BlockBefore
Decorative drawing: a small railway station beside the track, with a signal post. Not a photograph of this place.

Nomination for New Richmond Water Works and Electric Station

The case file that argued this property on to the National Register: 2,923 words across 18 pages, filed in 1993. Read by 4 independent recognisers, of which at least 3 had to agree before a line was published.

Source document Held by the National Archives in Record Group 79 as reference 93001389, where it exists only as a scan with no text layer. The words below were read off that scan by 4 independent recognisers at two resolutions. Only lines that at least 3 of them returned identically appear below; where they disagreed, the line is withheld rather than guessed, so some of the form's furniture is missing. Spelling is never corrected, so a stray character that all the readers agreed on is the recogniser's and the typewriter's.. Nothing is summarised, corrected or written by this site. See the catalogue record, or return to the property.

From the form

The catalogue entry the section above was filed under.

. 1024-0018 (Rev. 8-86) National Park Service NOV 0 8 1993 and areas of significance, enter only the categories and subcategories listed in the instructions. For additional space use continuation sheets 1. Name of Property other names/site number CLE - 457-10 Location street & number NA J not for publication NA vicinity city, town zip code 45157 Ownership of Property Category of Property XX building(s) KXpublic-local _ structures _ Total Name of related multiple property listing: listed in the National Register _ 0 Ohio Historic Preservation Office -- SHPO State or Federal agency and bureau 5. National Park Service Certification 1, hereby, certify that this property is: Ventered in the National Register. determined eligible for the National Register. See continuation sheet. determined not eligible for the removed from the National Register.

other, (explain:) Signature of the Keeper Date of Action Noncontributing site code Date REGISTER private object district public-State Registration Form RECEIVED state public-Federal Ohio NATIONAL 11-3-93 National Register. New Richmond State/Federal Agency Certification New Richmond Water Works and Electric Station Number of contributing resources previously Number of Resources within Property 3. Classification National Register of Historic Places historic name See continuation sheet. (Form 10-900a). Type all entries.

This form is for use in nominating or requesting determinations of eligibility for individual properties or districts.See instructions in Guidelines United States Department of the Interior Signature of certifying official As the designated authority under the National Historic Preservation Act of 1966,as amended,1 hereby certify that this Signature of commenting or other official NPS Form 10-900 the requested information.If an item does not apply to the property being documented, enter "N/A" for "not applicable."For functions, styles, materials, In my opinion, the property 1389 701 Washington Street New Richmond Water Works & Electric Station, Clermont Co., OH 6. Function or Use 7. Description Describe present and historic physical appearance. the southwest portion of the village of New Richmond, Ohio, adjacent to the Ohio River.

half story is in the form of a loft area above each of the small, main floor rooms.

- See continuation sheet stone brick slate Industry/Waterworks foundation roof walls (enter categories from instructions) other work in progress Architectural Classification Current Functions (enter categories from instructions) doors has a two-paned transom.The doors and the double hung windows have ashlar brick set in stretcher bond with ashlar limestone foundation.Each of the two double Materials (enter categories from instructions) The interior consists of a large center room with a vaulted ceiling.The main Historic Functions (enter categories from instructions) pumps from the wells for repairs and maintenance.A lime settling tank was added story wings of identical proportions were added to the exterior of the north and The original power plant is a rectangular one and one-half story structure of Water Works and Electric Station 1899".The hip roof is shingled with slate.A The smokestack was removed in 1926 to accommodate wings for wells.Two 1 windows feature curved brick arches.

The New Richmond Water Works and Electric Station is situated on l acres in No Style are of brick. The interior doorways, the interior of the exterior doorways, and the towering smokestack was originally on the south end of the building. south walls.Two identical tripods,one on each wing,used chain hoists to pull the close by.The tank has since been removed.The wings and tripods remain. New Richmond Water Works and Electric Station, Clermont Co., OH 8. Statement of Significance

Statement of significance

4locally Areas of Significance (enter categories from instructions) Period of Significance The New Richmond Water Works and Electric Station is significant under Criterion A in the area of Industry, because for over eighty years the plan provided vital utility In 1814, Jacob Light founded New Richmond. Two years later, Thomas Ashburne and renamed New Richmond. From the first there was growth, the natural growth of a town laid out by men of vision, Light with his businesslike approach and Ashburne with his desire to create a town to match the beauty of the River. Early development activity included the sale of lots, building of homes and service shops, establishment Then the additions and subdivisions started with George McMurchy's being the first and largest addition. During the short span of five years between 1849 and 1854 schools with a new school built before 1860. N.M.

