Fort Pickens, Ferry Landing Area, 1400 Fort Pickens Road, Pensacola Beach
Fort Pickens, Ferry Landing Area, 1400 Fort Pickens Road, Pensacola Beach, Escambia County, FL. Surveyed as HALS FL-22, with a 3,910-word written history.
From the record
“The Ferry Landing Area is associated with late nineteenth and early twentieth century activities conducted by the U.S.”
Written record, HALS FL-22 survey. Machine-read text.
Surveyed by the federal HALS program as HALS FL-22 · the record runs 3910 words · one of 133 surveyed structures published for this county.
Source document
Quoted word for word from HALS FL-22.
Not written, edited or summarised by this site.
The Ferry Landing Area is associated with late nineteenth and early twentieth century activities conducted by the U.S. Army to protect the strategically-important Pensacola Harbor using Endicott batteries and underwater mine technology. The area is significant for its association with Fort Pickens and contains the surviving features related to the early twentieth century defensive mines in the harbor. Description: The Ferry Landing Area is located at the northwest corner of the Fort Pickens unit of the Gulf Islands National Seashore. The area includes Building 15 (the Mine Loading Building; HABS No. FL-604-A); Building 16 (the Mine Storeroom; HABS No. Building 17 (ca.
Engineers Storeroom), the plaza area, the foundation of a building south of Building 16 (former Cable Tank Building, rebuilt and a portion of the seawall north of Building 16 and Building 17 at the ferry landing. It does not include the adjacent surface parking lot. The cluster of structures is arranged in a north-south linear pattern on both sides of a mostly non-extant narrow gauge railroad that led to the wharf. The cluster includes three extant early twentieth century buildings and the foundation remnants of a former Cable Tank building. They are located south of the north seawall, approximately 500 north of historic Fort Pickens and approximately 700 east of the present-day museum.
The structures share a sand-covered site defined by an asphalt-paved surface lot to the southwest, paved access roads to the west and north, and shrub-covered dunes to the east. Along the north boundary of the site and parallel to the road is a concrete seawall, extending 5 above grade on the south, interior, side. Views from the Ferry Landing Area include those currently to the northwest, north, and northeast of the Pensacola Naval Air Station (PNAS), with the PNAS docks to the northeast and Pensacola Bay beyond that. Fort Barrancas is visible to the northwest. FORT PICKENS,
Ferry Landing Area Hals
No. (Page 2) Historically the view was very similar, except the naval base was confined mainly to the northeast, with the town of Woolsey, Fort Barrancas army post, and Fort Barrancas itself all successively located to the west of the naval base. The Ferry Landing Area s view to the south has historically always been dominated by Fort Pickens. At the northern end of the site, a non-historic concrete ramp ascends and crosses over the seawall to provide access to a non-historic wood-framed pier. The topography of the site is relatively flat, with a slight depression approximately 2 deep, at the center of which the mine support structures are located.
In addition to the four structures, the site features a network of concrete sidewalks that extend from the asphalt-paved surface lot to the break in the seawall and pier at the north end of the site. The main portion of the sidewalk extends northeast- southwest through the site and separates the Mine Loading Building from the Mine Storeroom. A 20 -long section of steel rail track extends from the main entrance on the southwest elevation of the Mine Loading Building. The track consists of two parallel 3 -wide steel rails, approximately 4 apart, which are set in a concrete apron at the entrance to the building. A metal telecommunications tower, approximately 50 tall, is located between the Mine Loading Building and the Engineers Storeroom.
The Ferry Landing Area is located on the northern side of the island where a succession of wharves has historically been sited since the early nineteenth century, its close proximity and direct access to Fort Pickens major factors in its location. Despite the loss of a small number of buildings since the early to mid- twentieth century, the former Cable Tank Building represented only by a partially extant foundation, and the recent additions of a shelter, telecommunications structure, and concrete ramp nearby, the area still retains physical integrity. History1: As early as the first of several wharves or piers was constructed along the north side of Santa Rosa Island.
