BlockBefore

Fort Pickens, Mine Loading Building, 1400 Fort Pickens Road, Pensacola Beach

Fort Pickens, Mine Loading Building, 1400 Fort Pickens Road, Pensacola Beach, Escambia County, FL. Surveyed as HABS FL-604-A, with a 11,645-word written history.

From the record

“The Mine Loading Building was constructed in by the U.S.”

Written record, HABS FL-604-A survey. Machine-read text.

Surveyed by the federal HABS program as HABS FL-604-A · the record runs 11645 words · one of 133 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

69 words

Source document Quoted word for word from HABS FL-604-A. Not written, edited or summarised by this site.

Fort Pickens Road, Gulf Islands National Seashore, Pensacola Beach, FL The Mine Loading Building is located at latitude: longitude: The coordinate represents the approximate center of the building with an estimated +_1-meter accuracy. Calculation of the coordinate was completed on May 19, in ArcMap ArcGIS for Desktop. The coordinate s datum is North American Datum The Mine Loading Building location has no restriction on its release to the public.

Significance

82 words

Source document Quoted word for word from HABS FL-604-A. Not written, edited or summarised by this site.

The Mine Loading Building was constructed in by the U.S. Army. The building is significant for its association with late nineteenth and early twentieth century activities conducted by the U.S. Army to protect the strategically-important Pensacola Harbor using Endicott batteries and mine technology. It is also significant for its association with Fort Pickens and as one of only three surviving buildings related to the early twentieth- century defensive mines in the harbor. It survives with sufficient integrity to convey its historic associations.

Written history

11366 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HABS FL-604-A. Not written, edited or summarised by this site.

This recording project was undertaken by the National Park Service Southeast Region SER) and Gulf Islands National Seashore as one of the mitigation measures mutually agreed upon in the Memorandum of Agreement between the NPS and the Florida Division of Historical Resources (SHPO). The NPS proposes to modify and rehabilitate the mine loading building in support of a new ferry service for the western end of Santa Rosa Island. In addition to the Level II written documentation, the report includes CAD drawings of the floor plan and large format photographs of the exterior and interior. The written documentation is based on information provided in a July Historic Structures Report for the Fort Pickens Mine Storeroom (HABS No.

and Mine Loading Building and the draft National Register nomination for The Harbor Defense Project, Defenses of Pensacola Historic District, as well as other sources provided by the Gulf Islands National Seashore staff in their files. The written documentation was developed by Wiss Janney Elstner, Associates, Inc., and edited for this survey by Rita Walsh, Senior Preservation Planner of Watertown, MA. The photographs were taken in April by Travis Fulk, SEARCH, Inc. of Springfield, VA. The CAD drawings were prepared by Laurel Bartlett, SEARCH, Inc. of Newberry, Florida. The report was completed in February FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 3) PART I. HISTORICAL INFORMATION1 A. Physical History: 1. Date of erection: The building was completed in June 2.

Architect: The building was constructed for and was built in accordance with the U.S. Army Corps of Engineers standard plans for this type of structure. As part of an overall effort to increase the standards of its building construction after the Civil War, the Army began to develop standardized quartermaster plans. Standardized building plans were considered to be more cost-effective. Beginning in the Quartermaster Corps also began to contract with civilian architects and builders to complete the designs for and construct post buildings, although the Quartermaster Corps continued to oversee the work and approve the plans.

Standardization plans typically fall within three distinct phases based on Army initiatives; to to and to Reduced copies of measured CAD drawings prepared in are included in Appendix A. 3. Original and subsequent owners, uses: a. The Mine Loading Building was built by the U.S. Army in to replace an earlier structure converted to this purpose in The earlier structure was demolished after it was heavily damaged in a explosion at Fort Pickens. b. Following the hurricane of the U.S. Army decided that the harbor mine defense system was no longer needed, with the Navy taking over responsibility for defense against submarine attack. Thereafter, the Mine Loading Building and companion Mine Storeroom (HABS No.

were used for ancillary maintenance functions; in the Mine Loading Building was used as a Railroad Shop, and later as an automotive maintenance area and carpentry shop. 1 This historical narrative is based largely on a Historic Structures Report prepared for both the Mine Storeroom and Mine Loading Building in The HSR was prepared by Wiss, Janney, Elstner Associates, Inc. for the National Park Service, Southeast Region. The draft National Register nomination (Section 8) of The Harbor Defense Project, Defenses of Pensacola Historic District, prepared by the same authors, was also consulted.

All of the photos, and measured drawings, site plans, and other graphic materials were obtained from the Footnotes in this report reference the HSR and the NR nomination and not the footnotes referenced in these documents. VHB edited and compiled all of this information to comply with this report s format. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 4) c. The last military garrison pulled out of Fort Pickens in and the U.S. Army salvaged all usable metal from the area before handing the property over to the State of Florida. d. An Act of July 2, (62 Stat. authorized the establishment of Pensacola National Monument, to include approximately 13 acres. encompassing Fort San Carlos de Barrancas, Fort Redoubt, and Fort Pickens. e.

In Fort Pickens became part of the Florida State Park system. During this time, the Mine Loading Building served storage and maintenance shop uses, but its military history was also interpreted. f. With the establishment of Gulf Islands National Seashore in public use of the fort district continued under the administration of the National Park Service. The Mine Loading Building continued its functions as a maintenance shop and storage. 4. Builder: The identity of the builder (s) is unknown. 5. Original Plans and Construction: The original, mostly open, plan of the building remains basically unchanged. 6. Alterations and Additions: There are no additions to the building.

Alterations to the building include replacement of the original slate shingles with asphalt shingles (most recently in after Hurricane Ivan). Localized repointing and masonry crack repairs were conducted by park maintenance personnel during the and ca. some of which was poorly done. New wood doors reportedly matching the appearance of historic doors were constructed by volunteers in The basis for the design of the doors is not documented, however, and the existing doors do not match the doors visible in a view when it was a state park or in a view taken soon after the NPS acquired it (Figure In the same year, volunteers conducted repair and restoration work on the windows. New glass was purchased to replicate the appearance of glass from the original period of construction.

Also in several window lintels, as well as the door lintel at the southeast wall, were replaced with new stainless steel lintels. The work included removal of original corroded and displaced steel lintels, and reconstruction of interior brick masonry around the lintels. Some window frames were entirely removed to accommodate the work. 2 The photograph from the is not included in this report due to copyright. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 5) B. Historical Context: Summary3 The United States began development of the chain of forts known as the Third System of coastal defenses in following British attacks during the War of that indicated a need for stronger fortifications.

After control of the Florida territory was transferred from Spain to the United States in the U.S. Army Board of Engineers surveyed the newly acquired coastline to identify desirable locations for defensive works. Pensacola Bay was identified as the principal Gulf Coast port, primarily because of its protected deep water harbor. To protect this harbor, the western end of Santa Rosa Island was chosen as the site for the first of the fortifications in Florida Fort Pickens. The fort was constructed beginning in and was completed by early October Throughout the Civil War, Fort Pickens remained under Union control. From until the end of the Civil War, Fort Pickens was used as a prison for military and political prisoners.

