Georgia Power Company owns and operates the Bartletts Ferry Project under license to the Federal Energy Regulatory Commission (FERC). This project was undertaken due to the proposed removal of the two original gantry cranes, which are considered character-defining features of Bartletts Ferry. Under the guidance and procedures stipulated in the Bartletts Ferry Historic Properties Management Plan, Georgia Power Company sponsored this documentation effort in consultation with the Georgia State Historic Preservation Office. Brockington and Associates, Inc., prepared the history documentation and Mr. William M. Brockenbrough completed the large- format photography. BARTLETTS FERRY HYDROELECTRIC PROJECT, GANTRY CRANES HAER No. GA-166-A (Page 3)
The development of the Bartletts Ferry hydroelectric facility reflects the increasing demand for electric power in Georgia and the continuing advancements in hydroelectric technology in the early twentieth century. Bartletts Ferry was developed during a period of standardization after World War I, when eastern-style configurations of vertical single-runner Francis-type reaction turbines became common in most new low and medium head plants and were being introduced in high head applications as well.
Bartletts Ferry is a reflection of this trend toward hydroelectric plant standardization as well as the corporate consolidation and interconnection among utilities.1 Bartletts Ferry was developed by the Columbus Electric and Power Company during a period when locally-oriented utility companies were undertaking hydro power developments in central and south Georgia. Bartletts Ferry, as well as the nearby Goat Rock facility, were constructed by Stone and Webster, the largest consulting engineering and management firm in the hydroelectric business during the first quarter of the twentieth century.
The project features engineering and design elements commonly associated with hydroelectric plants constructed between and Bartletts Ferry is currently owned and operated by the Georgia Power Company, which is of particular significance because it is closely tied to the growth of Atlanta, one of the South s largest cities. The earliest antecedents to present-day Georgia Power Company were formed in Atlanta in the second half of the nineteenth century through alliances between local developers and northern investors. Early utility companies supplied street lighting, rudimentary household utilities and, most importantly, railway and transit services that were emerging as primary users of electricity in urban areas.
Coal-fired steam turbines supplied the earliest electricity until when the Georgia Railway and Electric Company developed a hydroelectric facility at Morgan Falls, northwest of Atlanta on the Chattahoochee River.
In the newly formed Georgia Railway and Power Company planned development of five projects (Burton, Nacoochee, Terrora, Tugalo, and Yona) on the Tallulah and Tugalo Rivers in north Georgia.2 The Georgia Railway and Power Company s transmission system grew extensively during this time, so that by its power supply was interconnected with that of Alabama Power Company, Tennessee Power Company, Southern Power Company (predecessor of Duke Energy), Central Georgia Power Company, and the Columbus Electric and Power Company.3 The company also grew through consolidation with local utilities throughout the state, culminating in with the formation of present-day Georgia Power Company.4 Until the Great Depression, the company continued to expand its generation and distribution system and service territory through mergers 1 For a detailed synthesis of industry trends, see Duncan P.
Hay, Hydroelectric Development in the United States, in two volumes (Washington, DC: Edison Electric Institute, For additional detail on Bartletts Ferry, see Michael Reynolds, Bartletts Ferry Project: Historic Hydro-Engineering Report, Harris County, Georgia and Lee County, Alabama (FERC (Atlanta, Georgia: Brockington and Associates, Inc., December Report prepared for the Georgia Power Company in support of FERC relicensing. 2 Georgia Railway and Power Company, Georgia Railway and Power Company (Manuscript on file, Georgia Power Corporate Archives, Atlanta, 1. 3 Wade H. Wright, History of the Georgia Power Company, (Atlanta: Georgia Power Company, 4 Wright, Georgia Power, BARTLETTS FERRY HYDROELECTRIC PROJECT, GANTRY CRANES HAER No.
GA-166-A (Page 4) and consolidations with independent and municipal utilities, acquiring in the process several existing hydroelectric plants along the Chattahoochee River near Columbus, including Bartletts Ferry.5
The Bartletts Ferry Project was a product of the Columbus Electric and Power Company. The company was established after the Columbus Railroad Company bought the Columbus Power Company on April 20, The Columbus Power Company had already completed and was operating the Goat Rock hydro facility (completed located on the Chattahoochee River 13 miles south of the Bartletts Ferry site and approximately 12 miles north of Columbus, Georgia. However, the company found that it needed more capacity as the demand for electric power grew in the region.