In November with construction of Fort Pickens scheduled to commence the following year, work began on a wharf at Santa Rosa Island. By January three wharves had been built on the island, including one on the bay near the future site of Fort Pickens. The fort structure was completed in A year later, all of the structures at the wharf were removed, except for the wharf itself.2 1 This report is largely based on the Historic Structures Report for the Mine Loading Building and the Mine Storeroom that are within the Ferry Landing Area. The report, prepared by Wiss Janney Elstner, Associates, Inc., was completed in July VHB edited the text and reformatted for this report. The footnotes refer to the not the footnotes within the 2 Wiss Janney Elstner, Associates, Inc.
Gulf Islands National Seashore: Fort Pickens Mine Support Structures. Historic Structures Report: Fort Pickens, July 16. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 3) A new permanent wharf was built in but then was rebuilt after the Civil War in as part of a rebuilding effort in this area north of Fort Pickens. By the the wharf was showing significant signs of deterioration.
Despite numerous requests to build a new wharf and to make other repairs to the fort, funding for this work was consistently declined.3 Due to their state of deterioration by the early funding for repairs to several coastal brick and masonry forts including Fort Pickens, was discontinued in The lack of funding continued at Fort Pickens until when the Board of Engineers recommended that the defense of Pensacola Bay should be enhanced. At this time, as part of the Endicott plan to modernize the United States coastal defense system, construction of a mine support casemate at Fort Pickens was approved.
In support of the project, plans were made in to rebuild the Engineers Wharf near Fort Pickens, which had fallen into a state of disrepair, and to build a narrow gauge rail line that would facilitate the movement of ordnance and materials to the construction sites. Although the mine support casemate was completed in work on the wharf did not commence until Construction of both the wharf and of narrow gauge railroad track were completed in July Several components were necessary to properly implement the Endicott System for submarine mine defense. Typically, a mine wharf contained a large work surface area on a pier. A tramway often connected the wharf to the loading room. Mine storerooms were used to store dissembled mine equipment as well as tools and equipment.
Movable overhead hoists were often present as well to assist in moving equipment, ropes, chains, tools, and appliances. The mine loading buildings were used to assemble the mine components as well as for testing for water tightness before the mines were sent out to the wharf. A small cable test tank and overhead hoists were often present in the mine loading buildings. The concrete cable tanks were used to store the mine cables in fresh water to prevent deterioration.5 As part of the Endicott System improvements to the Pensacola Bay defenses at Fort Pickens, a series of new structures was constructed along the narrow gauge railroad connecting the new wharf to the fort by including a brick mine storeroom and conversion of a boarding house for a mine loading building.
The railroad was also expanded at this time, with two additional spurs added to the 3 Wiss Janney Elstner, Associates, Inc. Gulf Islands National Seashore: Fort Pickens Mine Support Structures. Historic Structures Report: Fort Pickens, July 17. 4 Ibid, 13, 17. 5 Ibid, 17. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 4) western side of the wharf.6 On June 20, the powder magazine in the northeast bastion of the fort exploded. The explosion reportedly hurled bricks to Warrington on the other side of the bay and left the mine defense facilities adjacent to the wharf, including the mine loading building and the mine storeroom, heavily damaged. The cable tank shed, windmill, and traveling crane were also wrecked.
Both doors to the mining casement at Fort Pickens were wrenched off their hinges, with one shattered.7 The mine storeroom was soon demolished, except for its foundations, which remained. The mine loading building was also demolished at this time.8 On July 22, was allocated for the reconstruction of the mine storeroom. A new Mine Storeroom, constructed on the foundation of the former storeroom, was completed by June and transferred to the Artillery on May 27, The new building was identical to the destroyed storehouse with portions of the original two-ton traveling crane, shutters, and doors salvaged and reused.
A corrugated iron roof was used on the new Mine Storeroom in place of the slate roof used on the original building.9 A new Mine Loading Building was not completed until June The 22 x 45 building was constructed for and was built in accordance with the Corps of Engineers standard plans for this type of structure. The walls were brick, and the roof was covered with sheet metal. A two-ton traveling crane was included on the interior, as well as a tank measuring 7 -0 x 33 -0 .10 Other repairs made at the same time to the damaged mine facilities included a new windmill, built utilizing the same design as the first, and the Cable Tank Building rebuilt to a slightly larger size.