In the in response to new military technology and deterioration of older fortifications, the U.S. Army began construction of the Endicott System of coastal fortifications. At Fort Pickens, this effort included the construction of a mine support casemate in the northeast bastion of the fort in Between and four reinforced concrete fortifications Battery Pensacola, Battery Cullum, Battery Van Swearingen, and Battery Worth were built in the Fort Pickens area, while a mine field was prepared for the harbor entrance. Underwater mines were planted in the harbor in April days before war was declared with Spain, with existing structures used for support in the operation.4 Most of the mines were recovered in December soon after the war s end, but a small number were presumably swept away.

In in order to complete the mine support system with key components, several structures, including a torpedo (or mine) storeroom, concrete cable tank, and a mine loading building were constructed between the fort and the pier to support the mine field in the harbor. However, disaster struck on June 20, when the powder magazine in the northeast bastion of Fort Pickens exploded. The explosion and debris leveled the mine support structures near the pier. The Mine Storeroom (HABS No. was immediately reconstructed on the original foundation and completed by June Construction of the new Mine Loading Building was not completed until June 3 Wiss Janney Elstner, Associates, Inc. Gulf Islands National Seashore: Fort Pickens Mine Support Structures.

Historic Structures Report: Fort Pickens, July 1, 2. 4 Bearss, FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 6) After a hurricane caused significant damage in a masonry and concrete seawall was built around the military structures in the Fort Pickens area. The seawall was constructed between and Based on evolving military technology and the need to protect against attack by aircraft during World War I, new defenses were built at Battery Langdon and Battery Fixed, while anti-aircraft weaponry and searchlights and towers were introduced in association with some of the existing batteries, including Battery Worth and Batteries Cullum and Sevier between and Following the hurricane of the U.S.

Army decided that the harbor mine defense system was no longer needed in Pensacola Bay, with the Navy taking over responsibility for defense against submarine attack here at this early date. All mine duties throughout the country were transferred, however, to the Navy s harbor defense unit in After the Mine Storeroom (HABS No. and Mine Loading Building were used for ancillary maintenance functions, including an automotive maintenance area and carpentry shop with most of the buildings adjacent to them removed by the end of World War II. During World War II, two anti-aircraft gun platforms were erected outside the seawall south of Fort Pickens. Battery 234 was also completed outside the seawall to the east, along with a tower and range finders.

Many earlier batteries were retrofitted with plotting rooms for calculating artillery ranges. Fort Pickens remained an active military installation until . In the Fort Pickens Military Reservation was purchased by the State of Florida from the federal government. The Fort itself and eighty-seven surrounding acres were transferred to the State through the Historic Surplus Property Program for Historic Monument Purposes. The property was transformed into the Fort Pickens State Park, with adjacent areas serving as Escambia County recreation areas. In view of lack of local resources and concern over the deterioration of the historic forts along the bay, including Fort Pickens, in Congress established Gulf Islands National Seashore and the property was transferred to the National Park Service.

5 Wiss Janney Elstner Associates, NR nomination, 59. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 7) Underwater Mine Defense in the United States6 The remaining mine support structures at Fort Pickens, including the Mine Loading Building, exemplify key components of the Endicott System, which was implemented beginning in the One key feature of the system was explosive underwater mines that could be set out in the harbor as a defense against submarines and armored warships. The controlled minefields that were installed as part of this plan consisted of mines and cables that were stored on nearby land and could be planted in the water quickly in the event of war. Submarine mines, or "torpedoes" as they were originally called, were an American invention.

Used during the Revolutionary War, several improvements were made during the next eighty years. During the American Civil War mines were an important and effective part of the defense of the Confederacy. In the U.S. Army Board of Engineers recommended the use of mines as a part of established harbor defenses. In the Engineer School was established at Fort Totten, Willets Point, New York, and the development of a modern submarine mining system was assigned to that school. Colonel Henry L. Abbot was assigned duty as commandant of that school, and over the next twenty years he perfected a submarine mining system, called the grand mine group, for use by the Army (Figure When the Endicott Board published its report on the state of U.S.

harbor defenses in the core of its proposal to revamp the defenses was the use of submarine mines. Abbot's basic system with some revisions to the mechanical and electrical equipment, was used by the U.S. Army from the through World War II. The U.S. Army began installing mine defense facilities in major U.S. harbors in the However, mines were not actually planted, except for the tests run by Abbot, until the Spanish American War in when mines were planted in twenty-eight U.S. harbors, including Pensacola Bay The lessons learned from that effort resulted in some changes in mine planting facilities, mostly making them a bit more "user friendly."7 In the submarine mine program, still based out of Fort Totten at Willets Point, was transferred from the Corps of Engineers to the Artillery Corps.

The Artillery Corps established its Submarine Mine School (moved to the Coast Artillery School at Fort 6 The text in this report section that provides a description of the historical development and operation of the underwater mine or torpedo system is closely based on Mark A. Berhow s American Seacoast Defenses: A Reference Guide, Second edition, 7 Ibid, 326 FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 8) Monroe, Virginia, in and its primary mine depot at Fort Totten. By the construction of mine defense facilities was underway at many U.S. harbors under the "Endicott-era" construction program. In the first four specially built mine planters were ordered by the Army.

Four more planters joined these in The mine planters were manned by civilians and were intended to travel from harbor to harbor to perform their duties. Mine facilities were also built overseas in Panama, Hawaii, and the Philippines. During several organizational changes were made, but equipment shortages plagued the system. Things changed somewhat with the entry of the United States into the World War in Europe. Some harbors had mine fields laid in although there is no record of one in the Pensacola area. In orders were placed for ten more mine planters and more mines. In addition, the troublesome civilian crew system on the planters was eliminated and the planters were subsequently manned by army personnel, supplemented by the local garrison with each change of station.

However, this did not last long as spending cuts in the eliminated all but five of the older mine planters and all but three of the new planters. In a new mine planter was ordered, and the mine defenses were brought up to war footing with the construction of new facilities at the harbors which were to continue to have mine defenses. With the buildup of U.S. military forces in the Army ordered sixteen new planters built to replace its aging fleet. New mines were designed and built, along with a few new facilities to maintain them. After the U.S. entered World War II in mines were planted at several major harbors around the continental United States and maintained there throughout the war. In some of the new mine planters were transferred to the Navy.

In many of the remaining coast artillery commands were deactivated and the others quickly followed during the next two years. That year, it was decided to transfer all mine duties to the Navy's harbor defense units. The Navy would experiment with controlled harbor defense mines into the when it also discontinued their use. U.S. Army Controlled Submarine Mines Submarine mines were basically categorized as controlled or uncontrolled, and as either buoyant or ground. Uncontrolled mines, once laid, were detonated by contact with a passing vessel, friendly or unfriendly. Controlled mines were connected by cables to a control device on shore. Buoyant mines were those that floated and were restrained to an optimal depth in the channel by an anchor, while ground mines rested on the bottom.

All army mines were the controlled type. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 9) A controlled submarine mine, as employed by the U.S. Army, was a watertight steel case, containing explosive and a firing device, with a means for control of fire by electrical connection to shore. The case was of such size that it was held at a predetermined depth by the length of mooring rope that was attached to the anchor which retained it at the location at which planted. The U.S.

