective buyers by rail promising a beachside resort community.
3 In the first decade of the twentieth century, however, developments in Long Beach belied its resort town reputation, and the city took on a character more consistent with that of a commuter suburb. This 1 Lois J. Weinman. Los Angeles-Long Beach Harbor Areas Regional Cultural History, Los Angeles County, California (Springfield, Virginia: National Technical Information Service, 39. 2 Sapphos Environmental, Inc., City of Long Beach Historic Context Statement (City of Long Beach, 92. 3 Weinman, 39.
LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 6) change came as result of the extension in of the Pacific Electric Railway s interurban line to Long Beach and the emergence of a local industrial job base in San Pedro around this time.4 In ten years after incorporation, the population of Long Beach totaled more than The influx of new residents also reflected changing patterns of settlement in Los Angeles County s suburban communities. Growth in the county shifted from outlying rural, agricultural areas to suburban industrial clusters, such as Vernon, Whittier, and Huntington Park.
Industrial and residential growth in these communities often went hand in hand with the arrival of new industrial outfits, usually in the form of petroleum extracting and processing businesses. By the the oil business had arrived in Long Beach, helping to secure the city s future as an important regional industrial center.5 The development of Long Beach Harbor on San Pedro Bay in the first two decades of the twentieth century also helped to cement the industrial character of the Long Beach economy.
The earliest development there came in when the Los Angeles Terminal Railroad consolidated a rail line between its Terminal Island warehouse and wharf complex and the town of Altadena.6 In the following years, a program of improvements at Long Beach Harbor unfolded concurrently with those carried out at the neighboring Los Angeles Harbor. In the southern California-based Land and Navigation Company sold its marshland tract situated within the Long Beach city limits to the Los Angeles Dock and Terminal Company (LADTC).
As the Los Angeles Times reported, the tideland tract s new owners planned to build nearly six miles of new wharf age, in addition to channels of 21' to 32' deep.7 The following year, LADTC signed a contract with the City to dredge a turning basin and three channels in what was later known as the inner harbor. This work laid the foundation for the development of industry in the harbor. In SCE began construction on its oil-fired Terminal Island Steam Plant, becoming what one historian termed the first non-marine industry to locate in the then-developing Long Beach Harbor. The selection of this site reflected the conventional practice among plant engineers of situating steam plants near railroad facilities and convenient sources of water for the purposes 4 Weinman, 39; Fred W.
Viehe, The Social-Spatial Distribution in the Black Gold Suburbs of Los Angeles, Southern California Quarterly 73, no. 1 (Spring 34. 5 Viehe, 6 Franklin Hoyt, Influence of the Railroads in the Development of Los Angeles Harbor, The Historical Society of Southern California Quarterly 35, no. 3 (September 7 Weinman, 40; Would Build Free Harbor, Los Angeles Times, December 12, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 7) of accessing fuel and boiler-feed water, respectively.8 The steam plant opened in Industrial and infrastructural development at the harbor continued following the opening of the Long Beach Steam Station.
Craig Shipbuilding Company opened its yards nearby in The City constructed a municipal wharf in adding to the appeal of the port. In the LADTC folded, due to the onerous costs of frequently dredging the harbor of silt deposits from the Los Angeles River. The City of Long Beach assumed ownership of the harbor in the wake of LADTC s collapse. Further improvements were slated, when, in Los Angeles County voters approved by a fifteen-to-one margin million in bonds for the construction of the Los Angeles River Flood Control Channel.
Aside from restraining the flow of the river, the concrete-lined retaining feature would also reduce the discharge of soils into the harbor.9 Construction was slow to begin due in part to a wartime ban on the collection of municipal bonds; however, the channel was completed in In the City of Long Beach and the United States (U.S.) Army Corps of Engineers completed a joint project connecting the Los Angeles and Long Beach harbors by converting Cerritos Slough into the wide Cerritos Channel.11 The spate of improvements completed in the first two decades of the allowed for the increased industrial development of the harbor.
By the number of Long Beach Harbor tenants grew to include such industrial enterprises as fish and seafood canneries, a kelp harvester and potash plant, a fabric manufacturer, and a lumber yard.12 In the years after World War I, the population growth and economic expansion of Long Beach mirrored trends in the greater Los Angeles area. In the estimation of one historian of the Los Angeles area, a measure of the population of all but three of the region s industrial suburbs grew by an average of around 200 percent in the Long Beach and its satellite communities in Alamitos, Signal Hill, and Dominguez lagged somewhat in this period, growing by 155 percent and reaching 8 Andree, Operating Interconnected Hydro Plants for Best Economy, Electrical World 79, no.
19 (May 13, 9 Weinman, 10 Weinman, Bond Decision to Help Long Beach, Los Angeles Times, January 1, Blake Gumprecht, The Los Angeles River: Its Life, Death, and Possible Rebirth (Baltimore: The Johns Hopkins University Press, 11 Weinman, 40. 12 Woolen Plant Started, Los Angeles Times, April 24, Women Put Up Sardine, Los Angeles Times, March 3, Long Beach to Deepen Channel, Los Angeles Times, March 25, New industry for Long Beach, Los Angeles Times, March 25, New from South of Tehachapi, Los Angeles Times, April 28, Incorporate Big Canning Company, Los Angeles Times, July 18, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 8) a total population of in Oil industry expansion also contributed to development at the harbor.
Richfield Oil Company built substantial facilities at the port, and moneys generated by the petroleum industry helped to fund further infrastructure improvements at the harbor.14 Among the publicly financed improvements made to the harbor in the were the first phases of construction of the Outer Harbor in including a breakwater and two moles and the addition of a new municipal wharf in While much of the local growth of the interwar years can be attributed to the petroleum boom in Signal Hill, other significant factors were also at play. For one, in Long Beach Harbor was made the headquarters of the U.S. Navy Pacific Fleet.
As servicemen were eventually stationed there, demand for housing grew.16 In addition, growth continued at the harbor as a large tract of Union Pacific Railroad land was opened to development by tenants whose business promised to bring in hefty shipping fees.17 Rapid regional growth and the record-setting winter drought of raised concerns among SCE engineers that by the coming summer their grid would lack sufficient capacity to meet demand. In response, they made arrangements for the construction of an additional steam plant at the Terminal Island facility. During the summer of the feared power shortages materialized, due mostly to low water levels at SCE s Big Creek Hydroelectric System located in the Sierra Nevada Mountains. During construction of Long Beach Steam Plant No.
2, SCE enacted stopgap measures to meet the peak demand of summer. These measures were insufficient, however, and its southern California service area faced 144 power-short days during the summer of The company completed plant No. 2 in Plant No. 3 was added to the Long Beach complex in The existing transmission towers on the south side of Cerritos Channel were planned and erected between and SCE s expanded electrical production figured in civic boosters plans for, and visions of, future industrial development in the Greater Los Angeles area. Published before Plant No. 3 was completed, a Los Angeles Times article 13 Viehe, 41, 43. 14 Sapphos Environmental, 76. 15 Weinman, 40. 16 Sapphos Environmental, 46. 17 New Land Now Open at Harbor.
Los Angeles Times, October 21, New Industry at Long Beach, Los Angeles Times, August 6, Lumber Firm Builds Docks, Los Angeles Times, November 1, Industrial Revival at Beach City, Los Angeles Times, November 23, 18 William A. Myers, Iron Men and Copper Wires: A Centennial History of the Southern California Edison Company, 2nd ed. (Glendale: Trans-Anglo Books, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 9) observed not only that the Terminal Island location for the steam power facility was ideally suited to take advantage of nearby rail and highway service, but also that the site was located in a burgeoning industrial zone of regional importance.
Moreover, the article s author surmises, The Edison Company is looking forward to the time when the territory east of Los Angeles and extending through Montebello, Whittier, Norwalk, Downey, Clearwater and contiguous communities, all the way from the foothills to the harbor, will be a highly developed industrial section. The proximity of Terminal Island to these communities, the author reasoned, would make it feasible for Edison to deliver electrical power inexpensively enough to entice new industrial consumers to the region.19 Thanks to the ongoing port improvements and the maturation of the regional industrial economy, two major manufacturers announced plans to open factories at Long Beach Harbor in the In the City of Long Beach signed an agreement with the Ford Motor Company.
Per the contract signed by Mayor Charles Henderson, the City agreed to dredge a wide, 30' deep channel connecting the company s private docks to the open ocean. To honor its part of the agreement, Ford began construction on its Long Beach Assembly plant by early The automaker began production at the new forty-acre factory in April of promising a production capacity of 400 cars per day and a projected workforce of up to In addition, executives at Procter and Gamble announced their intention to locate a soap factory at the harbor in late though the plant was not opened until By the terminal had an annual capacity of 1 million tons of cargo.22 With the onset of the Great Depression in the the local economy suffered and Long Beach s municipal budget was strained.
The city s tourism industry was particularly hard-hit. Falling property values and declining demand for oil contributed to a steep drop in local tax revenues.23 On March 10, the Magnitude 6.4 Long Beach Earthquake caused widespread damage and seemed to compound the stress caused by economic stagnation.