Prebble was the mayor. years was a period of progress slowed only slightly by two major floods.Important paved with limestone set on edge. Industries such as the J. & H. Clasgens' woolen mills, Fridman's lumber yard, White's carriage works flourished. A spacious new hotel was built to accommodate the demands of travelers for both business and holiday. The river was a major means of transportation, with packet boats carrying both freight 1899-1943 1926 1924 Industry Significant Dates Significant Person See continuation sheet Architect/Builder and passengers. Applicable National Register Criteria public water to the community and was one of the first such facilities in the region. Cultural Affiliation State significance of property, and justify criteria, criteria considerations, and areas and periods of significance noted above.

of marketplaces for area farmers, a wharf for river trade, and many good schools. buildings were erected, street lights were maintained, the river bank was graded and After 1924, its services were confined to water supply, which continued until 1983. By 1870 New Richmond was a thriving river port, population 3000. The next thirty nationally Criteria Considerations (Exceptions) there were seven major additions. During this period there was advancement in the National Register of Historic Places New Richmond Water Works and Electric Station, Clermont County, Ohio As the century was nearing a close, the village was ripe for new technology including electricity, the telephone, and a central water plant. They needed direction and elected mayor in 1896. Purcell had long been an active member of the community.

between Cincinnati and New Orleans, he served as New Richmond wharf master and owner in the late nineteenth century. He also served as Clermont County commission- er. Purcell had served on the unsuccessful Light Committee in 1887. Everyone agreed there was a need for a ready and abundant supply of water. It would be useful to industry, businesses, and homes. Safety was a large factor as fire was system it was noted that the revised plan would still provide good fire protection to all".) However, many residents and businessmen felt that the energy sources available equipment of transporting electricity. Power could be created on site by use of a a power plant, erect poles, string wires? Even the cities were reluctant to establish electric power plants. There were many individual, private steam powered generators of electricity for limited use. Cincinnati place of gas for lighting.

It was not until the development of transmission lines and transformers that it became practical to replace small plants with large central power stations, and electric lighting came into widespread and accepted use. Electricity had been recognized as a marvelous new tool, but regarded as an industrial tool. It was a source of energy to operate all the marvelous machines which were so People seem to have been fearful of having it in their homes, and perhaps rightfully so. Their established methods of providing light was satisfactory. National Park Service Continuation Sheet to them were quite adequate.They were reluctant to invest in the expensive source for mechanical devices was examined.But electricity as a light source?

Having begun his riverboat experience at the age of 16, spending years piloting much in the public eye.It was the machine age and any new application or power Gas Light & Coke Company felt providing gas to its customers was a central steam and people found their gas, oil and kerosene lights satisfactory. Why construct importance and that providing electricity was not feasible and would never take the leadership, somebody to take the initiative. This came in the person of F. M. Purcell, a very real danger.

(When the power plant budget required reduction of the pipe Natlonal Register of Historic Places New Richmond Water Works and Electric Station, Clermont County, Ohio as Hamilton, Ohio), people were generally resistant to the idea of electric production Council minutes show that in 1887 the right to erect poles and wires was sought and right of way was adopted, but nothing further occurred. Perhaps a levy put on the ballot and failed, because oil expenditures continue and there is no further talk, on Short, mayor. election to permit the issue of bonds in the amount of $30,000 passed voters. The first meeting of the Board of Electric Light & Water Works Trustees was held October More than 40 respondents met in the Opera House. After hearing the bids of the various contractors, the Board was forced to scale down awarded on December 9, 1898.

The reservoir would be located on the hillside just beyond the village. Water Company right of way was repealed on December 2, 1889, signed by C. W. Continuation Sheet would be reasonable (with no actual dollar amount being given).To demonstrate their By 1896 citizens felt favorable toward electric lighting.F.M.Purcell's first act as plan was larger than absolutely necessary."Modified bids were made and contracts applicants, Mr. J. F. Witmer of Buffalo, New York was chosen and directed by Village plats showing"location of arc and incandescent lamps, etc."were available.

plants and it took a very few determined individuals to persevere.The New Richmond the plans."This could be done without damaging the plant in the least as the original The people of New Richmond apparently agreed.As in other rural communities (such a study of costs requested.The Silvey Light & Water Company stated that the charge satisfied with light and price, they do not have to invest."The ordinance granting Were posed for examination of bidders in New York, Cincinnati,and New Richmond. confidence, they stated "If the people of New Richmond and the council are not National Park Service Two acres at the price of $4oo.o0 was purchased from P. B.Huston for the reservoir. Section number .&Page. Page - 2 record, at least, of supplying electricity. The ordinance permitting Silvey Light & mayor was to call a meeting about a power plant.