Army used controlled buoyant mines to defend American harbors during the period from the until early Some controlled ground mines were used during the period Controlled mines were used to close such portions of harbor entrances that led to channels required for the use of friendly naval forces and friendly commercial shipping, or included a debauching area required by naval forces. In addition, controlled mine fields were limited to distances not exceeding yards from the shore and to depths not greater than 250 feet. The effective range was yards from channel mouth inner limit, yards from the outermost searchlight locations, with a minimum depth of twenty feet, and a maximum depth of 250 feet. The maximum current in the channel could not exceed three knots.

The number of mines and their planting depth was determined by the locality to be defended. Mine Structures, Vessels and Equipment For each defended harbor, one or more of each of the following was required: See Figure B.2 for an example of the arrangement of these components in a harbor; note that the arrangements of on-shore facilities varied greatly. All of these components were present at Ft. Pickens, with the exception of the mine planting vessels, which were probably berthed at Fort Barrancas. The mine casemate which housed the power and control equipment. The mine (torpedo) storehouse for the storage of empty mines and equipment. The loading room for assembling and loading the mines. The magazine for the storage of explosives. The cable tank for storage of cables under water.

The mine wharf for loading the mines on the planter. Trackage (tramway) connecting the mine storehouse, magazine, cable tank, and mine wharf. Mine group commander's station with plotting room. Base end stations. 8 Ibid, 327 FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 10) Mine planting vessels- including the regular and auxiliary mine planters, distribution box boats, and motor mine yawls. Position finding equipment-including the base end observing instruments, mine group commander 's telescope, plotting board, predicting device, stop watch, telephones, and telephone lines. Searchlights-for the illumination of the mine field at night. These may or may not have been separately assigned to the mine command. Rapid-fire guns for protecting the mine field.

The War Department policy was that the controlled mines, along with all essential accessory items required to plant and operate them, were to be (1) stored locally, (2) contiguous to the projects they were to be used in, (3) in readiness for immediate use, and (4) in quantities sufficient to plant the mine field authorized by the project, and (5) provide maintenance of these projects after planting. In practice, most authorized projects did not have all the materials needed to plant a complete mine field at the sites they were to defend.9 During peacetime, the mines were deployed only for practice, then retrieved, unloaded, and stored ashore. Mines were only actually deployed in defenses for long periods during the Spanish-American War and World War II.

When deployed, mines had to be periodically retrieved to repair damage caused by being at the mercy of the elements, tides, currents and passing ships. Components of the Controlled Mine System Mines proper were composed of the casing, explosive (gun cotton or dynamite before trinitrotoluene thereafter), compound plug with mine transformer, moorings, and anchors. The unit for planting, called a "group," consisted of nineteen mines planted at intervals of 100 feet across the waterway to be defended, with submergence as required by tactical considerations. One group of mines thus defended feet (eighteen intervals plus fifty feet to each flank). An appropriate number of mine groups to cover the length and breadth of the waterway provided the underwater defense.

The groups of mines were numbered from left to right looking offshore, beginning with the most advanced line, if the project included two or more lines of mines.10 The mines were delineated by a numerical designation indicating displacement capacity. During this 9 Ibid, 10 Ibid, 329 FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 11) period there were two basic mine shapes: the spherical mine and the sphero-cylindrical mine.11 The basic "grand" mine group arrangement for controlled submarine mine fields was developed by Colonel Henry Abbot in the Abbot's grand group consisted of seven groups of three mines, each group connected to a junction box. In the junction box, the individual mines were connected to a single conductor cable joined to the distribution box.

The distribution box was then connected to a terminal vault on the shore, which was in turn connected to a panel in the mine casemate. Activation from shore of one of the seven units of a group resulted in the activation (or detonation) of all three mines hooked to the activated conductor. Later, as cable with more conductors became available, the junction box was eliminated and the grand group consisted of nineteen mines individually attached to a distribution box. A twenty-conductor cable used for telephone communication between the ship and the mine casemate then connected the distribution box to the cable vault and the mine casemate on the shore. By late the twenty-conductor cable for each grand group had been replaced with a single-conductor cable.

The power system included a direct current generator, an eighty-volt storage battery, motor-generating sets to provide alternating current (AC) for firing, a casemate transformer, a power panel to control direct and alternating current, and an interrupter panel for the single conductor system. The Mine Flotilla: Mine Planters, DB Boats, and Yawls The mine flotilla consisted of a mine planter, a distribution box boat (DB boat, also known as a L-boat after the numerical designation on the side of the boat), and two to four yawls. There were rarely enough mine planters for one to be assigned to each harbor that had mines. Often one or two mine planters were assigned to a major harbor. Smaller harbors without assigned mine planters would be visited by a planter for practice.

Many harbor defenses used vessels that were jury-rigged to serve as makeshift mine planters and DB boats due to the lack of a sufficient number of actual army mine planters.12 11 Ibid, 331 12 Ibid, 336 FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 12) Shore Facilities The equipment for the entire minefield was stored ashore during peacetime, disassembled without explosives or fuses. They were only to be deployed during times of war. The shore facilities included all the buildings and equipment necessary to store, assemble, test, transfer, and repair the mines, cables, anchors, and distribution boxes. In addition, all the buildings and equipment for controlling and detonating the mines was also located ashore. 13 These facilities were present at Fort Pickens.

Mine (Torpedo) Storehouses All the disassembled mine equipment was stored in these buildings: empty mine casings, anchors, compound plugs, circuit closers, shackles, mooring sockets, distribution boxes, and the various tools and equipment. These buildings had racks and shelves, movable overhead hoists with blocks and tackle for moving the equipment, ropes, chains, tools, and appliances. These buildings were one to two stories high, and the building sizes varied greatly from post to post.14 Cable Tanks The mine cables were stored in large fresh water tanks to prevent deterioration. Each concrete tank had to be capable of holding feet (or three tons, pre-WW I, later feet or 5 tons) of cable on a reel.

The cable tanks were usually enclosed in a building to control evaporation and were equipped with overhead cranes with hoists and tackle. The cables were initially tested as well as repaired in this facility.15 Loading Rooms Loading rooms were where the mine components were assembled and tested after all the necessary equipment and materials were brought from the storehouses, cable tanks, and magazines. Typically, the facility was composed of two rooms, one for loading and assembling mines, and one for loading and assembling the compound plugs (the detonating devices). The loading room often had a small cable test tank and overhead hoists.

Mines were loaded with explosives, fitted with their compound plugs, connected to their cables, tested for watertightness and electrical circuit integrity, and then sent out to the wharf. Mines for a complete group were assembled before being sent out to the wharf. Cables were cut and prepared for attachment and laid out in transportable figure 13 Ibid, 346 14 Ibid, 350 15 Ibid, 353 FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 13) A service dynamite room for temporary storage of the dynamite to be used was often located adjacent to the loading room, as shown in the drawing below. Magazines The explosives used in the mines, dynamite and gun cotton before trinitrotoluene after, were stored in magazine facilities at the post.