As recovery from the temblor continued into the mid-1930s, however, the rebuilding effort helped to 19 Island Edison Unit Started, Los Angeles Times, March 6, 20 Ford Plant at Port Assured, Los Angeles Times, June 30, Southeast of the City, Los Angeles Times, January 3, Ford Long Beach Gigantic Assembly Plant to be Formally Opened with Ceremony, Los Angeles Times, April 20, 21 Announce Huge Factory Plan, Los Angeles Times, November 28, Procter and Gamble Celebrates 50 Years in Harbor, Port of Long Beach Harbor Highlights, No. 1 (Fall 1. 22 Sapphos Environmental, 77. 23 Sapphos Environmental, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 10) pull Long Beach out of economic depression.
The discovery of the Wilmington Oil Field in signaled further good fortune for the local economy, as pumping near the port district coincided with the early stages of economic revival.24 The success of the port in establishing itself as an industrial center and home for the U.S. Navy helped also helped to sustain the viability of the port during the Great Depression.25 By the nearly officers and sailors were stationed at Long Beach Harbor. Their spending served as a vital injection into the local economy during the lean years of the The Works Progress Administration (WPA) administered federally funded deep-water shipping projects at the Outer Harbor.
Among these was the construction of a concrete and steel freight and passenger terminal at Pier A, completed as a joint project with the Long Beach Harbor Department. In addition, in the WPA launched a improvement program that began with the construction of Pier B as a terminal for lumber shipping.27 By the start of the military uses became increasingly prominent at Long Beach Harbor. Following the attack on Pearl Harbor, the U.S. Navy assumed control of the facility and most operations there were converted to military shipping and production. The Navy administered a large building program, constructing Roosevelt Navy Base, the Long Beach Naval Shipyard, and a U.S. Naval Hospital. A handful of additional shipyards at Long Beach contributed to the war effort.
Several infrastructure projects were also completed as the harbor was put on a war footing.28 Among these was the construction of Victory Pier, a twenty-eight-acre terminal facility. Additional war production took place locally at Long Beach Airport, where the Douglass Aircraft Company erected a 242-acre assembly plant.29 War World II was an electric war in which utilities played a major role. Electricity enabled factories to triple production. SCE supplied power to numerous large industrial complexes in the Port of Los Angeles and surrounding communities including Douglas Vultee and Northrup aircraft plants; Consolidated Steel, and Craig, Fellows and Stewart ship builders; and the Long Beach Naval Shipyards.
These plants as well as numerous other factories and military bases in 24 Sapphos Environmental, 48. 25 Sapphos Environmental, 60. 26 Sapphos Environmental, 60. 27 Work To Star, Los Angeles Times, March 6, Extensive New Program to Be Launched at Harbor, Los Angeles Times, March 7, 28 Peter P. Smongesky, Introduction to Port of Long Beach Chronological History, In C. F. Connors, ed., Chronological History By Pier: 29 Sapphos Environmental, 48.
LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 11) SCE s service territory placed unprecedented demands on SCE s generating resources as electrical demand increased ninety-four percent between and In May the Power Branch of the War Production Board suggested that all investor-owned and government-owned utilities in California, southern Nevada and Arizona form the Pacific Southwest Power Pool. Through interconnections, all utilities in the pool, including SCE, operated as one large electrical system for the duration of the war. Power-short utilities in one area were able to draw upon the reserve capacity available from other utilities.31 Much of the energy used in local war industries was produced at Long Beach Steam Station.
However, wartime restrictions discouraged the burning of fuel oil. California's oil fields were also being pumped to the maximum extent for the war effort. As a result of this, more gas was being produced than could be consumed by domestic customers. The War Production Board suggested to the Pacific Southwest Power Pool that Long Beach Steam Station's eleven units be operated to full capacity using this surplus gas as fuel. Excess power produced at plants not used by SCE customers was supplied to San Diego Gas and Electric and Los Angeles Department of Water and Power.32 On November 24, the Procurement Division of the U.S. Treasury Department announced the friendly seizure of Generating Units No. 7 and 8 (two, Kilowatt units) from Plant No.
2, previously built to elevate the drought, for the purpose of sending these units to Russia to fulfill Lend-Lease commitments. At this time, SCE had the only fifty-cycle system compatible with European systems in the U.S. The U.S. government delivered an kW unit to SCE in October To replace the "borrowed" Long Beach units, the government provided a new General Electric machine to SCE, which was installed the same month.33 The end of the war brought profound changes to Long Beach and its port. Military demobilization delivered a severe blow to a local economy that had become temporarily dependent on war production. Between the abrupt curtailment of defense manufacturing and the return of the Pacific Fleet to its home base, the city faced a potential postwar employment crisis.
The Naval Shipyard served as a major regional employer around this time. Approximately employees were 30 Myers, 31 Myers, 32 Myers, 33 Myers, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 12) put to work repairing damaged freight ships that would be used to ferry overseas soldiers to stateside civilian life. Shipping and industrial facilities in the harbor were soon put back to civilian commercial uses, and the Port of Long Beach became one of the most productive ports on the West Coast.34 Starting in the the Long Beach Harbor Department was forced to confront the issue of land subsidence at and around the harbor, a problem likely caused by the pumping of oil and natural gas from the land beneath the port.
Harbor officials first observed sinking ground levels before U.S. Navy officials noted that the situation was worsening during the early but directed their attention to more pressing wartime concerns.35 Subsidence continued after the war, with officials noting that the problem had become extreme by the time of a May Long Beach Independent report on the matter. A large subsidence zone centered on the Long Beach Steam Station had come to encompass much of the harbor and extend as far north as Anaheim Street. Situated at the center of the sinking area, the SCE plant had sunk as much as 8' though none of the buildings had incurred significant damage as a result.
A study underscored the threat that the geological phenomenon presented and predicted that left unremedied subsidence would, by lead to as much as a 24' drop in ground level at the electrical plant and a 6' drop at Rainbow Pier, on the downtown waterfront.36 The subsidence problem was finally resolved in the mid-1950s, when seawater was pumped into depleted oil pockets. By the mid-1960s, the cost of fighting subsidence totaled $90 million.37 Through the late twentieth century global economic changes reverberated at the Port of Long Beach.
Ford announced the imminent closure of its Long Beach Assembly Plant in July A company spokesperson explained that the plant s closure had nothing to do with the subsidence problem in Long Beach, but rather that consolidating its Long Beach and Pico-Rivera facilities was the latest step in the company's long-range program for improving its West Coast assembly operations. 38 Another major tenant, Proctor and Gamble, shuttered its Port of Long Beach factory in citing the relatively high production costs at its Long Beach facility.39 Despite the loss of major manufacturers in the late twentieth century, the Port of Long Beach constitutes a massive shipping center with 34 Sapphos Environmental, 77.
35 Smongesky, 36 Project Nears to Hold Back Long Beach Independent Press-Telegram, January 18, 37 Sapphos Environmental, 79. 38 Warren Walters, Ford to Close Plant, Move to Pico, Long Beach Independent, July 26, 39 David Haldane, An Institution Is Fading Away In Long Beach: Procter & Gamble Closing Plant It Opened in Los Angeles Times, June 29, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 13) multiple types of industrial and commercial occupants. It remains the busiest port on the West Coast. 2. Formative Years of Southern California Edison SCE is comprised of electrical infrastructure built by SCE and its predecessor companies obtained through a series of mergers and acquisitions in the company s history from forward.
SCE traces its origins back to July 4, On that day, the partnership of Holt and Knupp, which later became the Visalia Electric Light and Gas Company, first used a steam engine fueled by cord wood to power arc lights during Visalia s evening 4th of July celebrations. Later that same year, the Santa Barbara Electric Light Company was formed and quickly installed outdoor arc lights to illuminate the balmy resort evenings in downtown Santa Barbara. Both the Visalia and Santa Barbara companies would later be merged into SCE in the early In the first commercial hydroelectric plant in the west was built at the community of Highgrove near the city of Riverside.
Built by the Riverside Water Company, the plant took advantage of a 50 foot water drop in an irrigation canal to turn three waterwheels and direct current dynamos. The electricity was transmitted a very short distance to illuminate 30 arc lights in Riverside and Colton. In the Riverside Water Company was incorporated as the San Bernardino Electric Company and was later acquired by SCE in the early That same year the Pasadena Electric Light and Power Company installed steam-driven current generators to power arc lights for street lighting in Pasadena. Likewise, in the Ventura Land and Power Company installed hydroelectric generation to power arc lights in downtown Ventura, thereby catching up with their neighbors in Santa Barbara further up the coast.41 In businessman Henry Sinclair and Dr.
Cyrus G. Baldwin, the first president of Pomona College, co-founded the San Antonio Light and Power Company with the intention to provide electric street lighting to the city of Pomona. The technical challenge they faced was that direct current power could not be practically transmitted long distances. Baldwin hired A.W. Decker, an engineer familiar with the cutting edge of advances being made with alternating current. In late Decker installed the first single phase alternating current hydroelectric generator in San Antonio Canyon at the Pomona Power Plant (also referred to as the San Antonio Plant). The plant transmitted power fourteen miles 40 Edison International, Hydroelectric Power near Riverside, Calif.