On September 12, 1898 a special examined.The town advertised for bids for construction.Plans and specifications telegram to "Come at once. Potential sites for the plan and the reservoir were 21, 1898. The first order of business was to hire a civil engineer. Of thirteen Natlonal Register of Historic Places Clermont County, Ohio For the plant itself, one and one-half riverside acres were purchased from Mike Thiel this evening for the first time in New Richmond".

And the ol' lamplighter with his oil can and ladder was no longer walking the streets of New Richmond to light the corner went from the "lethargy of a country town" to "an up-to-date little city, enjoying the conveniences of modern appliances and improvements." Where formerly the streets were often enshrouded in darkness, unfitted to be comfortable thoroughfares, the beautiful lawns, which lay brown beneath the hot rays of the sun, because there were no means of refreshing the drooping grass and flowers with copious supplies of water, and even the dust on the streets is all overcome, by the present unlimited hydrant supply. But even more welcome and useful will be this abundance to the household, the mills, and the factories. It was the first to be installed in For twenty-five years the water works & electric station answered the community's demands for electricity.

In 1924 local production of electricity was discontinued and Southwestern Ohio Power Company furnished the town's power needs. The plant continued to serve as the water works. In 1926 New Richmond officials made the decision to cease using the river as a source for their water and to drill two deep wells at the plant site. Two wings were added to house the two wells. The water from the wells was pumped into the filtering and softening plant, then to the lime settling tank and finally, as before, to the National Park Service Euphorically, Thirey and Mitchell stated the following in 1902: Continuation Sheet for $275.00. New Richmond Water Works and Electric Station radiant arc light transforms the gloom into day.Her reservoir on the hill where it was gravity-fed back to the village in the valley.

oil lamps.In the space of eight busy months (December 9 to August 7),the village Section number _ 8 Page _ 3 The Trustees' minutes for August 7, 1899 read: "...the street arc lamps were lighted National Register of Historic Places New Richmond Water Works and Electric Station, Clermont County, Ohio The sturdy plant withstood the ravaging 1937 flood. It continued to operate until the water reached the high lift pumps on the second floor and forced a shut-down until removed when the new water works was built in 1983. After eighty-four years of United Statee Department of the Interior the flood water had receded.The lime settling tank and the high lift pumps were Continuation Sheet service, the 1899 building discontinued operation. National Park Service Page _ 4 Section number .8 New Richmond Water Works & Electric Station, Clermont Co., OH 9.

The rest of the file

Bibliography, boundary description, and the people who prepared and reviewed the nomination.

Major Bibliographical References 1. deed book 142, page 281. Clermont County Court House, Recorder's office, Batavia, Ohio. Rockey, J. L. History of Clermont County, Ohio, with Illustrations and Biographical Thirey & Mitchell. Encyclopedic Directory and History of Clermont County, Ohio. Rosenthal & Co., Cincinnati. c1902. XX See continuation sheet Previous documentation on file (NPS): N/A preliminary determination of individual listing (36 CFR 67) Primary location of additional data: X Local government Survey # Other Record # Clerk's office, village of New Richmond, C Historic New Richmond, Inc.,New Richmond,C 11. Form Prepared By May 27, street & number - _ telephone city or town - _ state 513-553-2375 Zone Northing organization date University Ohio name/title New Richmond the Ohio River.