Only a fraction of what was needed for the complete project was kept at the post, the rest was shipped from a US Arsenal as needed. Sometimes there were specially built magazines just for the mine compound plug detonators near the loading room. Fuses were kept in a separate room away from the bulk explosives.16 Mine Tramway All mine depot facilities were connected by a rail system. If the post had a regular railroad system, the tramway may have been incorporated using the same gauge rail as the railroad. If not, typically a three-foot gauge rail system was installed connecting the mine wharf with the loading room, torpedo storehouse and the cable tanks.

The flat cars could be manually pushed from facility to facility.17 Cable Terminal Huts The mine connections from the shore to the mine casemate were laid in underground tunnels. These were (usually) permanent installations. The tunnels ended at small concrete structures of a variety of designs, called cable terminal huts, boxes, or vaults. The shore cables from the mine groups were brought up to the shore and routed to the mine casemate through these vaults. Mine Wharf A typical mine wharf was a pier with a large square work surface area and a heavy loading derrick. The planter would load the mines, cables, and distribution boxes from the wharf, which was connected by the tramway to the loading room. Usually mine wharves had boathouses for storing the smaller yawls and their equipment.

Ideally, a post would have a separate wharf for mine activities. Quartermaster and engineer wharves would be used for other activities so as not to interfere with the mine planting, but often the mine wharf was used for other post shipping activities as well.18 16 Ibid, 355 17 Ibid, 357 18 Ibid, 358 FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 14) Mine Casemates This structure held the firing controls for a mine field. In the mine casemates were sometimes located inside a reinforced casemate of an older fortification, hence the name. This was the situation at Fort Pickens, where the mine casement was a conversion of two casemates in the northeast bastion of the fort.

After the turn of the nineteenth century, the mine casemates were larger structures built of brick or concrete with windows for better ventilation. The structure was divided into separate rooms for the operating board power equipment, storage batteries, and a ready room.19 Chronology of Development and Use, Fort Pickens Mine Support Structures and Engineers Wharf/Ferry Landing Area20 The location of Fort Pickens mine support area was the site of a wharf as early as In this year, the first of several wharves or piers was constructed along the north side of Santa Rosa Island. By January three wharves had been built on the island, including one on the bay near the future site of Fort Pickens. Lumber from Pensacola Bay mills was utilized to build the wharves.

Prior to construction of Fort Pickens, which began in May a road was constructed from the new wharf to the location of the planned fort. Fort Pickens was completed in and in September all temporary structures near the fort were demolished, except for the wharf. Following an inspection of Fort Pickens and associated buildings, funds were allotted in to construct a new permanent wharf with the new wharf rebuilt in that year. A hurricane heavily damaged the new wharf four months later, with repairs made in September The onset of the Civil War prompted Lt. Adam J. Slemmer to remove his command and supplies from nearby Fort Barrancas across Pensacola Bay to Fort Pickens on January 10, Florida seceded from the United States that same day. On January 15, Col.

William Chase led Florida State troops to Fort Pickens to request the surrender of the fort. This request was refused by Lieutenant Slemmer, and in April reinforcements landed on Santa Rosa Island. Fort Pickens continued to be garrisoned by United States troops for the duration of the Civil War. 19 Ibid, 359 20 Wiss Janney Elstner, 16, 17 FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 15) In January a mule-drawn railroad extending from the fort through the sally port and to the wharf was completed. In the years following the Civil War, significant changes were made to the wharf north of Fort Pickens. A new wharf was constructed in and a new plank road from the wharf to the sally port was also completed at this time.

During the and early1880s, the condition of the nation s coastal defenses had declined due to a lack of funding. At the same time, changes in the design of heavy ordnance suggested the vulnerability of the United States to attack and an overall need to improve coastal defensive systems and the army s ability to operate them. As early as President Chester A. Arthur began to note the need to improve seacoast defenses in his Second Annual Message to Congress, suggesting appropriations be made for high-power rifled cannon for the torpedo service and for other harbor defenses. In President Grover Cleveland followed up on Arthur s recommendation by convening a board, under the auspices of Secretary of War William C.

Endicott, to evaluate the nation s coastal defenses and propose a program to modernize them. The so- called Endicott Board submitted a report in recommending that twenty-three key ports, Pensacola among them, be improved through the construction of new coastal defense structures. One of the areas to be improved was Santa Rosa Island. By the the wharf at Fort Pickens was showing significant signs of deterioration. Despite numerous requests to build a new wharf and to make other repairs to the fort, funding for this work was consistently declined. Due to their state of deterioration by the early funding for repairs to several coastal brick and masonry forts including Fort Pickens, was discontinued in In Fort Pickens became a U.S.

Army Coast Artillery Post, a new designation related to the recognition by army leaders that heavy fixed artillery required different training programs and tactics than mobile field artillery. The coast artillery became responsible for the installation and operation of the proposed new system, which included controlled explosive mine fields that could be set out in the harbor as a defense against submarines and armored warships but would be monitored, fired electrically, and protected by fixed guns.21 Endicott System Implementation, 21 Wiss Janney Elstner, 13. 22 Ibid, 13 15. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 16) Because most of the nation s existing coastal brick and masonry fortifications were in a state of deterioration by the late the U.S.

Army Corps of Engineers ceased funding their repair and preservation between and Instead, by January the Board of Engineers had specifically indicated the need to begin implementing Endicott Board recommendations at Pensacola and elsewhere. At this time, as part of the Endicott plan to modernize the United States coastal defense system, construction of a mine support casemate at Fort Pickens, its first mine support structure, was approved. The mine support casemate would be located in casemates 86 and 87 in the northeast bastion of Fort Pickens.

The casemate was built using allocated to the project from appropriations for Torpedoes for Harbor Defense made on August 23, In support of the project, plans were made in to rebuild the Engineer s Wharf near Fort Pickens, which had fallen into a state of disrepair, and to build a narrow gauge rail line that would facilitate the movement of ordnance and materials to the construction sites. Although the mine support casemate was completed in work on the wharf did not commence until The new wharf consisted of a series of wood piles encased in terra cotta pipes driven a minimum of 4 into the sand, with a structure of 8 x 12 stringers, 8 x 6 floor joists, and 3 -thick planking.

Once completed in the wharf provided for 100 of frontage with a depth of Construction of both the wharf and of narrow gauge railroad track were completed in July Between and four reinforced concrete fortifications Battery Pensacola, Battery Cullum (later redesignated Battery Cullum and Battery Sevier), Battery Van Swearingen, and Battery Worth were built in the Fort Pickens area, while a mine field was prepared for the harbor entrance, as part of the Endicott System. Battery Pensacola, a reinforced concrete structure in the center of the parade ground of Fort Pickens, was built in in anticipation of Pensacola s involvement in the Spanish American War.

The railroad was used to support the battery s construction as well as the construction of Battery Cullum through establishment of two spurs that coursed south from the wharf: one of which led to the battery construction site of Batteries Cullum and Sevier, while the other ran toward the southern beach where sand could be obtained for mixing concrete. An additional spur was added in to connect the wharf with the construction site of Battery Worth. In several additional mine structures, including a torpedo (or mine) storehouse, concrete cable tank, and a loading room were constructed adjacent to the railroad between the fort and the wharf to support the mine field in the harbor.