A Look Back: Our History accessed October 13, 41 Edison International, Steam-Powered Street Lights in Pasadena, Calif. A Look Back: Our History. accessed October 13, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 14) to Pomona and, one month later, twenty-nine miles to San Bernardino. The age of long distance transmission had begun, thereby opening access to remote hydroelectric resources. Most history texts consider the Niagara Falls to Buffalo, New York transmission line as the first long distance line in the nation built in but the reality is that the San Antonio Light and Power Company (with A.W. Decker) did it four years earlier in San Antonio Canyon. A bronze plaque marks the spot on Mt.
Baldy Road.42 In Henry Sinclair formed the Redlands Electric Light and Power Company to provide power to the Union Ice Company for the new electric motors in its ice making facility in Mentone. The closest hydroelectric resource was eight miles away at Mill Creek. This long distance would require a high voltage alternating current. Decker recommended that a new three phase alternating current generator be installed. The new three phase system enabled electric motors to start and stop independently of the generator and delivered a smoother power torque to the rotating equipment. The Mill Creek plant was the first commercial power plant in the U.S. to use three phase alternating current.
Today, the three phase power generation remains the standard for power generation worldwide.43 In the Mill Creek plant powered electric pumps installed to irrigate many of the orange groves in Redlands. This was the earliest recorded use of electric pumps for irrigation purposes.44 Although the original equipment was upgraded in the Mill Creek plant remains in operation today as the oldest active poly phase power plant in the U.S. In the Kaweah Power and Water Company was formed to survey the potential development of hydroelectric facilities on the Kaweah River above Visalia and Tulare County. The Kaweah Hydro Plant began operating in and its operations were folded into the larger Mount Whitney Power Company.
In the Mount Whitney Power Company was renamed as the Mount Whitney Power and Electric Company, and in was acquired by SCE.45 Based in the central valley, the Mt. Whitney Power Company focused primarily on rural customers with Visalia being the largest town on its system. The company covered most of Tulare County and portions of the neighboring Kings and Kern counties, and built two additional hydroelectric plants on the Kaweah River; Plant 42 Edison International, Electric Streetlights for the City of Pomona A Look Back: Our History. accessed October 13, 43 Edison International, Introducing Three-Phase Alternating Current Generation A Look Back: Our History. accessed October 13, 44 Edison International, Irrigating Orange Groves with the Help of Electric Pumps A Look Back: Our History.
accessed October 13, 45 Edison International, Developing Hydroelectric Facilities on the Kaweah River A Look Back: Our History. accessed October 13, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 15) Two in and Plant Three in The company purchased the Tule River hydroelectric plant in from the Globe Light and Power Company, enlarged its existing Visalia Steam Plant in and acquired a smaller plant at Tulare in from the Tulare County Power Company.
Henry Huntington, of the Pacific Light and Power Company, purchased controlling interest of the Mount Whitney Power and Electric Company in June West Side Lighting Company and Edison Electric Company In a syndicate of Los Angeles businessmen formed the West Side Lighting Company in response to the city s increased need for electricity. The West Side Lighting Company sought to utilize the Edison three wire conduit technology invented years earlier by Thomas Edison. They soon discovered, however, that use of the Edison technology was prohibited due to a special contract negotiated between a speculative and inactive company established in under the name Los Angeles Edison Electric Company and Thomas Edison s own General Electric Company.
The contract provided the Los Angeles Edison Electric Company with exclusive southern California rights to the three wire technology. In that same year, Henry Sinclair of the Redlands Electric Light and Power Company teamed with Henry Fisher, a prominent Redlands resident, to form the Southern California Power Company to pursue the construction of a new hydroelectric facility on the Santa Ana River. In West Side Lighting Company President George H. Barker met with General Electric officials in San Francisco to negotiate for use of the Edison technology in the Los Angeles area and to discuss a potential merger between the West Side Lighting Company and General Electric.
The new Edison Electric Company of Los Angeles (EEC) was incorporated on December 1, and with George Barker as the company head, the new company took over all the properties and franchises of the West Side Lighting Company and secured the valuable equipment licenses of the inactive Los Angeles Edison Electric Company. Thirsty for more power supplies for downtown Los Angeles, the EEC purchased the Southern California Power Company in and constructed the Santa Ana River No. 1 to Los Angeles Transmission Line, an eighty-three mile high voltage transmission line to bring the power into downtown Los Angeles. At the time, this was by far the longest and highest voltage transmission line built in the country. Edison engineer Orville Ensign designed the Redlands insulator for use on the line.
This innovative insulator design was rapidly adopted throughout the West.47 In the following 46 Myers, 47 Edison International, Hydroelectric Power & the Santa Ana River A Look Back: Our History. LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 16) years, EEC merged with and acquired additional electric lighting and power companies and soon expanded into communities outside of Los Angeles as far north as Santa Barbara and as far east as Redlands. The West Side Lighting Company and the EEC, with the Pacific Light and Power Company, are among the most important of SCE s ancestral companies.
At the turn of the century, the EEC, alongside its primary competitors, Pacific Light and Power Company, the San Joaquin Power & Light Company, and Pacific Gas & Electric Company, served as the pioneering commercial entities for electrical generation and distribution in California. In California, at the inception of electrical transmission technology, power was distributed via wood poles and later iron poles, but was limited to short spans carrying a low voltage.
The development of hydroelectric power at the end of the nineteenth century set a precedent for satisfying the demands of commercial electrical needs of the twentieth century, and led to the installation of electrical transmission lines spanning great distances from generating facilities at California s river banks, through mountain ranges and deserts, before terminating within the urbanizing communities of Southern California. Leading the company in this period of innovation and expansion was John Barnes Miller. He had joined the West Side Lighting Company as its General Manager in Miller coined the company motto that survives to this day: Good Service, Square Dealing, and Courteous Treatment.
Known as the Great Amalgamator he recognized that lower costs could be achieved by expanding the scale of the company through mergers and acquisitions. Miller served as President of the EEC (and later SCE) for thirty-one years, presiding over the most expansive period in its history. He died in To date John Barnes Miller has been the longest serving chief executive officer of SCE.48 In EEC began operations at the Kern River No. 1 Powerhouse, a volt facility on the banks of the Kern River north of Bakersfield, California. Five years earlier, in EEC Chief Hydraulic Engineer, F. C. Finkle surveyed the remote area of Kern Canyon with a vision of a great hydroelectric power plant supplying the electrical needs of the rapidly growing region of Los Angeles.
Two years after the initial survey, EEC Vice President Henry Sinclair chose a suitable location along the Kern River, what was to become the location of Kern River Powerhouse No. 1, situated approximately fourteen miles upstream from the accessed October 13, 48 Edison International, Our motto: Good Service, Square Dealing, and Courteous Treatment A Look Back: Our History. accessed October 13, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 17) mouth of Kern River.
Powerhouse No.1 was set for service in early The Powerhouse served as the generating facility for the EEC s Kern River to Los Angeles Transmission Line, a 117 mile distance supported by galvanized steel transmission towers that were modeled after windmill frames, and supplied by the Wind Engine and Pump Company of Batavia, Illinois. The towers are generally regarded as one of the first steel lattice transmission tower types in the U.S. The Kern River to Los Angeles Transmission Line conveyed volts over its 117 mile traverse, and terminated at EEC s pre-existing Steam & Transformer Plant No.
3 in Los Angeles, where the electricity was then distributed into Los Angeles via EEC s wood pole distribution system.50 The Kern River to Los Angeles Transmission Line was cited in an August 10, Electrical World article as one of the longest transmission lines operating on the North American continent. With its steel towers and specially designed insulators intended for a voltage capacity of the Kern River to Los Angeles Transmission Line with its associated Powerhouse typified the latest modern practice in hydroelectric power plant design. At the start of operation, the Kern River Hydroelectric Project was identified as the most permanent and costly hydraulic waterway in the country.
51 SCE Reincorporation, Mergers, Acquisitions, Expansion, and Innovation By the EEC provided electricity to over people throughout five counties. To reflect this expanded presence, the company was reincorporated as the Southern California Edison Company (SCE). In the first two decades of the Twentieth Century SCE continued to expand throughout the growing Southern California region. The company initiated construction of its Long Beach Steam Station in and implemented a new system of steel tower transmission lines to replace its previous network of wood pole lines. In SCE merged with Henry Huntington s Pacific Light & Power Corporation The merger was viewed as beneficial to both parties.
Huntington received about $12 million in Edison stock and SCE gained absolute control over all former holdings and future expansion efforts, including the Borel Powerhouse on the Kern River and associated Borel to Los Angeles Transmission Line, and the Big Creek Hydroelectric System. After the successful merger between SCE and the company focused its labors at expanding the Big Creek Hydroelectric 49 Frederick Hall Fowler. Hydroelectric Power Systems of California and Their Extension into Oregon and Nevada. Water-Supply Paper (Washington, Government Printing Office, 50 Kern River No. 1 Power Plant of Edison Electric Co., Los Angeles, Electrical World, Volume 50, August 10, 51 Kern River No.