It was not only to obtain the maximum benefit of its generating capacity, but also was to increase the output of the company s existing stations downstream.6 To design and construct Bartletts Ferry, the Columbus Electric and Power Company hired Stone and Webster, Inc., of Boston, Massachusetts, one of the largest consulting engineering and management firm in the hydroelectric business during the first quarter of the twentieth century. Stone and Webster had also designed the downstream Goat Rock facility and became well-known in the design and construction supervision of larger projects.7 For the Bartletts Ferry project, Stone and Webster hired Charles T. Main as the consulting engineer. Main began his career in the New England textile industry and became a prominent industrial engineer.
In addition to forming his own consulting firm, Main also contracted with companies such as Stone and Webster on specific projects. The superintendent in charge of the hydro-electric work at Bartlett s Ferry was Branch.8 Construction of the facility began in with reservoir site preparation and workers were housed in a segregated camp on the west side of the Chattahoochee River in Alabama. Materials were transported to the site via rail cars and then by steel derricks. Once workers completed a long coffer dam, construction of the concrete gravity dam and powerhouse structure began.9 The facility was designed for four generating units, each with a capacity of kW. Only two units were initially installed, but the powerhouse was designed with adequate space to accommodate the additional units.
The three-story brick powerhouse has a flat tar and gravel roof supported by steel roof trusses over the generator room. The water wheels, governors, oiling systems and appurtenances were supplied by the S. Morgan Company of York, Pennsylvania. The generating units are of the single-run vertical types and have riveted scroll cases. Each wheel was guaranteed to develop hp when operating at full efficiency under a head of 112 . The vertical generators were furnished by the 5 Wright, Georgia Power, 6 Hageman, H.A. and Parker, The Bartletts Ferry Hydroelectric Development, Stone and Webster Journal, Volume 38 7 For more on Stone and Webster, see Hay, Hydroelectric Development, 8 Hageman, H.A.
and Parker, Bartletts Ferry, Also, Bartletts Ferry Cofferdam Unwatered, Stone and Webster Journal, Volume 36 For more on Charles T. Main, see Hay, Hydroelectric Development, 9 Reynolds, Bartletts Ferry, BARTLETTS FERRY HYDROELECTRIC PROJECT, GANTRY CRANES HAER No. GA-166-A (Page 5) Westinghouse Electric and Manufacturing Company. Water feeds into the generating units via four steel-plated penstocks measuring 15 in diameter and 300 long.10 When completed, the gravity dam stretched long, which included 634 feet of concrete spillway, 92 of concrete intake structure, and the remainder was an earthen embankment.
The concrete gravity portion included 19 tainter gates, 2 skimmer gates, and a battery of 4 siphon spillways.11 The gates are raised and lowered by two, specially built gantry cranes, discussed in further detail in the following section. The first generating unit at Bartletts Ferry went online on January 25, followed by a second unit on February 26, A third unit began operation on September 11, In the Commonwealth and Southern Corporation acquired control of the Columbus Electric and Power Company through stock ownership. At the time, it already owned common stock ownership of the Georgia Power Company. On August 5, supervision of the Columbus Electric and Power Company was turned over to the Georgia Power Company.
The supervision continued until June 26, when the companies consolidated under the Georgia Power name.12 At the time of its consolidation with Georgia Power, the Columbus Electric and Power Company already owned all of the properties of the South Georgia Power Company and was supplying retail electrical power to the City of Columbus and 54 other municipalities and communities in south Georgia. The company also supplied wholesale power to the cities of Albany, LaGrange, and West Point.13 Few changes were made to Bartletts Ferry from the Great Depression through World War II. However, from through a number of changes and upgrades were made.
These included the extension of the powerhouse to the west to make room for a fourth generator unit, the strengthening of the main spillway section of the dam with large reinforced concrete buttresses, the raising of the earthen dike embankments and the strengthening and extension of the concrete retaining walls east and west of the spillway with the additional reinforced concrete. Some of this work was performed by the Hardaway Construction Company of Columbus, Georgia. The installation of a fourth generator unit also required the addition of a fourth penstock.14 However, unlike the other penstocks which were buried, the fourth penstock was installed aboveground and anchored with reinforced concrete saddles.
