BlockBefore

Ortona Lock, Lock No. 2, Machinery and Control Houses, Caloosahatchee River, Cross-State Canal, Okeechobee Intracoastal Waterway, Ortona

Ortona Lock, Lock No. 2, Machinery and Control Houses, Caloosahatchee River, Cross-State Canal, Okeechobee Intracoastal Waterway, Ortona, Glades County, FL. Surveyed as HAER FL-19-B, with a 1,842-word written history.

From the record

“The five control houses are significant for their role in the operation of the lock and spillway gates.”

Written record, HAER FL-19-B survey. Machine-read text.

Surveyed by the federal HAER program as HAER FL-19-B · the record runs 1842 words · one of 18 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1691 words

Source document Quoted word for word from HAER FL-19-B. Not written, edited or summarised by this site.

The five control houses are significant for their role in the operation of the lock and spillway gates. Report Prepared by: David E. Port and Dena E. Hodes, New South Associates Date: December ORTONA LOCK, LOCK NO. 2, MACHINERY & CONTROL HOUSES (Ortona Lock, Lock No. 2, Building Nos. SF 60, SF 61, SF 62, SF 63, SF 64) HAER NO. Page 2 PART I. HISTORICAL INFORMATION A. Physical History: 1. Date of Construction: 2. Architect/Engineer: U.S. Army Corps of Engineers, Jacksonville, Florida 3. Original and subsequent owners: State of Florida, U.S. Army Corps of Engineers 4. Original Builder: Spadaro Construction Company, Sarasota, Florida 5. Alterations: The entrance door to each control house has been replaced.

The spillway control house was moved to its present site in from the fifth bay of the spillway. B. Historical Context The control houses were constructed in to house the electrical and mechanical equipment used in the operation of the lock and spillway gates. They were all built in although the spillway control house was moved to its present site in when alterations were made to the spillway itself. The four control houses along the lock chamber were previously numbered 1, 2, 3, and 4. The original number of the spillway control house is unknown. PART II. DESCRIPTION A. General Statement Each of these five buildings is constructed of reinforced poured concrete and was designed to house the electrical-mechanical motors to operate the lock gates. They are small with only one room.

The four control houses along the lock contain windows on three sides to allow for unrestricted view of the lock chamber and channel. The control houses are utilitarian, almost Spartan in design, with no significant architectural detailing. ORTONA LOCK, LOCK NO. 2, MACHINERY & CONTROL HOUSES (Ortona Lock, Lock No. 2, Building Nos. SF 60, SF 61, SF 62, SF 63, SF 64) HAER NO. Page 3 The lock control houses are set on top of the lock walls adjacent to each gate. The spillway operator's house is cantilevered on the southern end of the spillway adjacent to the southern pier of the spillway's operating platform bridge. According to the as-built, it is the existing control house, which had been moved to this location when the fifth bay of the spillway was removed in B. Physical Description 1.

Exterior: a. General: Each of the four lock control houses is one-story with a low-pitched pyramidal roof. They are constructed of reinforced concrete and measure x x The spillway operator's house is also a one-story, pyramidal roof structure composed of reinforced concrete. It, however, is slightly larger and measures x x 9'. b. Foundations: The four lock control houses are situated on poured concrete slabs while the spillway operator's house rests on the lower walkway platform that forms the ceiling over the spillway. c. Walls: All of the walls are painted reinforced concrete. The corners are chamfered On the north and east side of the spillway operator's house, the building's walls are flush with the spillway structure.

On the east exterior, a concrete buttress known as the stilling well and resembling an exterior end chimney descends down the height of the building at its midpoint. Tapered ends slope to meet the roof and spillway's exterior wall on the top and bottom of this buttress. This protrusion measures x x approximately 10' and partially covers the pipe that carries the hydraulic oil from the pump motor, which powers the spillway's vertical lift gates, out of the building. Concrete covered electrical trenches extend from the operator's house along the length of the spillway's lower walking platform. ORTONA LOCK, LOCK NO. 2, MACHINERY & CONTROL HOUSES (Ortona Lock, Lock No. 2, Building Nos. SF 60, SF 61, SF 62, SF 63, SF 64) HAER NO. Page 4 d.

Structural system: The houses are built of reinforced concrete. The minimum distance from surface of the reinforcing bars to the surface of the concrete is e. Openings: 1. Doorways and doors: The lock control houses each have one single door on their east elevations. The doors are placed on the land side of the building rather than immediately adjacent to the lock chamber. They are replacement steel doors, which measure 7' -0" x 3 and have a centered one-light square window. As built drawings show that the original doors were half-glass with four lights. The spillway operator's house features a larger steel door measuring x with a six-light window. 2. Windows: Adjacent to the door on the lock chamber side of the east elevation of each building is one single hung metal window.

On the opposite or west elevation is a large, pivot, ten-light window that measures 4' -6" x 5 Facing the lock chamber, are sets of triple, six-light, single-hung windows. Each window measures x One small louvered vent is located on the land side of the buildings near the roofline. The arrangement of windows provides unrestricted views of the canal and chamber. Each house has a metal awning with a scalloped overhang over the door, and the canopies are anchored with steel poles to the concrete steps outside the doors. The spillway operator's house contains one three-over-three sash window facing west and measuring 2 x 3 There is also one two-over-two sash window facing north measuring 2 x 2 Both windows are covered in steel mesh, and there are no windows on the east side. f.