1 Power Plant of Edison Electric Co., Los Angeles, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 18) System, initially in service in at a level of and upgraded to in By the year of the and SCE merger, fifty-six southern California communities were lit by SCE infrastructure. Of those fifty-six communities, twenty-two were initially serviced by infrastructure installed in the EEC period and thirty-four were serviced by SCE period infrastructure.
By an additional 153 communities were serviced by SCE resulting from the merger with Huntington s and the acquisition of the Mount Whitney Power and Electric Company.52 Into the late SCE continued to develop its Big Creek Hydroelectric System through the creation of dams and reservoirs, building of powerhouses, rail lines, and tunnels, as well as support camps replete with food and housing for workers, recreation and entertainment offerings, medical facilities, and administrative offices. Upgrades were completed at the existing east and west transmission lines, and additional transmission lines were installed to convey electricity from Big Creek to Los Angeles.
By when the initial Big Creek Hydroelectric system was completed, its capacity consistently generated more electrical power than any other systems in place at the time. The Big Creek system boasted many innovative engineering features, including the longest water tunnel in the world, the 243 mile Big Creek East & West Transmission Lines, the 224 mile Vincent Transmission Line, with all three lines spanning between the Big Creek generating facilities on the upper San Joaquin River and the Gould Substation in Los Angeles, the longest electrical transmission lines in the world at that time. Developing in a parallel path to these early and SCE projects were the hydroelectric facilities at Bishop Creek.
Built by a syndicate of investors under multiple successor corporations, including the Nevada Power, Mining and Milling Company (incorporated in the Nevada-California Power Company (incorporated in the Southern Sierras Power Company (incorporated in and the Nevada California Electric Corporation (incorporated in the Bishop Creek Hydroelectric System included multiple powerhouses, each with an associated residential complex for operators and maintenance crews, and a control station which served as the switching point for the collection and distribution of electricity from the system. In the Nevada California Power Company was renamed the California Electric Power Company. Several early long distance transmission records originated from Bishop Creek.
In a high voltage 118 mile power line was installed between Bishop Creek, Tonopah, Nevada and Goldfield, Nevada on two wood pole lines. 52 Myers, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 19) In a double-circuit transmission line was constructed on double- circuit lattice steel towers from Control Substation on Bishop Creek to the San Bernardino Substation (renamed Calectric) in San Bernardino, California for a total span of 239 miles.
The line was called the "Tower Line" because of the new off-the-shelf towers being used from the Milliken Brothers of New York, which had become the norm, as opposed to the wooden or metal poles, pole towers, or windmill poles as found in early lines like the Kern Los Angeles Transmission Line (built in In the Tower line was built between Bishop Creek and San Bernardino, California for a total span of 239 miles.53 On April 26, SCE entered into a contract with the U.S. Department of the Interior to generate electricity for itself and other investor owned electric utility companies, and to distribute that power to its southern California service territory.
The source of power, the Hoover Dam, was intended for construction, and SCE s contract, along with similar contracts in place between the United States government, the City of Los Angeles, and the Southern Sierra Power Company helped to guarantee the amortization of the project expenses over a fifty year period.54 The Boulder Dam to San Bernardino transmission line was energized in to initially convey power to the dam for construction purposes, and then was later reversed to carry electricity to San Bernardino when the dam was completed and in operation. Into the late in the post WWII period, additional SCE projects were undertaken at Big Creek to make improvements to existing powerhouses including the addition of new generators, and construction of new dams and powerhouses.
This later phase of construction continued through the The modern-period upgrade campaign at Big Creek was instrumental in responding to the increased electricity needs of Southern California resulting from post-war suburban expansion. In the California Electric Power Company and its holdings were acquired by SCE, including the Bishop Creek Hydroelectric System and its associated transmission lines. Today SCE maintains an electrical infrastructure comprised of individually constructed substations, transmission lines, and other electrical generation and distribution equipment supporting fourteen million customers over an approximate square mile service territory.
The SCE territory covers all or portions of Fresno, Inyo, Kern, Kings, Los Angeles, Madera, Mono, Orange, 53 Dorothea Theodoratus, Clinton M. Blount, Valerie H. Diamond, Stephen G. Helmich, and Robert A Hicks., Evaluation of the Historic Resources of the Bishop Creek Hydroelectric System (July 9. 54 Myers, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 20) Riverside, San Bernardino, San Diego, Santa Barbara, Tulare, and Ventura counties. Additionally, SCE owns facilities in eastern Arizona and Nevada that transmit electricity to southern California. 3.
Historical Innovations at Electrical Power Conveyance Systems A typical electrical conveyance system, also referred to as a power grid, consists of four components that deliver electricity to individual properties. Electrical power originates at the generating power plant (component one) housing a spinning electrical generator powered by a steam turbine, a diesel engine, a gas turbine, or water from a hydroelectric dam. The power is conveyed from the generator to a transmission substation (component two) that uses large transformers to intensify the original voltage to a higher level before distributing the electricity out through the grid.
High voltage transmission lines typically mounted to large steel towers (component three) carry electricity great distances to the power substation, also referred to as the step-down or sub-transmission station, wherein the high voltage is reduced and split for distribution via low- voltage power lines (component four) typically mounted to wooden poles. Electricity distributed via these low voltage lines carries power at anywhere from approximately volts sub-transmission) down to volts distribution) depending on the recipient customer type.
Although referred to as a static system , a power grid, including the grid that comprises SCE s present-day square-mile service territory, is constantly evolving and changing via expansion and upgrades to respond to energy demands, and through renewable interconnections to meet regulatory requirements for an environmentally sustainable ( greener ) grid. The grid is typically expanded in a piecemeal and incremental fashion with individual sub-transmission lines, distribution lines and substations installed separately as independently operating facilities to accommodate customer demand. Steam and hydroelectric plants were the first generating facilities built to create power.
In the mid-1700s the modern steam engine was developed, which made for significant industrial advancements, including in the electrical field. The first great hydroelectric developments in the U.S. occurred in the New England region where the textile industry rapidly expanded after small to horse- power facilities were installed on the Merrimac River in near present-day Lowell and Lawrence, Massachusetts, and near Manchester, New Hampshire.
Similar water-powered textile processing facilities opened on the Mohawk River at Cohoes, New York in and the Androscoggin River at Lewiston, Maine in The world s first hydroelectric power plant was put in-service in on LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 21) the Fox River in Appleton, Wisconsin.55 Seven years later, in the first alternate-current hydroelectric plant was installed in the U.S. at Oregon City, Oregon.
Built by the Willamette Falls Electric Company, the facility consisted of two 300 horse-power Victor wheels belted to 4,000-volt single-phase generators, and carried power thirteen miles to nearby Portland, Oregon.56 As an electrical infrastructure property type, overhead transmission lines, in some form, were erected as early as when European experiments were conducted to transmit electrical current from a machine working as a generator to a second machine about 550 yards distant working as a motor drive pump.
In San Bernardino Light & Power Company constructed a 5kV transmission line that spanned 28 miles from its powerhouse at Pomona to San Bernardino; the next year the voltage doubled to Also in in Frankfurt, Germany the first alternating current (ac) transmission line was installed along a 108 mile span. The Frankfurt line is cited as having operated at between and 33 kV. In in Riverside, the first commercial three-phase ac transmission line was installed along a twenty-three mile span from Riverside to Mill Creek at an operating capacity of 10 kV. By the common voltage capacity of transmission lines was reported to be volts which was considered the minimum voltage necessary for lighting plants in major U.S.
cities.57 Significant technological advancements occurred in the carrying capacity of transmission lines at voltages above in with the introduction of high-tension transmission lines and development of suspension type insulators that allowed for higher voltage currents to flow through the lines. According to the Edison Electric Institute: With dramatic suddenness the invention of the suspension type insulator made possible higher voltages for transmission lines.
In in Michigan on a short line it was found that by the use of the [suspension] type of insulators transmission of volt, 3-phase current was entirely feasible.58 The General Electric Company reported voltage capacities from to The reported voltage levels provide a threshold for determining significant technological innovations in voltage capacity of transmission lines. Based on the voltage capacities reported by the General Electric Company, by approximately voltages were upwards of by voltages were reported at 55 David B. Rushmore and Eric A. Lof, Hydro-Electric Power Stations (New York: John Wiley & Sons, Inc., 4. 56 Rushmore and Lof, 7.
57 Rushmore and Lof, 58 Rushmore and Lof, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 22) and by voltage capacities increased to Between approximately and transmission line capacities reportedly increased to However, most transmission line operators in California were not installing facilities at what was then considered high-voltages until the early The San Bernardino Light and Power Company constructed early high-voltage transmission lines spanning between Pomona and San Bernardino over twenty-eight miles in the San Antonio Light and Power Company constructed the Mill Creek line to Riverside over forty-two miles in and at the Folsom Hydroelectric Project over twenty-two miles in In EEC introduced a new high-voltage electric power conveyance system with its Santa Ana No.