It was then attached to the intake which was originally design to accept a fourth penstock.15 The installation of new lighting on the dam and the installation of new safety railings were also completed during this period. With these changes also came upgrades to some of the electrical equipment in the powerhouse. On December 15, Unit 4 (a kW unit) went into service, 10 Reynolds, Bartletts Ferry, 11 Hageman and Parker, Bartletts Ferry, 12 Reynolds, Bartletts Ferry, 13 Wright, Georgia Power, 14 Georgia Power Company, History Timeline: Bartletts Ferry. Document on file at the Georgia Power Archives, Atlanta, Georgia. 15 Reynolds, Bartletts Ferry, 58. BARTLETTS FERRY HYDROELECTRIC PROJECT, GANTRY CRANES HAER No.
GA-166-A (Page 6) bringing the facility s total installed capacity to Also in the early an administration building and maintenance shop were constructed, as well as an employee cottage, a communications building, and a clubhouse. A new plant managers house was constructed about All of these buildings are located on the west side of the river. In a million addition to the Bartletts Ferry facility was completed on the east side of the river. This included a separate powerhouse containing generator Units 5 and 6, two penstocks, an intake structure, and a dike. The additions boosted the plant generating capacity to kW. The addition required a new channel be excavated east of the existing dam and dike that would carry water to the new intake.
Unit 5 went into commercial operation October 1, and Unit 6 on November 1, In addition, on the river s western shore, west of the existing powerhouse and administrative building, a unique flood control weir was completed in the mid-1980s.17 Alterations to various components of the Bartletts Ferry Project over its 84-year history have included upgrades to some electrical equipment in the powerhouse, the reinforcement of the main spillway section and retaining wall, the raising of the dykes, and the addition of a second intake, powerhouse (for generators Units 5 and 6), and flood control weir. However, much of the original facility has remained unchanged. The original generator units (Units 1 and 2) are still in use as well as those added in (Unit 3) and (Unit 4).
The tainter gates, tainter gate gantry cranes and tracks, stop logs, the intake, and the penstocks have not been significantly altered.18 GANTRY CRANES -
Hydroelectric plants typically include cranes to hoist and handle mechanical equipment or gates. Overhead cranes are frequently attached to steel girders within indoor powerhouses. Gantry cranes are mounted on steel frames or gantries that have side supports which move along tracks. Functionally similar to overhead cranes, gantry cranes are more often used in outdoor or semi- outdoor powerhouses for lifting of equipment, or on top of dams for gate operations, such as the situation at Bartletts Ferry.19 The Bartletts Ferry Project includes two original steel-framed gantry cranes designed by Stone and Webster and assembled on site in Initially, one complete motor-operated crane was installed, together with one skeleton crane arranged for emergency hand operation.
Both cranes were designed at a 10-ton capacity with a 10 per minute vertical hoisting speed and a traverse (horizontal) speed of 200 feet per minute. The steel-framing, or gantry, travels on rails 10 6 inches apart situated along the dam s operating platform. The bases of the frame, above the trolley wheels, include 12 high oak bumpers. The crane hoists raise and lower the steel tainter gates, which measure 25 long and 21 high, and control the water flow over the dam.20 16 Wright, Georgia Power, 17 Georgia Power Company, History Timeline: Columbus Electric and Power Company, and the Georgia Power Company. Document on file at the Georgia Power Archives, Atlanta, Georgia; also, Reynolds, Bartletts Ferry, 62.
18 Reynolds, Bartletts Ferry, 19 James Joseph Doland, Hydro Power Engineering: A Textbook for Civil Engineers (New York: The Roland Press Company, 20 All engineering data derived from project drawings prepared by Stone and Webster. Drawings include General Arrangement-Gantry Crane Sheet No. 1 Gantry Crane Trolley Details General Arrangement- Gantry Crane Sheet No. 2 and Steel Framing- Gantry Crane Sheet No. 1 BARTLETTS FERRY HYDROELECTRIC PROJECT, GANTRY CRANES HAER No. GA-166-A (Page 7) Each crane is also designed to hoist the stop logs, which are used to close the floodgate openings when necessary to make repairs on the tainter or skimmer gates. Each stoplog consists of four panels each, and each panel measures 5 -8 inches in depth.
The stop logs have lifting beams designed with swinging links which cast steel hooks in the upper faces of the stop log panels. The links can be set to either engage or release the hooks automatically. This permits the handling of the logs while underwater if necessary. There are similar stop logs that are used for shutting off any one of the intakes. All stop logs are stored in the upper end of their slots when they are not in use. Each crane is also capable of lifting one of 12 trash racks, which prevent debris from entering the penstocks and draft tubes. Guides for mechanically operated rack rakes were provided so that the rakes could be installed at a later date if needed.