Federal agency Specify repository: associated with the property, the entire rectangle from Washington Street to designated a National Historic Landmark Verbal Boundary Description Boundary Justification UTM References previously listed in the National Register recorded by Historic American Buildings recorded by Historic American Engineering 10. Geographical Data Other State agency 214 High Street State historic preservation office previously determined eligible by the National Register Village of New Richmond has been requested minutes:Trustees of Board of Public Affairs.1924.Aug.13,1926-Dec.15,1927. Acreage of property east and extending to the Ohio River to the west. The boundary includes the original l acres that have historically been One and one-half acre strip loo feet wide along Washington Street to the Hazel J. Davis Zone Easting _zip code 45157 2.

minutes: Board of Electric Light & Water Works Trustees. Oct. 21, 1898-Aug. 7, 1899. Sketches of Its Prominent Men and Pioneers. Everts, Philadelphia. 1880. A [1,6] 1431141000] United States Department of the Interior National Park Service Natlonal Register of Historlc Places Clermont Co., OH Situated in Robert Beal's Survey N. 847 and in Ohio Township, Clermont County, New Richmond Water Works and Electric Station, From the deed for the property: Ohio,bounded and described as follows,to wit:Beginning ata stake in of beginning, containing l Acres of land more or less off the Northwest end Continuatlon Sheet of the land. thence with the line of The J.& H. Clasgens Co.N. 50°E. 4l poles to the place said Thiel's line on the pike; thence parallel with said line of The J. & H. Clasgens Co. S. 50 W. 40 poles to the Ohio river; thence N. 40 W.

with the Ohio river 100 feet to the line formerly David Gibson's, now The J. & H.

Clasgens Co., NOMINATOR: STATE N PDIL: COMMENT WAIVER: N ABSTRACT/SUMMARY COMMENTS: DOCUMENTATION see attached comments Y/N see attached SLR Y/N MULTIPLE 11/08/93 RETURN 12/10/93 12/23/93 DATE OTHER: PERIOD: NAME: EVALUATION/RETURN SHEET PROGRAM UNAPPROVED: REASONS FOR REVIEW: DATE OF WEEKLY LIST: DATE RECEIVED: NATIONAL PARK SERVICE NATIONAL REGISTER OF HISTORIC PLACES UNITED STATES DEPARTMENT OF THE INTERIOR DATE OF 16TH DAY: REQUESTED ACTION: NOMINATION V ACCEPT STATE & COUNTY: OHIO, Clermont PROPERTY DISCIPLINE REJECT New Richmond Water Works and Electric Station _count STATE/FEDERAL AGENCY CERTIFICATION - -current _architectural classification _descriptive text _completeness _clarity _applicable criteria _justification of areas checked _relating significance to the resource _relationship of integrity to significance _justification of exception _other -acreage -verbal boundary description _boundary justification - Phone FUNCTION context DESCRIPTION historic Period CLASSIFICATION materials BIBLIOGRAPHY SIGNIFICANCE Date Builder/Architect Specific dates OTHER COMMENTS Questions concerning this nomination may be directed to ACCOMPANYING DOCUMENTATION/PRESENTATION resource type Signed summary paragraph GEOGRAPHICAL DATA Areas of Significance--Check and justify below Statement of Significance (in one paragraph) UTMS presentation photographs 1990 Clermon+Co-OH Clermont Co., OH ADIN Clermont Co., OH 1991 AEVERLISING AGENOY.

ADIN march 1991 Clermont Co., OH ADYERTISING AGENCY ADIN NEW RICHMOND STATION 1899 ADVERTISING AGENCY 164524782 March 1991 S DEPARTMENT OF THE INTERIOR NEW RICHMOND WATER WORKS ELECTRIC GEOLOGICAL SURVEY UNITED STATES NEW RICHMOND QUADRANGLE NEW RICHMOND, OHIO-KY. N3852.5W8415/7.5 16/735950 1982 Velma Avenue Columbus, Ohio 43211-2497 Fax: 297-2411 November 4, 1993 SINCE 1885 NOV 0 8 1993 P. O. Box 37127 Washington, DC 20013-7127 NEW SUBMISSION H. E. Fledderjohann House, Doctor's Office, and Summer Kitchen New Richmond Water Works and Electric W.

Ray Luce State Historic Preservation Officer SOCIETY COUNTY Montgomery Sincerely, Station 614/297-2470 Washington enclosures Auglaize Clermont HISTORICAL REGISTER Portage RECEIVED Luman Nelson House Insco Apartments Building National Register of Historic Places NATIONAL Ohio Historic Preservation Office Ohio Historical Center procedures have been followed for these new submissions. National Park Service Dear Ms. Shull: Enclosed please find six(6) new National Register nominations.All appropriate notification If you have questions or comments about these documents, contact this office. Carol Shull, Chief of Registration John Kaiser House United Brethren Publishing House