1 Transmission Line that spanned eighty-two miles over wooden poles at a capacity of to the EEC s Los Angeles 2nd St. Substation. The lattice steel transmission tower is the most enduring electric power support structure, and is still employed today in various sizes and forms for transmission and sub-transmission lines throughout the country. Predecessor forms of the modern-day lattice steel tower were first executed in the design of windmills. Similar structures were later erected for use in electric trolley systems, telegraph, and telephone lines. From the mid-to-late-nineteenth century forward iron and then steel lattice construction was utilized for electrical transmission and distribution lines.
Prior to the use of iron and steel structures, early electrical transmission lines built in the U.S. conveyed low voltages and were supported by wooden poles. As voltage capacity increased and transmission spans were lengthened, utility providers recognized the need to install stronger support structures to carry the increased weight load for heavier wires, multiple circuits, larger insulators, and associated structure-bracing components. By the use of iron and steel poles in the construction of overhead transmission circuits was considered common, having been made of successive lengths of wrought-iron pipe shrunk together at the joints, or of some of the various forms of structural iron.
59 The three typical designs employed were the Lattice Pole, Tubular Steel Pole, and Iron Pipe Pole, with the Iron Pipe Pole cited as the earliest type introduced to the market and most preferred due to the flexibility in the pipe-pole specifications with respect to desired weight and strength.60 The use of iron was preferred over wood because of the material s durability; however, iron structures also served as excellent conductors, thus attracting lightning and the opportunity for damage to the wires and connecting 59 Arthur Vaughan Abbott. The Electrical Transmission of Energy: A Manual for the Design of Electrical Circuits (New York: D. Van Nostrand Company, 93.
60 Abbott, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 23) systems reliant on the electricity within. At the turn of the century, a shift in structure typology occurred as signaled by use of the word tower rather than pole in some electrical engineering periodicals of the day. Simultaneously occurring was the change in material from iron to steel. According to Frank Koester in his Engineering Magazine article entitled A General Review of Hydroelectric-Engineering Practice The transmission tower used most extensively in America up to the present time is the four-legged tower made of four angle-iron legs, braced with angle irons or flat bars, diagonal bracing being frequently made of rods.
The arms for carrying the insulators may be of structural steel or wood.61 Koester s findings were supplemented in the publication Transmission Line Construction, Methods, and Cost, wherein the use of steel in the construction of transmission lines was cited as resulting in overall lower labor costs per mile for most higher-voltage and some lower-voltage lines.62 Referring to common structure types employed in the U.S. and Europe, Lundquist cites the latticed- riveted type as the most common, which appears to have been a slim version of a steel lattice tower comprising less ground area. The latticed-riveted type of pole structure is probably the one that has been used to the greatest extent, particularly abroad.
It is ordinarily built up of four main angle-iron corner members, laced with angle iron or flat bars, the whole being assembled and riveted in the shop in one piece for ordinary lengths, and in two or more sections for the field splicing of high poles. The section usually is square with a uniform taper from top to bottom, as may be demanded by conditions of loading. In ordinary work single lacing is ample. The cross-arms are generally of steel although wooden arms have sometimes been used. While latticed riveted poles have not been used so widely in the U.S. as in Europe, there are a few good examples of this kind of construction in this country.
Among them are the New York Central & Hudson River Railroad s electric zone, the Long Island Railroad, and the Sanitary District lines, with many isolated cases where short stretches of line have been built with latticed poles.63 Wind engine companies that designed and built windmills were the first manufacturers of steel lattice transmission towers, as windmills proved to be a 61 Frank Koester. A General Review of Hydroelectric-Engineering Practice, The Engineering Magazine XXXIX, no.
4 (July 62 Ruben Alvin Lundquist, Transmission Line Construction: Methods and Cost (New York: McGraw-Hill Book Company, 63 Lundquist, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 24) logical structure type for modification and conversion as an electrical transmission tower. The movement towards standardization of utilitarian and industrial structures is summarized below in Charles R. Harte s May Electric Railway Journal article Virtues and Limitations of Steel Supports in Overhead Construction. We Owe Something to the Windmill Tower While in the past there have been designs without end, there is to-day a tendency toward standardization.
The steel towers first used were straightaway windmill towers, including the operating platform at the top. The platform long ago disappeared, but the general design, with light angle legs and long and lighter braces, still persists and the towers give good service too. Breakdowns, due to failure of the designers to recognize the limitations of the type, led to the development of a more rugged design.
In this heavy angle legs were designed to carry all the stress, whereas in towers of the very light type it was expected that every member would take a share of the load.64 Throughout the first half of the twentieth century utility providers designed larger, sturdier tower types to accommodate increasing voltage capacities, the weight of thicker and heavier wires, glass and porcelain insulators, and increased spans between tower locations. Into the early modern period, high voltage towers nearly doubled in size reaching heights of 200 as observed at the towers of the Boulder Dam to Los Angeles Transmission Line built by the Los Angeles Department of Water and Power. In the massive towers were erected to support lines running transmission.
The earliest identified lattice steel towers employed in the existing SCE System were installed for the Kern River-Los Angeles Transmission Line in The towers were designed by engineer James A. Lighthipe, and consisted of modifying windmills. The U.S. Wind Engine & Pump Company located in Batavia, Illinois manufactured the steel towers comprising the line.65 The towers were slender in profile, featuring four steel poles connected with steel cross bracing. SCE soon implemented additional all-steel lattice tower lines throughout its network. The Santa Ana to Los Angeles 66 kV Transmission Line was rebuilt in with Kern-style windmill towers and single-circuit lattice towers. The use of double-circuit towers within SCE s volt system was 64 Charles R.
Harte, Virtues and Limitations of Steel Supports in Overhead Construction, Electric Railway Journal 51, no. 20 (May 18, 65 Wind Engines, Illinois Windmills: Dedicated to the History, Preservation and Continuing Story of Windmills in Illinois, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 25) common-place by and likely coincides with the completion of the company s Long Beach Steam Station which provided for increased voltage capacities and a system upgrade from wood pole lines, to steel lattice tower lines.66 The Long Beach-Colton Transmission Line was constructed on double-circuit towers in The was using double-circuit towers for in with their construction of the Bishop Tower Line.
This line was referred to as the Tower Line due to the use of off the shelf technology that had become common place throughout the U.S. and Canada. In the same year that the Bishop Tower Line was put-in-service, the Big Creek Hydroelectric System East & West Transmission Lines were installed and energized at to span from Big Creek to the Eagle Rock Substation in Los Angeles. The Big Creek tower types are recognized as the next step in design and engineering within the SCE system history, single circuit lattice steel towers generally standing 41' in height with cross arms measuring wide, and engineered to sustain the load of an average span of between towers in favorable weather conditions and topography.
Ten years later under the ownership of SCE, in the Big Creek East & West Transmission Lines were upgraded to and the towers were modified with base extensions to respond to the sagging weight of the heavier wires. Taking a cue from the Big Creek base extensions, SCE engineers sought to design a larger Big Creek tower model for the next major transmission line built from Big Creek in the upgrade campaign. The new Vincent Transmission Line featured towers similar in appearance to the old Big Creek towers, but with additional height and subsequent cross-bracing to help support the structural load of the wire spanning along the 224 mile span from Big Creek to the Gould Substation in present-day La Canada Flintridge.
The upgrade campaign resulted in the creation of the Eagle Rock to Laguna Bell Transmission Line, a new tap line that extended the Big Creek span from the Eagle Rock Substation north to the Gould Substation and then southerly to the Laguna Bell Substation which conveyed power to and from the old Long Beach Steam Station. These major lines served as the backbone of the SCE system connected to SCE s two major generating facilities in place at the time, the Big Creek Hydroelectric System and the Long Beach Steam Station.67 66 Myers, 49. 67 A.A. Kroneberg, O.R. Bulkley, and W.A. Andree, Switching at Long Beach Plant No.
3, Electrical World (December LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 26) By the early the Long Beach Steam Station had been expanded to include three separate plants within the complex: Plant No. 1 was put-in service in Plant No. 2 was put in-service in and Plant No. 3 was put in-service in By the Long Beach Steam Station s steam generating capacity was At Big Creek, the northern end of the system, the hydroelectric capacity totaled Nine substations were built to step down and transmit the voltage at levels connected the system.
These substations along with the Big Creek East & West, Vincent, and Eagle Rock to Laguna Bell transmission lines define the historic system and are identified as the Lighthipe, La Fresa, Laguna Bell, Eagle Rock, Gould, Saugus, Magunden, Vestal, and Rector substations.68 The development of SCE s system to connect the Long Beach Steam Station system to the Big Creek Hydroelectric System resulted in the development of double- circuit towers and multi-circuit towers ranging from four-circuit to more than twelve-circuit towers within the SCE system. By SCE s principal sources of hydroelectric generation were Big Creek and the Hoover (Boulder) Dam.