The site of the original mine storehouse, located adjacent to the engineer s wharf and on axis between the wharf and the sally port of Fort Pickens, was chosen by District Engineer Maj. Frederick A. Mahan. Constructed in the red brick building had a steel-framed slate FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 17) roof and concrete floors. The building housed an overhead travelling crane that was used to handle mine cases. The building cost to construct. A concrete cable tank, sheltered by a wood shed, was constructed at the same time adjacent to the mine storehouse on its south side. Capt. Clement A. F.

Flagler, who replaced Major Mahan as district engineer, requested to convert an existing frame boarding house into a mine loading building in November The structure had been constructed by Aniello de Lustro, who received a license to erect and maintain a temporary boarding house in February The railroad track erected from the cable tank and mine storehouse passed in front of the building. The boarding house was purchased by the U.S. government in the winter of at which time it was converted to a loading room. Progress on these projects was interrupted on June 20, when the powder magazine in the northeast bastion of Fort Pickens exploded, sending up a shower of debris and reportedly hurling bricks as far away as Warrington on the other side of the bay.

Although extensive damage occurred to the mine defense facilities, all were soon rebuilt. Repairs were also made to the railroad track and locomotive in June Soon thereafter, the army post was improved with new quarters, administration buildings, and maintenance facilities added to the north and west of Fort Pickens. It was also around this time, in that the Artillery Corps was divided into two types: field artillery and coast artillery. With additional technological advances, including the development of minesweepers and torpedo boats, the coastal defenses at Santa Rosa Island were again improved with the addition of three batteries of rapid-firing cannon in 06.

These new structures included Battery Payne, constructed in Battery Trueman, constructed in and Battery Cooper, constructed in 06. The new (and current) Mine Loading Building was not completed until June The approximately 23 x 46 building was constructed for and was built in accordance with the U.S. Army Corps of Engineers standard plans for this type of structure. The walls were brick, and the roof was covered with sheet metal. A two-ton traveling crane was included on the interior, as well as a tank measuring 7 x 33 . The new facilities were threatened on September 26, when a severe hurricane struck Pensacola, inflicting heavy damage to the Santa Rosa Island installation. In response, U.S.

Army Corps of Engineers Chief Engineer Cavanaugh recommended erecting a concrete seawall around the installation to protect the facility from future hurricanes. Within two years, a masonry and concrete structure measuring 11 in height, 13 wide at the base, and 5 wide at the top had been completed. A concrete-lined ramp FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 18) was constructed over the seawall to allow rail access to the wharf. Hurricanes continued to pose a threat. On August 11, another hurricane swept away the superstructure of the wharf, leaving only the pilings. Just over a year later, in September the newly- constructed wharf was again destroyed by a hurricane, sustaining similar damage.

As a result of evolving military technology and the introduction of aerial bombing (from both airplanes and zeppelins) in World War I, new defenses were built at Fort Pickens, including Battery Langdon the anti-aircraft Battery Fixed and searchlights at several locations. Refinements in targeting led to construction of several range-finding stations and towers beginning in When completed in Battery Langdon featured a massive casemate to protect the magazines, storerooms, and plotting room located between two 12 guns mounted en barbette and capable of 360-degree fire to a range of 17 miles.

Following another major hurricane in the Army eliminated the submarine mine defense system from its harbor defense project for Pensacola Bay, and the Navy was assigned responsibility for underwater defense of the area at a date earlier than most areas.23 In the responsibility for maintenance and repair of the buildings in the Ferry Landing Area was transferred to the Quartermaster Department from the U.S. Army Corps of Engineers. A map indicates that the buildings in the Ferry Landing Area were used for repair shops and storage and that a number of the buildings in this area were removed by this date. The Mine Loading Building was indicated as a shop.

(Figures and During the Battery Fixed was relocated to the east of Battery Langdon, while Battery GPF was constructed to replace Battery Cooper; still more changes came with the outbreak of World War II. Responding to the effectiveness of dive-bombers in the Spanish Civil War, the German Blitzkrieg of 41, and the Japanese attack on Pearl Harbor, Battery Langdon s guns were casemated in to afford overhead protection, while a new Battery Commander s Station was built behind the battery. In two guns were located on platforms just outside the seawall south of Fort Pickens in Battery AMTB (Anti- Motor Torpedo Boat).

Also in that year, Battery Trueman was relocated to the site of Battery Cullum, Battery Worth was converted into the Harbor Entrance Control Post and Harbor Defense Command Post, and the Harbor Entrance Signal Post was built on the site of Battery Sevier. In 44, improved range-finding towers were established in new locations, radar towers were constructed, and Battery 234 with its tower was completed. 23 All mine duties in the country were transferred to the Navy s harbor defense unit by FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 19) During World War II, long-range bombers, improved sea-borne assault tactics, guided missiles, and the atomic bomb rendered the defenses at Fort Pickens obsolete.

Fort Pickens was closed as active military installation in after 118 years of service. Public Access and Park Development, While the western end of Santa Rosa Island remained a military enclave until other parts of the island became the focus of preservationists and developers. Developers hoped to use the historic structure of Fort Pickens, as well as the pristine beaches of the island, to establish a tourism mecca with hotels and an amusement park, while politicians and others sought to ensure protection and open public access.

In the War Department elected to sell the majority of the island, with the exception of the Fort Pickens Military Reservation, to Escambia County, Florida, for The land was to be used for public purposes, and the county was prohibited from further conveyance of the land except to Florida or the federal government. Escambia County later released three miles of the island for development at Pensacola Beach. In the first Pensacola Bay Bridge was opened along with the bridge across Santa Rosa Sound crossing to the island. In the late the National Park Service expressed interest in preserving the surviving evidence of the historic Pensacola Harbor forts.

In response, Escambia County conveyed undeveloped portions of Santa Rosa Island to the Department of the Interior in This land transfer was based on the assumption that the National Park Service would develop the land as a park and preserve the Pensacola Harbor fortifications. On May 17, President Franklin Delano Roosevelt signed a Presidential Proclamation establishing Santa Rosa Island National Monument. Due to a lack of funding and the mobilization needs associated with World War II, the Department of Interior was not able to take action at the site for several years. In the Department of the Interior permitted the War Department temporary use of the eastern half of the Island as part of Eglin Field. The U.S.

Army Air Corps used the field for early rocket and missile applications and to test a replica of the German The first launch over the Gulf occurred in October In this area was assigned permanently to the War Department. In Congress disestablished Santa Rosa National Monument based on a proposal by Congressman Sikes that suggested the area be returned to Escambia County for public use. 24 Ibid, 15, 16. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 20) The last military garrison pulled out of Fort Pickens in and the U.S. Army salvaged all usable metal from the area before handing the property over to the State of Florida. An Act of July 2, (62 Stat.

authorized the establishment of Pensacola National Monument, to include approximately thirteen acres encompassing Fort San Carlos de Barrancas, Fort Redoubt, and Fort Pickens. In Fort Pickens became part of the Florida State Park system. The State of Florida built the first paved road on the island to access the fort in 54 to accommodate visitors, replacing the army reliance on boats to bring supplies and personnel to the island. In the Fort Pickens Military Reservation was purchased by the State of Florida from the federal government. The Fort itself and eighty-seven surrounding acres were transferred to the State through the Historic Surplus Property Program for Historic Monument Purposes.