The doors to the mining casement were also replaced.11 An Engineer Storeroom, just north of the Mine Loading Building, was built between and Originally labeled a Service Storeroom, it was known as the Engineer Storeroom by Roughly 20 x 62 in size, the saddle-back hipped roof structure was constructed of concrete blocks with a smooth concrete exterior finish. Following a hurricane in was allocated to repair the defenses located in and around Pensacola, with almost all of the funds spent at Fort 6 Ibid, 17, 18. 7 Bearss 185 8 Wiss Janney Elstner Associates, 18. 9 Ibid, 18. 10 Ibid, 18. 11 Bearss, 187 188 FORT PICKENS, FERRY LANDING AREA HALS No. (Page 5) Pickens.
At this time, an 11 -tall concrete seawall (5 above grade) was proposed to help protect the fort and adjacent structures from future storms. Construction began in after was allocated for the wall.12 A plan from (Figures B.1 and shows the full array of buildings arranged along the narrow gauge railroad that led to the wharf. Although the map does not identify the buildings, except for the label U.S. Engrs. (sic) Buildings, the cluster included the newly rebuilt mine buildings and the recently completed seawall (the latter shown in dashed lines). Another hurricane struck Fort Pickens on August 11, destroying most of the superstructure of the Engineers Wharf, leaving only the pilings.
Just over a year later, in September the wharf, presumably rebuilt within the past year, was again destroyed by a hurricane, again only the pilings remained.13 Taken soon after the hurricane, an aerial photograph from (Figures B.5 and provides the earliest, most detailed visual information about the appearance of the area, although the more detailed view shown in Figure B.6 is not very clear. The image shows the major gable-roofed buildings arranged longitudinally next to the narrow gauge railroad, which is elevated over the seawall to the wharf, an elevated walkway connecting two U.S. Engineers buildings on the east side, scrub vegetation in the southern area14, and what appears to be patched areas on the roof on the Mine Storeroom.
Following another major hurricane in which again severely damaged the wharf, Mine Storeroom, and Engineers Storeroom,15 the Army eliminated the submarine mine defense system from its harbor defense project for Pensacola Bay, with the Navy taking over responsibility for underwater defense of the area. By another aerial view depicts an actively used area, although the mine support buildings were not used in their original capacity, by this date. The aerial view (Figures B.8 and shows several square garden plots south of the Engineers Office, a walkway to an unidentified building within the area, and the elevated narrow gauge railroad with power lines paralleling it on both sides. All of the buildings shown in the aerial view are present in this photograph.
In the responsibility for maintenance and repair of the buildings in the Ferry Landing Area was transferred to the Quartermaster Department from16 the 12 Wiss Janney Elstner Associates, 18, 19. 13 Ibid, 249 The superstructure was presumably rebuilt after the hurricane, as only the pilings were left. 14 Periodic salt water over washes (about every 10 20 years on average) kill much of the vegetation throughout the area except for the hardier species (mostly grasses, sabal palms, live oaks, and since the or so, introduced oleander. Some trees were lost in the area east of the mine support buildings in (email message from David Ogden, Gulf Islands National Seashore, September 23, 15 Bearss, 251 16 The new uses for the mine support structures after are unknown.
FORT PICKENS, FERRY LANDING AREA HALS No. (Page 6) Corps of Engineers. A map (Figures and indicates that the buildings in the Ferry Landing Area were used for repair shops and storage.17 It appears that the U.S. Engineers office, quarters, and mess hall were removed by this date, as they are not indicated on the map. Fort Pickens remained an active military installation until During World War II, long-range bombers, improved sea-borne assault tactics, guided missiles, and the atomic bomb had rendered the defenses at Fort Pickens obsolete.
Fort Pickens was closed in after 118 years of service.18 Many of the buildings in the immediate area were demolished by with only the Mine Loading Building, Mine Storeroom, Engineers Storeroom, and a warehouse on the west side of the railroad retained (Figures and The railroad track was sold for scrap and removed by . The property was transferred to the State of Florida in An Act of July 2, (62 Stat. authorized the establishment of Pensacola National Monument, to include approximately thirteen acres encompassing Fort San Carlos de Barrancas, Fort Redoubt, and Fort Pickens. In Fort Pickens became part of the Florida State Park system.