Constructed by the the Boulder Dam to San Bernardino Sub-transmission Line was installed in to transmit electricity from Los Angeles to Boulder City in support of the Boulder Dam construction campaign. The flow of electricity was reversed upon completion of the dam project. Additionally SCE built three single-circuit transmission lines commonly referred to as the First, Second, and Third Boulder Lines. Put in- service in the First Boulder Line is historically identified as the North Boulder-Chino Transmission Line. Put in-service in November of the Second Boulder Line is historically identified as the South Boulder-Chino Transmission Line. The Third Boulder Line is historically identified as Chino-Hayfield Transmission Line.
The hydroelectric power from the Boulder Dam necessitated the construction of bulk power stations to accommodate and lines and control houses, and to also serve as sub- dispatching offices or switching centers, or headquarters for territorial maintenance and test crews.69 By SCE s system was comprised of miles of transmission line and 25 substations. The system was bolstered in through the installation of extra high-voltage circuits intended to create more effective interconnections with other power companies for power pooling. The company 68 Kroneberg, Bulkley, and Andree, 69 O.R.
Bulkley, Design Features of Bulk Power Stations on the Southern California Edison Company System Electrical World (December LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 27) was planning for the interconnection between the SCE and Pacific Gas & Electric Company (PG&E) system as part of the Pacific Northwest-Southwest intertie, for which the initial connection consisted of a 114 mile line between the PG&E Midway substation (approximately 30 miles west of Bakersfield) and the SCE Vincent substation (approximately 30 miles north of Los Angeles).
A second line was installed between the Vincent substation and the SCE Lugo substation near Hesperia, California.70 These two lines, Midway-Vincent and Lugo-Vincent are the first transmission lines put in service in the SCE system, and reflect the next phase of innovation in transmission design and technology and voltage capacity. From the forward SCE s steel lattice towers increased in size to correspond to increased loads at the new lines. These oversized steel lattice transmission towers typically featured a cinched waist massing with a wide base, narrow mid-point, and extended horizontal cross arms. Insulators, constructed of porcelain, were of larger size.
As an alternative to towers, SCE continued to utilize Tubular Steel Poles where engineering or site constraints required, and in urbanized areas with view shed or other environmental concerns. 4. Long Beach Steam Station and Transmission Lines Historic Context As stated above, SCE initiated construction of its Long Beach Steam Station in and implemented a new system of steel tower transmission lines to replace its previous network of wood pole lines. In two double-circuit transmission lines were constructed to connect Long Beach Steam Plant No. 1 to the existing SCE system. The lines consisted of the Long Beach-Colton and the Long Beach-Newmark Transmission Lines. By the late the Long Beach Steam Station had been expanded to include three separate plants within the complex: Plant No.
1 as put-in service in Plant No. 2 was put in-service in and Plant No. 3 was put in-service in The Long Beach-Laguna Bell and Transmission Lines were critical components of SCE s electrical grid in the as described by SCE Engineers in November 3, in Electrical Engineering. The system of the Southern California Edison Company consists essentially of a backbone. This backbone, composed of three transmission lines, extends from the Big Creek hydroelectric development in Central California to the load center of the company with the Long Beach 70 Paul R. Dolan and A.J.
Peat, Design of the First Substations on the Southern California Edison Company System, Electrical World (May LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 28) Steam Station at the south end of the lines. Hydroelectric capacity totaling kW is located at Big Creek and kW of steam generating capacity is tied directly to the transmission lines at Long Beach. Seven substations are located along the backbone with transformers stepping voltage down to which is the sub-transmission voltage used on radial feeders from the major stations. Some kW of stream flow hydroelectric capacity is scattered over the system and tied to the lower voltage networks. The Long Beach Steam Station installation is composed of three plants. Plant No.
1 was started in and has six units ranging from to kW, and a total capacity of kW. The generators are operated in parallel on an bus and three transformer banks are used for interconnection with the busses of plant No. 2. Plant No. 2 was started in has two units of kW and one rated kW for a total capacity of kW. The generators in this more modern plant are operated as units with their transformers to a bus. Plant No. 3 was started in and is at the present time composed of 2 generators, wound for volts and connected as units with their transformers. These two units are operating in parallel on a bus. The original lines out of Big Creek were constructed in at and transmitted power to the Eagle Rock Substation in Los Angeles.
Ten years later the Big Creek lines were upgraded to and SCE began an upgrade campaign to increase its system to A new line was constructed from the Eagle Rock to Laguna Bell substation. This new tap line extended the Big Creek lines from the Eagle Rock substation north to the Gould Substation and then southerly to the Laguna Bell substation. The construction of the Long Beach-Laguna Bell and Transmission Lines in transmitted power from the Long Beach Steam Plants No. 1, No. 2 and No.3. These lines pass through the Lighthipe Substation and continue onto the Laguna Bell Substation located approximately seventeen miles north of the Long Beach Steam Station.
The construction of these lines included the crossing of the Cerritos Channel with two tall multiple-circuit lattice steel towers on either side of the channel, holding six circuits each; and a tall double- circuit lattice steel tower on either side of the channel, holding two circuits. Starting at the forth span of towers, the lines are located on one twelve-to-fourteen-circuit tower constructed on three legs with two 55' bridges or a single six-circuit tower constructed on two legs with a 55' bridge; both types LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 29) stand approximately 94' tall (SCE No. In addition, these towers were constructed with ladders and stairs to allow for easier climbing of the towers.
While these towers resulted in the addition of significantly taller towers and new designs for multi-circuit towers supporting six to fourteen circuits within the SCE system, they were not the tallest towers or only multi-circuit towers at the time of construction. The original lines from Long Beach Plant No. 1 to the Colton and Newmark substations were relocated onto new lattice towers in when Plant No. 2 was brought on-line forming the first, Long Beach-Lighthipe-Laguna Bell Transmission Line. North of Laguna Bell Substation the Newmark Line still retains some original structures along with additional poles added and/or replaced over the years. The Colton to Long Beach Line also retains some original structures at the eastern end of the line near Colton Substation.
In the current towers were constructed to raise the line approximately and the structures were removed. In addition, the towers were constructed to transmit power from Plant No. 3. Since, then both Plants No. 1 and 2 have been removed, but the tower configuration remains the same out of Long Beach. LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 30) Part II. Structural/Design Information A. General Statement 1. Character: The Long Beach-Laguna Bell and Transmission Lines were initially planned and constructed (put in-service) in by SCE to build out the backbone of the SCE system by connecting the Long Beach Steam Station and the Big Creek Hydroelectric System.
This was a significant event in the development of SCE s electrical system because it was an important technical achievement that improved the effectiveness of SCE power grid in the southern California region. SCE has established a period of significance (POS) for high and extra high voltage technology up to The POS by voltage for SCE transmission lines is as follows: and below, to 41. The Long Beach-Laguna Bell and Transmission Lines represent the construction of and transmission lines within the POS of the corresponding voltage. 2. Condition of fabric: The subject structure is in good condition. B. Description The Long Beach-Laguna Bell and Transmission Lines initiate at the Long Beach Steam Station, ties into the Lighthipe Substation, and terminate at the Laguna Bell Substation.
From Long Beach Steam Station to Lighthipe Substation the and lines parallel each other for a distance of miles and are constructed in a right-of-way. The right-of-way width provided for a second double-circuit line on the western edge that was never constructed. The existing is stationed west of the line. From Lighthipe Substation to Laguna Bell Substation, portions of the and lines were constructed in separate rights-of-way on the southern portion of the lines, and then paralleled each other in the same right-of-way, before entering the Laguna Bell Substation. Transmission Line The line from Long Beach-Lighthipe is a three-phase double-circuit line, constructed on lattice steel towers. Spans vary from to with a normal span of There are on average six towers per mile.
Seven types of towers were used to construct the line, including: two single-circuit Take-Off Towers; two Channel Crossing Towers; one Special Standard Tower; one 90-Degree (Special) Anchor Tower, forty Standard Suspension Towers; eight 45-Degree Anchor Towers; and two Transposition Anchor Towers, totaling fifty-five towers. Tower extensions are 15' LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 31) and 30' high both of these heights are used on Standard Towers. The conductor is circular mil with a maximum tension of pounds. Take-Off Tower (SCE Drawing No.
Two take-off towers are located in switchyard and are designed to raise the conductors high in preparation of crossing the Cerritos Channel with a maximum tower height of These structures are constructed as a modified H-frame lattice steel tower with two stabilizer legs on either side of the H-frame. The H-frame structure stands The top bridge of the H-frame measures x x 7'- 0". The two obelisk legs of the H-frame at the top bridge are x and extended down to a center bridge and widen to measure x The base of the H-Frame legs measures x with the bases separated by The center bridge is located at100'-0" and measures high x across. The two stabilizer legs stand high and extend wide on either side of the H-frame.
The base of these legs measures x The total length of the base of the structure from the outer edge of each stabilizer leg is Channel Crossing Tower (SCE Drawing Nos. and A channel crossing tower is located on either side of the Cerritos Channel and has a maximum height of These structures are lattice steel towers with a single obelisk center. Three bridges span the top of the towers and hold the 3-phase conductor of each line on either side of the tower. The base of the tower has four legs and measures x at the base, and extends in height. Atop the base is the main body of the tower, which extends to the first bridge. Each bridge measures a total of wide, with the center section of the bridge measuring and two spans on either side.