The property was transformed into the Fort Pickens State Park, with adjacent areas serving as Escambia County recreation areas. Although primarily used for storage and maintenance, it appears that the historic military use of the mine support buildings was interpreted for visitors during the era of Florida State Parks management.25 In view of the lack of local resources and concern over the deterioration of the historic forts along the bay, including Fort Pickens, in Congress established Gulf Islands National Seashore and the property was transferred to the National Park Service. In the fort and the western half of Santa Rosa Island became part of a newly formed unit of the National Park System known as Gulf Islands National Seashore.

Long used for storage and maintenance services, the mine support area will become an interpretive and visitor services area for a new ferry, including the re-use of both the former Mine Loading Building and the Mine Storeroom. As of a number of forts along the nation s coasts retained their mine support areas. Remaining examples of mine shore facilities are at Fort Hancock (Sandy Hook Unit, Gateway National Recreation Area, New Jersey), Fort Wadsworth (Gateway National Recreation Area, Staten Island, New York), Fort Stevens (Fort Stevens State Park, Oregon), Fort Totten (City of New York), Fort Winfield Scott (Golden Gate National Recreation Area, California), Fort Baker (Golden Gate National Recreation Area, California), Fort Dade (Egmont Key State Park, St.

Petersburg, FL) and Fort Wetherill (Fort Wetherill Park, Jamestown , RI).26 25 This statement is based on photographs, not included in this report due to copyright, that show visitors at the buildings open entrances listening to what appears to be a park ranger. 26 Berhow, FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 21) PART II. ARCHITECTURAL INFORMATION A. General Statement: 1. Character: The Mine Loading Building is a one-story, load-bearing brick masonry building with a concrete foundation and a wood-framed gable roof. The structure is oriented with the end gables on a northeast southwest axis. The main entrance is centered on the southwest fa ade. The building is currently used for storage and as a carpentry and welding shop.

The southwest and northeast fa ades consist of the end gables and are divided into three bays by window and door openings. The southeast and northwest fa ades are the side walls and are divided in five equal-sized bays, each containing window or door openings. 2. Condition of Fabric: The Mine Loading Building is in fair condition, although there is evidence of moisture damage to the brick walls and poor repointing work from previous repairs. B. Description of Exterior: 1. Overall Dimensions: The building has a rectangular plan measuring 47 -2 x 23 -7 and is 20 -2 tall at the gable peak. 2. Foundation: The structure has a concrete foundation consisting of a foundation wall and a continuous footing.

The foundation wall is 13 wide and 6 tall and sits on a concrete footing, approximately 16 wide. The foundation wall does not exist at door openings, while the footing appears to be continuous. The exterior face of the foundation wall is flush with the edge of the footing, extends above grade, and has a 1 chamfered upper corner. The exposed exterior face of the foundation wall is painted green. On the interior of the building, the foundation wall is unpainted and exposed to view, and is flush with the masonry wall above. The concrete footing extends 3 beyond the face of the foundation wall. 3. Walls: The concrete foundation supports a three-wythe, load-bearing, red brick masonry wall. The bricks measure 8 x and are laid in five-course American bond.

The masonry walls are approximately 12 thick and have 3/8 -wide flush mortar joints. There are mortar repairs from various repointing programs throughout the building, as evidenced by the differences in color, profile, and texture of the mortar. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 22) A beige, projecting brick stringcourse, three running bond brick courses in height, wraps around the exterior of the building, approximately 6 -9 above the top of the foundation wall. The projecting stringcourse projects approximately from the face of the wall. At window openings as well as the door on the southeast facade, the stringcourse wraps up and around the lintel forming segmental arched openings. The arch consists of two courses of rowlock brick.

On all walls, the upper 6 of the exterior brick walls have remnants of a thin, red paint coating. 4. Structural System/Framing: The walls are three-wythe, load-bearing brick masonry. The roof structure appears to be original and is constructed of king post trusses spaced 24 on center. Each truss consists of two 2 x 8 top chords set at a pitch, a 2 x 6 center king post, and paired continuous 1 x 8 bottom chords that sandwich the bottom of the top chord and king post members. The top chord extends beyond the bottom chord and over the masonry wall, and is exposed to view at the roof eave. The joints between truss members are connected by nailed 1 x 6 wood gusset plates. Spanning between the bottom chords and aligned to each king post is a 1 x 6 bracing member.

Running perpendicular to the truss are 1 x 3 tongue-and-groove deck boards. The end trusses are secured to the masonry end gable wall with 2 x 6 wood kickers that extend into pockets in the masonry. Two trusses at the southeast end of the building, near the attic access panel, deviate from the standard kingpost truss in that they have an additional vertical post and diagonal strut; historic photographs from and shows a chimney or flue at this location (Figures B.8 and At the eave, at every third space between trusses, is a louvered metal grille that ventilates the attic to the exterior. 5. Porches, stoops, balconies, porticoes, bulkheads: The Mine Loading Building does not have these features. 6. Chimneys: There are no chimneys on the building.

A small chimney or flue was previously located at both the south (by and see Figures B.8 and and north (a photo shows a flue or chimney; not included in report due to copyright) gable ends. The latter chimney was gone by (Figure 7. Openings: Doorways and doors: Door openings are centered on the southwest and southeast fa ades of the building. The doors at both openings are not original to the structure. The southwest end gable fa ade contains the main entrance and is divided into three bays by the configuration of the doors FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 23) and windows. At the door opening, the stringcourse ends and the door opening has an 8 -tall brick flat arch consisting of alternating soldier and rowlock bricks. a.

The doors of the main entrance consist of paired four-panel hinged doors, painted green. Each door measures approximately 4 -8 wide x 9 -8 tall and is 4 thick. The door is constructed of two recessed panel veneers over a plywood core. The veneers are constructed on a 2 x 4 wood frame that divides the door into four panels. Each panel is recessed 1 and has 3 -wide tongue-and-groove boards oriented diagonally. When closed, the diagonal boards from each door leaf align and form a chevron pattern. The veneer and plywood are connected with through bolts. The door is mounted to the exterior face of the masonry opening with three steel strap hinges, painted black. The hinges are supported on steel pintles that are embedded into the masonry. The door is secured with a contemporary padlock.

One of the strap hinges is missing, and a pattern matching the shape of the hinge has been painted onto the wood door. The center bay of the southeast fa ade contains a segmental arch door opening measuring 7 -0 wide by 7 -5 inches tall. The door head is formed by a projecting two-course-high rowlock brick segmental arch that extends from the projecting brick stringcourse. The opening has a wood panel between the top of the paired doors and the head of the masonry opening. The opening has paired hinged doors, painted green. Similar to the main entrance, the doors are constructed of veneer panels over a plywood core and feature tongue-and- groove boards, each 3 wide and oriented diagonally. When closed, the diagonal boards align to create a chevron pattern on the paired doors.