Although primarily used for storage and maintenance, it appears, based on photographs, that the historic military use of the mine support buildings was interpreted for visitors during the era of Florida State Parks management.20 In the fort and the western 7 miles of Santa Rosa Island became part of a newly formed unit of the National Park System known as Gulf Islands National Seashore. The mine loading buildings continued to be used for storage and maintenance service functions (Figure The three remaining buildings (the Mine Loading Room, Mine Storeroom, and Engineers Storeroom) were not joined by additional structures until the construction of a pavilion, new ramp and pier, and telecommunications structure in the last five years.
The area will become an interpretive and visitor services area for a new ferry, including the re- use of two of the former mine support structures.21
Sources
262 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HALS FL-22.
Not written, edited or summarised by this site.
Photographs/Site Plans: Photographs and site plans included in this report were all obtained from the July Historic Structures Report or directly from the Gulf Islands National 17 Wiss Janney Elstner Associates, 19, 20. 18 Ibid, 19. 19 David Ogden, personal communication to Rita Walsh, VHB 20 Ibid, 16. The photographs, which are not included in this report due to copyright, show visitors at the buildings open entrances listening to what appears to be a park ranger. 21 Ibid, 16. FORT PICKENS,
Ferry Landing Area Hals
No. (Page 7) Seashore. The original sources of the photographs and site plans are the following: National Archives, Washington Fort Pickens Site Plan NPS Drawing No. Army Map D1, Fort Pickens, November NPS Drawing No. 635-61263A Sketch Plan, NPS Drawing No. Gulf Islands National Seashore, Gulf Breeze, FL Fort Pickens Site Plan, Aerial View of Fort Pickens Catalog No. 525 Mine Loading Room, Report of Completed Works, Seacoast Fortifications, Coast Defenses of Pensacola, Florida, Army Map D1, Fort Pickens, June Aerial View of Fort Pickens, Catalog No. 626 Aerial View of Fort Pickens, Catalog No. 626 Photo of Engineers Wharf Area, Ca. Catalog No.
956 Selected Bearss, Edwin C., Historic Structure Report and Resource Study: Pensacola Defense Project, Florida Unit, March Ogden, David, Cultural Resources Program Manager, Gulf Islands National Seashore, personal communications to Rita Walsh, Wiss, Janney, Elstner Associates, Inc., Gulf Islands National Seashore: Fort Pickens Mine Support Structures. Historic Structures Report: Fort Pickens, July Wiss, Janney, Elstner Associates, Inc., Harbor Defense Project, Defenses of Pensacola Historic District. National Register nomination, Section 8, July 31, (Draft).
Written history
1045 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HALS FL-22.
Not written, edited or summarised by this site.
Wiss, Janney, Elstner Associates, Inc. 330 Pfingsten Road Northbrook, IL FORT PICKENS,
Ferry Landing Area Hals
No. (Page 8) Edited by Rita Walsh, Senior Preservation Planner VHB 101 Walnut Street Watertown, MA February Project Information This recording project was undertaken by the National Park Service Southeast Region SER) and Gulf Islands National Seashore as one of the mitigation measures mutually agreed upon in the Memorandum of Agreement between the NPS and the Florida Division of Historical Resources (SHPO). The NPS proposes to modify and rehabilitate the Mine Storeroom in support of a new ferry service for the western end of Santa Rosa Island. In addition to the Level II written documentation, the report includes CAD drawings of the floor plan and large format photographs of the exterior and interior.
The written documentation is based on information provided in a July Historic Structures Report for the Fort Pickens Mine Storeroom and Mine Loading Building (HABS No. A) and the draft National Register n ination for The Harbor Defense Project, Defenses of Pensacola Historic District, as well as other sources provided by the Gulf Islands National Seashore staff in their files. The written documentation was edited from these documents by Rita Walsh, Senior Preservation Planner of Watertown, MA. The photographs were taken in April by Travis Fulk, SEARCH, Inc. of Springfield, VA. The CAD drawings were prepared by Laurel Bartlett, SEARCH, Inc. of Newberry, Florida. The report was completed in February FORT PICKENS, FERRY LANDING AREA HALS No.