Each center section of the bridge measure in height and is separated by another level. The bridges begin at a height of and extend to the top of the tower at The channel crossing towers are equipped with stairs and ladders to climb the tower, as well as walkways on each bridge. All channel tower insulators are configured as dead-ends. Special Standard Tower (SCE Drawing Nos. and A single Special Standard Tower is located north of the channel towers and has a maximum height of The structure is a lattice steel tower with a single obelisk center. Three bridges span the top of the tower and hold the 3-phase conductor of each line on either side of the tower.
The base of the tower has four legs and measures x The main body of the tower extends from the footings to a platform, and then extends another to the first bridge. Each bridge LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 32) measures wide, with the body of the tower measuring not including two spans on either side. The bridges measure in height and are separated by an additional The bridges begin at and extend to the top of the tower at The tower is equipped with ladders to climb the tower and a platform below the bridges. The tower is configured with suspended insulators. Standard Suspension Tower (SCE Drawing Nos.
E4529, and The standard suspension tower is the most common type of tower on the line and has a height of These structures are lattice steel towers with a single obelisk center. Three bridges span the top of the towers and hold the three-phase conductor of each line on either side of the tower. The base of the tower has four legs and measures x The main body of the tower extends from the footings to the first bridge located at to the waist of the tower which measures wide. Each bridge measures wide, the center of the tower measuring with two spans on either side. Each center section of the bridge measures in height. Each bridge is separated by to allow for space between conductors and insulators.
The bridges begin at and extend to the top of the tower at These towers are equipped with ladders to climb the tower. A extension can be installed on these towers. 45-Degree Anchor Tower (SCE Drawing No. E4705) The 45-degree anchor tower has a height of These structures are lattice steel towers with a single obelisk center. Three bridges span the top of the towers and hold the three-phase conductor of each line on either side of the tower. The base of the tower has four legs and measures x The main body of the tower extends " from the footings to the first bridge located at to the waist of the tower which measures wide. Each bridge measures wide, the center of the tower measuring with two spans on either side. Each center section of the bridge measures in height.
The bridges are separated by 0" to allow for space between conductors and insulators. The bridges begin at and extend to the top of the tower at These towers are equipped with ladders to climb the tower. A extension can be installed on these towers. All anchor towers insulators are configured as dead-ends. Transposition Tower (SCE Drawing Nos. and The transposition towers are 45-degree anchor towers with additional hardware installed on the bridges to transpose the two circuits. LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 33) 90-Degree (Special) Anchor Tower (SCE Drawing No. The 90-degree anchor towers have a height of These structures are lattice steel towers with a single obelisk center.
Three bridges span the top of the towers and hold the 3-phase conductor of each line on either side of the tower. The base of the tower has four legs and measures x The main body of the tower extends from the footings to the first bridge located at to the waist of the tower which measures wide. Each bridge measures wide, the center of the tower measuring with two spans on either side. Each center section of the bridge measure in height. Each bridge is separated by to allow for space between conductors and insulators. The bridges begin at and extend to the top of the tower at These towers are equipped with ladders to climb the tower. All anchor towers insulators are configured as dead-ends.
Transmission Line The line from Long Beach-Lighthipe is a three phase multi-circuit line, constructed on lattice steel towers. Spans vary from to with a normal span of and there is an average of six towers per mile. Seven types of towers were used to construct the line and include: two multi-circuit take-off towers, two multi- circuit anchor channel towers, two multi-circuit special standard towers, nine double multi-circuit towers, three 0-degree anchor double multi-circuit towers, one 45-degree anchor double multi-circuit tower, thirty-two single multi-circuit towers, three 45- degree anchor single multi-circuit tower, two 0-degree anchor single multi-circuit tower, and one 90-degree anchor single multi-circuit tower, totaling fifty-seven towers.
Five multi-circuit suspension towers and three 45-degree multi-circuit anchor towers are located between Lighthipe and Laguna Bell. Tower extensions are 15' and 30' high. Both of these heights are used on standard and anchor towers. The conductor s cross section measures circular mils (a unit of area measurement that equals a circle in diameter) with a maximum tension of pounds. Take-Off Tower and Channel Crossing Tower (SCE Drawing Nos. and The Take-Off Towers and Channel Crossing Towers are constructed in the same engineering design. Moreover, the base and main body of theses towers are the same engineering design as the Channel Crossing Towers, although the bridge configuration is of a different design, which holds six circuits.
The towers have a maximum height of These structures are lattice steel towers with a single obelisk center. Three bridges span the top of the towers, which hold the three-phase conductor of each line. Three circuits are located on each side of the LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 34) tower. The base of the tower has four legs and measures x at the base, and extends in height. Atop the base is the main body of the tower, which extends to the first bridge. Each base of a bridge measures a total of wide, with the center section of the tower measuring10'-0", and one " and two spans on each side. Each center section of the bridge measures in height with no additional separation.
The bridges begin at a height of and extend to the top of the tower at The top of the tower expands an additional on either side of the body of the tower, totaling across the top platform. The channel crossing towers are equipped with stairs and ladders to climb the tower, as well as walkways on each bridge. All channel tower insulators are configured as dead-ends. Special Standard Tower (SCE Drawing Nos. and Two special standard sowers are located north of the channel towers and have a maximum height of This structure is a lattice steel tower with a single obelisk center. Three bridges span the top of the tower and hold the three-phase conductor of three lines on either side of the tower.
The base of the tower has four legs and measures x The main body of the tower extends vertically126'- 0" from the footings to a platform, then extends another to the first bridge. Each bridge measures high x ". These towers are equipped with ladders to climb the tower and a platform below the bridges. This tower is configured with suspended insulators. Multi-Circuit Suspension Tower (SCE Drawing No. E4051) The multi-circuit suspension towers have a height of These structures are lattice steel towers with a two obelisk towers at either end of a rectangular bridge capable of holding six three-phase circuits. The rectangular bridge measures in height x across. A second parallel bridge and third tower can be added to support an additional six circuits.
In addition, bridge wings can be added to either a six or twelve circuit structure to the otter towers to add an additional two circuits. The base of each tower has four legs and measures x The main body of each tower stands tall. A base can be added. These towers are equipped with ladders to climb the tower. All anchor towers insulators are configured as dead-ends. Multi-Circuit 0-Degree Anchor Tower (SCE Drawing No. E4055) The multi-circuit 0-degree anchor towers have a height of These structures are lattice steel towers with a two obelisk towers at either end of a rectangular bridge capable of holding six three-phase circuits. The rectangular bridge LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 35) measures in height x across.
A second parallel bridge and third tower can be added to support an additional six circuits. In addition, bridge wings can be added to either a six- or twelve-circuit structure to add an additional two circuits. The base of each tower has four legs and measures x The main body of each tower stands A base can be added. These towers are equipped with ladders to climb the tower. All anchor towers insulators are configured as dead-ends. Multi-Circuit 45-Degree Anchor Tower (SCE Drawing No. E4136) The multi-circuit 45-degree anchor towers have a height of These structures are lattice steel towers with a two obelisk towers at either end of a rectangular bridge capable of holding six, 3-phase circuits. The rectangular bridge measures in height x across.
A second parallel bridge and third tower can be added to support an additional six circuits. In addition, bridge wings can be added to either a six or twelve circuit structure to the otter towers to add an additional two circuits. The base of each tower has four legs and measures x The main body of each tower stands A base can be added. These towers are equipped with ladders to climb the tower. All anchor towers insulators are configured as dead-ends. Multi-Circuit 90-Degree Anchor Tower (SCE Drawing No. E4056) The multi-circuit 90-degree anchor towers have a height of These structures are lattice steel towers with a two obelisk towers at either end of a rectangular bridge capable of holding six three-phase circuits. The rectangular bridge measures in height x across.
A second parallel bridge and third tower can be added to support an additional six circuits. In addition, bridge wings can be added to either a six or twelve circuit structure to add an additional two circuits. The base of each tower has four legs and measures x The main body of each tower stands A base can be added. These towers are equipped with ladders to climb the tower. All anchor towers insulators are configured as dead-ends. C. Mechanicals/Operation The Long Beach-Laguna Bell Transmission Lines transmit electricity at and from the Long Beach Steam Station to the Lighthipe and Laguna Bell Substations. Electrical power is transmitted to the aforementioned substations so that it can be stepped down to lower voltages for consumer and industrial uses.
The transmission towers carry the lines above ground level. Notably, the anchor towers on the immediate north and south of Cerritos Channel suspend the lines above this active waterway connecting the ports of Long Beach and Los Angeles. LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 36) D. Site Information Generally, the subject structure is situated on flat terrain and runs through industrialized sections on the western side of the City of Long Beach. The lines begin on the east side of Terminal Island, at the Long Beach Steam Station, in an industrialized section of the Port of Long Beach. As the lines run north, they cross Cerritos Channel, an artificially widened section of the former Cerritos Slough.