The layers of the door assembly are connected with through bolts that are also used as an ornamental feature. The bolts are spaced 12 apart on each board and are aligned to accentuate the diagonal pattern. The doors are mounted to the interior face of the masonry wall with five-knuckle hinges and secured in place with a wood cross bar. The door hinges are secured into the wood door frame. Windows: The windows on the building are arranged in a regularly-spaced pattern of bays. The typical bay is approximately 9 wide and has a single window opening measuring 3 -0 wide x 6 -3 tall, with a concrete sill; the southwest wall has some window openings approximately 1 -9 wide.

The windows heads are formed by a projecting two-course-high rowlock brick segmental arch that extends from the corbelled brick stringcourse, and the upper arch portion of the openings feature a wood panel. The window sills are FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 24) approximately 2 -2 above the foundation. The window opening is centered within the width of each bay. The end bays on each fa ade are 12 wider than the typical bay. The northwest and southeast side fa ades are divided into five typical bays. The northeast fa ade consists of the end gable and is divided into three typical bays. The bays on this wall are 7 -0 wide and the center window is approximately 3 offset to the northwest from the centerline of the wall.

The southwest end gable fa ade contains the main entrance and is divided into three bays by the configuration of the doors and windows. The side bays on the southwest end fa ade each feature a single window opening measuring 1 -9 wide x 6 -3 tall. The existing windows are wood-framed, single-glazed, one-over-one or two- over-two, double-hung sash, painted green. Each sash measures approximately 3 tall with the upper segmental arch portion of the opening infilled with a wood panel. Each window has an operable counterbalanced weight system with rope sash chord. One-over-one windows are located on the southwest elevation and are approximately 1 -9 wide. The remaining elevations have two-over-two window sash and are approximately 3 wide.

A non-historic window film was applied to the interior face of some glazing units to reduce solar glare. 8. Roof: a. Shape, covering: The Mine Loading Building has a wood truss-framed, asphalt shingle-clad gable roof with open and exposed eaves. b. Cornice, eaves: The roof has a wood fascia, painted green, with a fascia trim board that is clad with green-colored sheet metal. The overhanging eaves are open and divided into 2 -wide bays by the exposed top chord rafter tails. Also visible at the eaves is the underside of the 1 x 3 roof deck and the louvered attic vent openings. Some of the wood fascia and trim, as well as all of the sheet metal flashing and asphalt shingle roofing material, are not original to the structure.

All of the truss members and approximately 90 percent of the roof deck appear to be original to the structure. Replacement deck boards are typically 1 x 6 tongue-and-groove boards and appear to be associated with repairs to address areas of previous moisture infiltration. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 25) C. Description of Interior: 1. Floor Plans: The interior of the Mine Loading Building consists of a single open space. A sketch plan of the building (Figure shows a 33 x 7 tank in the northwest corner. 2. Stairways: There are no interior stairways. 3. Flooring: The floor throughout the room is concrete. A pair of rails extends along the center of the building, entering the building through the southwest doors and continuing to the northeast wall.

The steel rails are approximately 36 apart. At the west end of the room, an automobile lift is mounted to the floor between the rails. A J-shaped, 18 -wide slab extends approximately 1/2 above the main floor slab. It extends from the northeast wall approximately 35 , with a 6 return toward the northwest wall. A 3 -tall concrete curb along the inside face of the exterior wall is present in this area. As shown on the sketch plan for the building in the Report of Completed Works (Figure B.9 this raised slab and curb originally supported a tank structure. 4. Wall and Ceiling Finish: The brick wall is exposed on the interior. In general, the interior face of the wall has the same general characteristics, such as brick size, bond pattern, and mortar joint profile, as the exterior face.

However, all of the window and door openings have steel lintels supporting the two inner wythes of masonry, instead of the segmental arches on the exterior wythe. The ceiling in the Mine Loading Building consists of plywood nailed to the bottom chord of the wood roof trusses. Wood battens cover the joints between adjacent pieces of plywood. A small opening in the plywood ceiling near the west corner of the building provides access to the attic. The exposed brick masonry is laid in five-course American bond. Over the windows on the southeast and northwest walls of the building, corbelled bricks near the top of each wall support the track of a two-ton traveling crane. The corbel is composed of nine courses of brick that extend a total of 7 from the face of the wall.

The top course of brick, which is cream colored, consists entirely of headers. Above the corbelled brick on the northwest and southeast walls are thick steel plates, approximately 7 x 3 in size. The plates, which are spaced 16 to 20 apart, extend into the brick wall and support a single steel rail. 5. Openings: FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 26) a. Doorways and Doors: There are no interior doors. b. Windows: Windows are present on each wall of the building. Two windows flank either side of the door at the center of the southwest wall. Five windows line the northwest wall, while three windows are present along the northeast wall. One window is present on either side of the door at the center of the southeast wall.

The windows in the building are generally two- over-two, wood double-hung sash windows. The exceptions are the windows on the southwest wall, which are one-over-one, wood double-hung sash windows. Each window has an operable counterbalanced weight system with a rope sash chord, and the interior face of some of the glazing units have a non-historic window film to reduce solar glare. Although the window and door openings are topped by segmental arches on the exterior of the building, they have steel lintels to support the two interior wythes of masonry, and no interior arches are present. A non-historic stainless steel lintel, installed in is present over the door on the southeast wall. Flat painted wood trim approximately 5 wide is present at the head and jambs of the windows.

Trim at the head of the windows on the northwest and southeast walls is approximately 3 wide to accommodate the corbelled brickwork above. The window sill consists of a wood stool that extends approximately 6 from the lower sash and wraps around the trim at the window jamb. An approximately 4 -tall wood apron sits below the stool. 6. Decorative Features: The upper portion of two interior walls feature red brick corbels with a cream-colored top course of brick. 7. Hardware: Door and window hardware is coated steel that has been recently installed. 8. Mechanical Equipment: A two-ton traveling crane inside the building is supported on corbelled bricks near the top of each wall.

Above the corbelled brick on the northwest and southeast walls are 3/4 -thick steel plates, approximately 7 x 3 in size. The plates, which are spaced 16 to 20 apart, extend into the brick wall and support a single steel rail. Two wheels, which are part of the crane assembly, move along each of the rails. The wheeled crane bases support a steel cross beam that spans the width of the building FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 27) Ca. new electrical service, electrical conduit, receptacles, and fluorescent ceiling-mounted lights were installed. D. Site Information: 1.

Historical Landscape Design: The Mine Loading Building is part of a functional area known as the Engineers Wharf and Landing (formally known as Fort Pickens, Ferry Landing Area, HALS which supported the mine defense operations at Fort Pickens in the late nineteenth and early twentieth centuries. The Mine Loading Building is part of a cluster of mine support structures, which included a mine storeroom, cable tank building, mine casemate (which was in Fort Pickens), and narrow gauge rail system. Three buildings Mine Loading Room, Mine Storeroom, and Engineers Storeroom are the only remaining components, in addition to remnants of the narrow gauge track and foundation of the Cable Tank Building.