Each crane s mechanical unit is independently housed beneath a hipped roof structure sheathed in composition shingles. Originally, these were metal roofs. The remainder of the housing unit is encapsulated in metal, with the north (upstream) and south (downstream) elevations each containing two sets of sliding windows (two panes each). The mechanical floors and equipment are accessed by a ladder to a portal, sheathed in steel with sliding fixed-plate observation windows. The portal is set 8 from ground level. A second ladder in the portal provides access up to the mechanical floor, which houses the drums, motors, and brakes. Each crane has two motors, a hoist motor and a traverse motor, each equipped with solenoid brakes.
The cranes operate the gates electrically with a 10-ton capacity for trash racks (single rope) and 16-ton capacity for the tainter gates (two ropes). The dam is partially lit (alternating current) by means of flood lights at each of the gantry cranes corners.
The gantry cranes retain their integrity and have only received minor repairs to continue in operation. The primary aspects of the cranes, including the hipped roofs, mechanical gears, hoists, and track system remain intact and largely unaltered. Alterations include the replacement of the original roof cladding from metal to the current composition shingles. The original ropes were replaced at an unknown date with steel cables. The original cranes are not the proper height to operate using current procedures for raising the spillway gates. Both of the older cranes will be removed from the dam and replaced with new cranes that are 9 wider and 12 taller. However, the new cranes will use the original track system to move across the spillway and dam.
Technical Specifications Capacity: 10 tons, one rope 16 tons, two ropes Motor: General Electric, 20 HP Hoisting Speed: 10 per minute BARTLETTS FERRY HYDROELECTRIC PROJECT, GANTRY CRANES HAER No. GA-166-A (Page 8) Traverse speed: 200 per minute Operating Current: Alternating, 3ph 60 cycles, Lighting Current: Alternating, 60 cycles, Height Above Rails: 22 -10 Width Between Wheel Centers: 20 Width Between Rails: 10 -6
Primary Sources GPC Corporate Archives personnel supplied photographs from Audio Visual Files: Land Department, Land Management: Bartletts Ferry; Charles Ratteree: Bartletts Ferry album. Photographs from Record/Manuscripts Files: Land Department: Bartletts Ferry GPC Engineering Archives: Drawing Files, Bartletts Ferry. General Arrangement -Gantry Crane Sheet No. 1 Gantry Crane Trolley Details General Arrangement - Gantry Crane Sheet No. 2 Steel Framing - Gantry Crane Sheet No. 1 Secondary Sources Anonymous. Bartletts Ferry Cofferdam Unwatered. Stone and Webster Journal, Volume 36 Columbus May 1. Stone and Webster Journal, Volume 39 Columbus October 17. Stone and Webster Journal, Volume 43 Compressed Air Magazine. Putting Power of Georgia s Rivers to Work, Compressed Air Magazine.
Volume 31 (March Doland, James Joseph. Hydro Power Engineering: A Textbook for Civil Engineers. New York: The Roland Press Company, Georgia Power Company. History Timeline: Bartletts Ferry. Document on file at the Georgia Power Archives, Atlanta, Georgia. BARTLETTS FERRY HYDROELECTRIC PROJECT, GANTRY CRANES HAER No. GA-166-A (Page 9) History Timeline: Columbus Electric and Power Company, and the Georgia Power Company. Document on file at the Georgia Power Archives, Atlanta, Georgia. Snapshots: Lake Harding, Document on file at the Georgia Power Archives, Atlanta, Georgia. Georgia Railway and Power Company. Georgia Railway and Power Company, Document on file at the Georgia Power Company Archives, Atlanta, Georgia. Hageman, H.A., and Parker.
The Bartletts Ferry Hydroelectric Development, Stone and Webster Journal. Volume 38 Hay, Duncan Porter. Documentation, Langdale Hydroelectric Generating Project (FERC Riverview Hydroelectric Generating Project (FERC Harris County, Georgia. Prepared for Georgia Power Company, Document on file at the Georgia Power Archives, Atlanta. Hydroelectric Development in the United States, In two volumes. Washington, DC: Edison Electric Institute, Reynolds, W. Michael. Bartletts Ferry Project: Historic Hydro-Engineering Report, Harris County, Georgia and Lee County, Alabama (FERC Atlanta, Georgia: Brockington and Associates, Inc., December Technical report prepared for the Georgia Power Company in support of Federal Energy Regulatory Commission relicensing. Wright, Wade H.
History of the Georgia Power Company, Atlanta, Georgia: Georgia Power Company,