The lines continue to run north over the generally flat terrain of an industrialized, inland section of the port district. North of Anaheim Street, the lines continue north, following the west side of California North of East Sepulveda Boulevard, the lines follow a northwestern course to the junction of I-710 and I-405. From there, the lines run north between I-710 to the west and the Los Angeles River to the east. The line then crosses over just east of the interchange with I-90. Northeast of the cloverleaf, the right-of-way makes a 90 degree turn east, crosses again over the Los Angeles River, heads through a generally residential area, and connects with the Lighthipe Substation.
From there, the lines northerly course runs just east of I-710, traversing urbanized areas of the communities of Paramount, South Gate, and Bell Gardens. The lines terminate at the Laguna Bell Substation. LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 37) Part III. Sources of Information A. Primary Sources Abbot, Arthur Vaughan. The Electrical Transmission of Energy: A Manual for the Design of Electrical Circuits. New York: D. Van Nostrand Company, Andree, Operating Interconnected Hydro Plants for Best Economy. Electrical World 79, no. 19 (May 13, Bulkley, O.R.
"Design Features of Bulk Power Stations on the Southern California Edison Company System." Transactions of the American Institute of Electrical Engineers, Power Apparatus and Systems, Part III, 78, no.4 (December California State University, Chico. Miriam Library Special Collections. Historic United States Geological Survey (USGS) Topographic Map Collection. Carlson, Michener. "The Vincent Transmission Line Engineering and Construction Features." Transactions of the American Institute of Electrical Engineers XLV (January "The Vincent Transmission Line: Engineering and Construction Features." Journal of the A.I.E.E. 45, no.12 (December City of Los Angeles Public Library and Historic Photograph Collection. Dennis, Harry W.
Volt Steel Tower line Construction of Southern California Edison Company. Ithaca, NY: Cornell University, Dolan, and A.J. Peat. "Design of the First Substations on the Southern California Edison Company System." IEEE Transactions on Power Apparatus and Systems PAS-86, no.5 (May Fowler, Fredrick Hall. US Geological Survey, Water Supply Paper Hydroelectric Power Systems of California and Their Extensions into Oregon and Nevada. Washington U.S. Government Printing Office, Gelpke, Viktor and Aaron Howell Van Cleve. Hydraulic Turbines, Their Design and Installation. New York: McGraw-Hill Book Company, Harte, Charles R. Virtues and Limitations of Steel Supports in Overhead Construction. Electric Railway Journal. 51 no. 20 (May 18, Huntington Library Southern California Edison Records Collection.
LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 38) Kern River No. 1 Power Plant of the Edison Electric Company, Los Angeles I. Electrical World 50 no. 6 (August 10, Kern River No. 1 Power Plant of the Edison Electric Company, Los Angeles II. Electrical World 50 no. 7 (August 17, Kern River No. 1 Power Plant of the Edison Electric Company, Los Angeles III. Electrical World 50 no. 8 (August 24, Kern River No. 1 Power Plant of the Edison Electric Company, Los Angeles IV. Electrical World 50 no. 9 (August 31, Kern River No. 1 Power Plant of the Edison Electric Company, Los Angles, Abstracted from the Electrical World of August 10, 17, 24, and 31, Development and Electrical Distribution of Waterpower Koester, Frank.
A General Review of Hydroelectric Engineering Practice. The Engineering Magazine XXXIX no. 4 Kroneberg, A.A., O.R. Bulkley, and W.A. Andree. "Switching at Long Beach Plant No. 3." Transactions of the American Institute of Electrical Engineers 53, no.12 (Dec. Los Angeles Times, Long Beach Independent, Lundquist, Ruben Alvin. Transmission Line Construction: Methods and Cost. New York: McGraw-Hill Book Company, Michener, Harold.
"High-Voltage Switches, Bushings, Lightning Arresters Experiences of the Southern California Edison Company on Its and 220,000-Volt System," Transactions of the American Institute of Electrical Engineers XLII (January Moore, Interconnection Reduces Steam Reserve Necessary, Benefits Which Have Been Realized by Tying Together Power Systems in Central California Improvement of Diversity Factor and Pooling of Water Power Resources Have Proved of Great Advantage. Electrical World 73 no. 17 (April 5, Pfau, Arnold. Kern River Development of the Edison Electric Company. Industrial Progress 2 no.12 (December Rushmore, David B. and Eric A. Lof. Hydro-Electric Power Stations.
London: John Wiley & Sons, LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 39) Southern California Edison Company. Corporate Drawing Management, Innovation Village Archive. Hummingbird Digital Archive. Engineering Data Sheets, Maps, Plans, and Drawings. Southern California Edison, Los Angeles, CA. Walker s Manual of Western Corporations.1916, no. 8 (June The Transmission of Electrical Energy in Southern California. Electrical World LIV no. 18 (October 28, University of California, Berkeley. Earth Sciences & Map Library. California 30- and 60-Minute Historic USGS Topographic Maps. University of California, Santa Barbara. Davidson Library Map & Imagery Lab. Historic USGS Topographic Maps. University of Southern California.
Special Collections. Digital Photograph Collection. B. Secondary Sources Brigham, Jay L. Empowering the West: Electrical Politics Before Lawrence: University of Kansas Press, Cultural Affairs Department. Cultural Heritage Board. Request for Historic Cultural Monument Declaration: Edison Electric Company Los Angeles No. 3 Steam Power Plant. Oct. 21, Edison International. Developing Hydroelectric Facilities on the Kaweah River A Look Back: Our History. us/our-history.html#27764. Electric Streetlights for the City of Pomona A Look Back: Our History. Hydroelectric Power & the Santa Ana River A Look Back: Our History. Hydroelectric Power near Riverside, Calif. A Look Back: Our History Irrigating Orange Groves with the Help of Electric Pumps A Look Back: Our History. history.html#27764.
LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 40) Introducing Three-Phase Alternating Current Generation A Look Back: Our History. history.html#27764. Our motto: Good Service, Square Dealing, and Courteous Treatment A Look Back: Our History. us/our-history.html#27764. Steam-powered Street Lights in Pasadena, Calif. A Look Back: Our History. Draft Programmatic Agreement Among the Bureau of Land Management, the Southern California Edison Company, the California State Historic Preservation Officer, and the Nevada State Historic Preservation Officer Regarding the Management of Historic Electric Power Conveyance Systems in the States of California and Nevada, September 27, Gumprecht, Blake.
The Los Angeles River: Its Life, Death, and Possible Rebirth. Baltimore: The Johns Hopkins University Press, Hoyt, Franklin. Influence of the Railroads in the Development of Los Angeles Harbor. The Historical Society of Southern California Quarterly 35, no. 3 (September Myers, William A. Iron Men and Copper Wires: A Centennial History of the Southern California Edison Company. 2nd ed. Glendale: Trans-Anglo Books, Nichols, Richard S. The First Electric Power Transmission Line in North America Oregon City, Oregon. IEEE Industry Applications Magazine. 9, no. 4 (July/August Nielsen, Michele and Jennifer Reynolds. Moments in Time 150 Years in San Bernardino County. San Bernardino: San Bernardino County Museum Quarterly, Nye, David E.
Electrifying America; Social Meanings of a New Technology, Cambridge: The MIT Press, Passer, Harold C. The Electrical Manufacturers, A Study in Competition, Entrepreneurship, Technical Change, and Economic Growth. Cambridge: Harvard University Press, Procter and Gamble Celebrates 50 Years in Harbor, Port of Long Beach Harbor Highlights 5, no. 1 (Fall LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 41) Redinger, David H. The Story of Big Creek. Revised ed. Tucson, Arizona: Ironwood Press, Sapphos Environmental, Inc. City of Long Beach Historic Context Statement. Prepared for the City of Long Beach, Smongesky, Peter P. Introduction to Port of Long Beach Chronological History. In C. F.
Connors, ed., Chronological History By Pier: Theodoratus, Dorothea, Clinton M. Blount, Valerie H. Diamond, Stephen G. Helmich, and Robert A., Evaluation of the Historic Resources of the Bishop Creek Hydroelectric System. July U.S. Department of Labor. Occupational Safety & Health Administration. Electric Power Generation Illustrated U.S. Nuclear Regulatory Commission. Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437 Vol. 1). Viehe, Fred W. The Social-Spatial Distribution in the Black Gold Suburbs of Los Angeles, Southern California Quarterly 73, no. 1 (Spring Weinman, Lois J. Los Angeles-Long Beach Harbor Areas Regional Cultural History, Los Angeles County, California.
Springfield, Virginia: National Technical Information Service, Wind Engines Illinois Windmills: Dedicated to the History, Preservation and Continuing Story of Windmills in Illinois. http://www.illinoiswindmills. - org/index_files/farm.htm.
LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 42) LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 43) LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 44) LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 45) LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 46) LONG BEACH STEAM STATION, LONG BEACH-LAGUNA BELL 66 kV AND 220 kV TRANSMISSION LINES HAER CA-2344-A (Page 47)