(Page 9) Appendix A Reduced Copy of Measured Drawing FORT PICKENS, FERRY LANDING AREA HALS No. (Page 10) Appendix B Historic Images and Site Plans FORT PICKENS, FERRY LANDING AREA HALS No. (Page 11) Figure Plan of the Fort Pickens area; the Ferry Landing Area is within the circled area at the bottom left hand corner. The drawing is oriented with south at the top and north at the bottom. Source: Gulf Islands National Seashore. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 12) Cable Tank Building Mine Storeroom U.S. Engineers Mess Hall U.S. Engineers Quarters Mine Loading Building U.S. Engineers Office U.S. Engineers Storeroom Figure Detail of Plan, showing the Engineers Wharf area, circled in black on Figure The drawing is oriented with south at the top.
The functions of the buildings are based on a map (see Figure as the plan does not present this information. Source: Gulf Islands National Seashore. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 13) Figure Plan of Fort Pickens. Plan is oriented with north at the top. Ferry Landing Area is circled in black. Source: NPS Drawing No. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 14) Figure Detail of plan of Fort Pickens. Heavy black line indicates the concrete seawall. Plan is oriented with north at the top. Source: NPS Drawing No. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 15) Figure Aerial view of the site, facing south, Source: Gulf Islands National Seashore, Catalog No. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 16) Figure Detail of aerial photograph, facing south.
Although somewhat blurry, the image shows the narrow gauge railroad that is elevated over the seawall, the Mine Loading Building and Engineers Storeroom on the right hand side of the track and the Mine Storeroom and Cable Tank Building on the left. The area, mostly occupied by U.S. Engineers buildings, appears to have an elevated passage between a building north, and one northeast, of the Mine Loading Building and a surface-level sidewalk between the latter building and the U.S. Engineers Office. Source: Gulf Islands National Seashore. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 17) Figure Detail of D1 map, facing north. The labeled buildings in the area are (north to south): 16 U.S. Engineers Office, 17 U.S. Engineers Quarters; 18 U.S.
Engineers Mess Hall, LR Loading Room; 9 Mine Storeroom, CT Cable Tank Building. The entire map was not included as it was not legible at this size. Source: Gulf Islands National Seashore. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 18) Figure Aerial view of the site, facing south, December Source: Gulf Islands National Seashore, Catalog No. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 19) Figure Enlarged view of photograph, facing south. Source: Gulf Islands National Seashore, Catalog No. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 20) Figure Army map D1 of Fort Pickens, November Ferry Landing Area is circled; identification of buildings in the area are shown on Figure Source: NPS Drawing No. 61263A. FORT PICKENS, FERRY LANDING AREA HALS No.
(Page 21) Figure Enlarged view of Ferry Landing Area, Army map D1 of Fort Pickens, November Building 15, the Mine Loading Building, is marked as number 17 on this plan and identified as the R. R. Shop. Building 16, the Mine Storeroom, is marked as number 18 on this plan and identified as the Mine Storehouse. Building 17, the Engineers Storeroom, is indicated as number 20. Also nearby, as shown on this map, were a pumphouse, a water tank, and a warehouse (number of which only the pumhouse (number 21) is extant. The narrow guage railroad that led to the wharf and the wharf itself, are not shown, presumably indicating their non-function. Source: NPS Drawing No. 635-61263A. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 22) Figure A view of the site, facing north, ca.
The Mine Loading Building and Mine Storeroom are at right, with the former second from right and the latter on far right. The building on the left is the building identified as pump house & plant on the plan shown in Figures and and is extant. Note that several of the adjacent structures visible in earlier aerial views, as well as the narrow gauge railroad between the Mine Loading Building and the Mine Storeroom, have been removed (Figures and Source: Gulf Islands National Seashore, Catalog No. FORT PICKENS, FERRY LANDING AREA HALS No. (Page 23) Figure NPS sketch plan showing historic structures at Fort Pickens with their then- current maintenance functions and later annotations. Ferry Landing Area is at top right.
Building Number 17 is the Engineers Storeroom, Number 15 is the Mine Loading Room, and Number 16 is the Mine Storeroom. The hatched area adjacent to it is the surface parking lot. Source: NPS Drawing No.
The federal surveyors worked through Pensacola Beach building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HALS FL-22. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.