The three buildings and a new shelter are located south of the north seawall, approximately 500 north of historic Fort Pickens and approximately 700 east of the present-day museum. The structures share a sand- covered site defined by an asphalt-paved surface lot to the southwest, paved access roads to the west and south, and thickly-vegetated wetland to the east. Along the north boundary of the site and parallel to the road is a concrete seawall, extending 5 above grade. Immediately north of the site, a non-historic concrete ramp ascends and crosses over the seawall to provide access to a non-historic wood-framed pier. The topography of the site is relatively flat, with a slight depression approximately 2 deep, at the center of which the mine support structures are located. 2.

Outbuildings: There are no outbuildings. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 28) PART III. SOURCES OF INFORMATION A. Architectural drawings There are no known extant original or pre-2016 drawings. B. Photographs/Site Plans Photographs and site plans included in this report were all obtained from the July Historic Structures Report. The original sources of the photographs and site plans are the following: National Archives, Washington Fort Pickens Site Plan NPS Drawing No. Army Map D1, Fort Pickens, November NPS Drawing No. 635-61263A Sketch Plan, NPS Drawing No. Gulf Islands National Seashore, Gulf Breeze, FL Fort Pickens Site Plan Aerial View of Fort Pickens Catalog No.

525 Mine Loading Room, Report of Completed Works, Seacoast Fortifications, Coast Defenses of Pensacola, Florida, Aerial View of Fort Pickens, Catalog No. 626 Photo of Engineers Wharf Area, Ca. Catalog No. 956 State Archives of Florida, Florida Memory Photo of Mine Loading Building, Ca. Catalog No. The photo is also in the GUIS collection, numbered Catalog No. C. Pers. Comm. with David Ogden, Historian, Cultural Resources Program Manager, Gulf Islands National Seashore, April and May D. Selected Sources Bearss, Edwin C., Historic Structure Report and Resource Study: Pensacola Defense Project, Florida Unit, March FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 29) Berhow, Mark E.

editor, American Coast Defenses: A Reference Guide, published by the Press, Wiss, Janney, Elstner Associates, Inc., Gulf Islands National Seashore, Fort Pickens Mine Support Structures: Historic Structures Report: Fort Pickens, July Wiss, Janney, Elstner Associates, Inc., Harbor Defense Project, Defenses of Pensacola Historic District, National Register nomination, Section 8, July 31, (Draft). FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 30) PART IV:

Supplemental Material

Appendix A: Reduced Copies of Measured Drawings FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 31) Appendix B: Historic Images and Site Plans FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 32) Figure Diagram showing Colonel Henry L. Abbot s system of mine arrangement. From Berhow, American Seacoast Defenses: A Reference Guide, page FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 33) Figure Diagram of typical arrangement of mines in the harbor and shore facilities From Berhow, American Seacoast Defenses: A Reference Guide, page The arrangement of the shore facilities varied at each facility. FORT PICKENS, MINE LOADING BUILDING HABS No.

FL-604-A (Page 34) Figure Plan of the Fort Pickens area; the Engineers Wharf area is at the bottom left hand corner within the circled area. The drawing is oriented with south at the top and north at the bottom. Source: Gulf Islands National Seashore. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 35) Mine Loading Building Figure Detail of Plan, showing the Engineers Wharf area, with Mine Loading Building marked. The drawing is oriented with south at the top. Source: Gulf Islands National Seashore. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 36) Figure Plan of Fort Pickens. Plan is oriented with north at the top. Engineers Wharf area circled in black. Source: NPS Drawing No. FORT PICKENS, MINE LOADING BUILDING HABS No.

FL-604-A (Page 37) Figure Detail of plan of Fort Pickens. Heavy black line indicates the concrete seawall. Mine Loading Building is cirlcled in black. Plan is oriented with north at the top. Source: NPS Drawing No. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 38) Figure Aerial view of the site, facing south, Source: Gulf Islands National Seashore, Catalog No. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 39) Figure Detail of aerial photograph, facing south. Although somewhat blurry, the image shows the narrow gauge railroad that is elevated over the seawall, the Mine Loading Building (circled in black) and Engineers Storeroom on the right hand side of the track and the Mine Storeroom and Cable Tank Building on the left. The area, mostly occupied by U.S.

Engineers buildings, appears to have an elevated passage between a building north, and one northeast, of the Mine Loading Building and a surface-level sidewalk between the latter building and the U.S. Engineers Office. Source: Gulf Islands National Seashore. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 40) Figure report on Mine Loading Room (sic), Report of Completed Works, Seacoast Fortifications, Coast Defenses of Pensacola, Florida. Source: Gulf Islands National Seashore. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 41) Figure Aerial view of the site, facing south, December Source: Gulf Islands National Seashore, Catalog No. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 42) Figure Enlarged view of photograph, facing south.

The Mine Loading Building is circled in black. Source: Gulf Islands National Seashore, Catalog No. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 43) Figure Army map D1 of Fort Pickens, November The Mine Loading Building is marked as number 17 on this plan and identified as the R. R. Shop. Also nearby, as shown on this map, is the Mine Storehouse as well as the now demolished water tank, warehouse, and tool house. Source: NPS Drawing No. 635-61263A. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 44) Figure Enlarged view of Engineers Wharf Area/Ferry Landing Area, Army map D1 of Fort Pickens, November Building 15, the Mine Loading Building, is marked as number 17 on this plan and identified as the R. R. Shop.

Building 16, the Mine Storeroom, is marked as number 18 on this plan and identified as the Mine Storehouse. Building 17, the Engineers Storeroom, is indicated as number 20. Also nearby, as shown on this map, were a pumphouse, a water tank, and a warehouse (number all now removed except for the pumphouse (number 21).The narrow guage railroad that led to the wharf and the wharf itself, are not shown, presumably indicating their non-function. The railroad track was scrapped and removed in according to David Ogden, Gulf Islands National Shore. Source: NPS Drawing No. 61263A. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 45) Figure A view of the site, facing north, ca The Mine Loading Building is second from right and Mine Storeroom is furthest right.

Note that several of the adjacent structures visible in earlier aerial views have been demolished. The building on the left, a pumphouse built in is extant. Source: Gulf Islands National Seashore, Catalog No. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 46) Figure photograph of Mine Loading Building. Source: Gulf Islands National Seashore. FORT PICKENS, MINE LOADING BUILDING HABS No. FL-604-A (Page 47) Figure NPS sketch plan showing historic structures at Fort Pickens with their then- current maintenance functions and later annotations. Ferry Landing Area is at top right, circled in black. Building Number 17 is the Engineers Storeroom, Number 15 is the Mine Loading Room, and Number 16 is the Mine Storeroom. The hatched area adjacent to it is the surface parking lot.

Source: NPS Drawing No.

In context

Pensacola Beach, Florida The place record: every map, photograph and survey of this town.
Escambia County, Florida 120 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Pensacola Beach

2 records

The federal surveyors worked through Pensacola Beach building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Fort PickensHABS FL-604-B11,743 words
Fort PickensHALS FL-223,910 words

Provenance

  • Written history. Quoted verbatim from HABS FL-604-A. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.