Roof: All four lock control houses exhibit the same low, pyramidal roof constructed of reinforced concrete. There are overhanging eaves with beveled edges. The spillway operator's house also features a low, flat pyramidal roof with the same concrete roof. There is also a sloped and wedged shape poured concrete cap that covers the ORTONA LOCK, LOCK NO. 2, MACHINERY & CONTROL HOUSES (Ortona Lock, Lock No. 2, Building Nos. SF 60, SF 61, SF 62, SF 63, SF 64) HAER NO. Page 5 concrete sheath on the eastern exterior, which runs flush with the house's eave on that side. 1. Interior: a. Floor plans: Each of these buildings contains one room. b. Flooring: The flooring in each of the control houses is reinforced poured concrete. c.

Mechanical systems: Locking procedures are run entirely by the electrical control panels located in these buildings. The control panel is best described as a flat upright enclosed, isometric console mounted on a steel cabinet and designed for the lock personnel to sit at and operate during locking procedures. The electrical panels permit both manual and automatic operations, and they also contain separate controls for each lock gate, bargraph readouts of gate positions and lock, and sea and lake water levels. The control panels are installed with self-synchronous devices consisting of the four selsyn receivers that operate the differential water level and gate position indicators.

The lock personnel also may control the lock approach and traffic control lights as well as the catwalk gate operation. Spadaro Construction Company originally installed the existing General Electric (GE) control panels in 19 3 7, and all operations are still controlled through manual switches. The following information was recorded on one control panel housed in the northwest control house. The patent plate was verified through Schenectady Museum, which houses the largest archives of patented General Electric products. The information underlined represents letters and numbers that are stamped inside a box. There was also a large 3 and a 5 to the left and the right of this plate. ORTONA LOCK, LOCK NO. 2, MACHINERY & CONTROL HOUSES (Ortona Lock, Lock No. 2, Building Nos.

SF 60, SF 61, SF 62, SF 63, SF 64) HAER NO. Page 6 GENERAL GE ELECTRIC Made in USA CR 2 906 -Yl SERVICE CONTROL DESK HB 5 AMP 16 VOLTS 220 CYCLES 60 PHASE 3 CAT. CONN PP - Caution! Before installing or operating read inst. (Navy emblem and Swastika or Publication Index) NP Schenectady, Source: Patent Plate Text According to the archivist at Schenectady Museum, no records of Ortona lock and dam, the Cross-State Canal, Spadaro Construction Company, the War Department, and the Caloosahatchee River were found during an archival search. The contractor probably did the actual installation, and therefore, GE left no record of it. The was a "generic" relay panel that was used for large motor or pump control. While GE does have many photographs of this panel, there are none from Florida.

As for the swastika, the archivist concurred that it was related to a publication manual index. This symbol could have been any character that GE chose to utilize, and the swastika was used to illustrate that there was an "indefinitely out-of-print" user manual for this model during the late and early 1 It is only a coincidence that a swastika appears on one control panel during Ortona's construction and completion prior to World War II. The interior of the spillway operator's house consists of a single room with no architectural details. Electrical control of the spillway is provided by a panel located in the spillway operator's house.

This panel controls the raising and lowering of the two motor powered taintor gates, the motor powered hydraulic pump that raises the vertical lift gates, and the spillway's lighting. The room houses both the panel and pump. 1 Chris Hunter (Schenectady Museum archivist), unrecorded interview with author, ORTONA LOCK, LOCK NO. 2, MACHINERY & CONTROL HOUSES (Ortona Lock, Lock No. 2, Building Nos. SF 60, SF 61, SF 62, SF 63, SF 64) HAER NO. Page 7 C. General Siting The Ortona lock control houses are located along the lock chamber at each of the four sector gates. The spillway control house is cantilevered over the river on the south bank immediately adjacent to the spillway itself. They are surrounded by concrete with no landscaping. PART III. SOURCES OF INFORMATION A.

Architectural Drawings The engineering drawings are located at the U.S. Corps of Engineers Office, South Florida Operations Office, Clewiston District. They have been electronically scanned producing high- resolution images. The full collection of scanned images for Ortona Lock and Dam will be donated to the Florida State Archives, Tallahassee, Florida. B. Bibliography Hunter, Chris (Schenectady Museum archivist). Unrecorded interview with author.

In context

Ortona, Florida The place record: every map, photograph and survey of this town.
Glades County, Florida 47 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Ortona

6 records

The federal surveyors worked through Ortona building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Ortona LockHAER FL-196,780 words
Ortona LockHAER FL-19-A4,414 words
Ortona LockHAER FL-19-C3,241 words
Ortona LockHAER FL-19-D2,546 words
Ortona LockHAER FL-19-F746 words
Ortona LockHAER FL-19-E676 words

Provenance

  • Written history. Quoted verbatim from HAER FL-19-B. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.