The Genoa Peak Road spur segments were part of a major log transport network associated with the Comstock mining era. This secondary spur segment once interconnected with an elaborate network of primary and lesser skid roads. The network was the main arterial system for wood transport to Spooner Sum- mit, the key lumberyard for the C&TL&FCo. The period of signifi- cance for this lumbering activity is The spur road has retained its integrity and its overall character as a century Comstock-era haul road. Prepared By: John F. Elliott, Historian Elliott Research Associates P.O. Box 728 Three Rivers, California Date: July, GENOA PEAK ROAD, SPUR SEGMENT 2 HAER No. NV (Page 2) A.
Physical History Genoa Peak Road Spur Segment 2 was part of a complex of logging roads developed to access timber in the vicinity of South Camp Peak. This spur road links a northeast trending network of smaller skid roads. The 10-foot wide roadway is a graded earthen surface, and measures one mile in length. The steeper areas contain some rock work reinforcing crossing sections. The average grade is less than six percent. It was constructed ca. Chinese woodcutters exhibited a social pattern typical of the American West.
They lived separately from their Euroamerican counterparts in groups of adult males, ranging in age from The group was dominated by men in their twenties, group size varied (Lindstrom and Hall Carson range woodchoppers, both Asian and Euroamerican, lived in groups of five to 10 in the in the the average group size was 10 to 20 (ibid.). Previous studies indicate that the Chinese sites inferred a cross-cultural status difference between woodcutters and lumber- men . "Lumbermen" were involved in the mi11ing industry, whi le "woodcutters" chopped and gathered wood. Lumber production was a more skilled occupation centered at the mill site, while wood cutting was more labor intensive. Chinese immigrants tended to work in the outlying areas cutting cordwood (Hill B.
Description General Characteristics The Genoa Peak Road spur segments are 10-foot wide graded earthen roadways approximately three miles in total length. The network of spur segments begins two miles south/southeast of Spooner Summit. Four associated historic features were also recorded as a part of this documentation. The historical integrity of these log-hauling spur segments is excellent; roadways have survived essentially intact. In the the Forest Service constructed waterbars for erosion con- trol . These features consist of channels excavated across the roadbed to furnish drainage for stream runoff. The dirt from the channels was placed along the downslope side of the channel. C.
Contextual History The Comstock mines would not have attained historical promi- nence without adequate sources of wood. The majority of this timber was supplied by the Tahoe Basin and the vicinity of Genoa Peak. In order to transport the logs to the Comstock district, lumber companies developed an elaborate system of roads, rail- roads, and flumes. GENOA PEAK ROAD, SPUR SEGMENT 2 HAER No. NV (Page 3) At least 80 million board feet were consumed annually during the the peak of the excitement of the Comstock Era. The burgeoning demand for fuel wood attracted thousands of logging contractors who supplied large lumber companies. The mines of the Comstock Lode (Virginia City, Nevada, region) are literally the tombs of the forests of the Tahoe Basin.
In it was estimated that more than 600 million board feet had been buried in the Comstock mines, enough to build a town of six-room houses for population. The Carson & Tahoe Lumber & Fluming Company established their key shipping and receiving yard at Spooner Summit. Wood was cut on the surrounding mountains. The logs were transport- ed short runs in large wagons along haul roads. Longer distances necessitated the dragging of logs by team animals through chutes and on skid roads. The Glenbrook Railroad, established in delivered lumber from the Glenbrook mills in the Spooner Summit vicinity. The Carson & Tahoe Lumber & Fluming Company held a virtual monopoly over the wood and water resources of the area. D.
Proposed Alterations Within the Genoa sale area, along the main trunk of Genoa Peak Road, some construction will be necessary. This work will include curve widening, installation of culverts for drainage, ditching, grading, and rock surfacing over a small segment. No historic sites, or artifacts were identified during the surface survey of the trunk road within the project area. Genoa Peak Road Spur Segments 1 and 2 will require modifica- tions, including smoothing of road surfaces, clearing of vegeta- tion to provide a maximum road corridor of 12 feet, and dust abatement treatment. E. Sources Knowles, Constance Darrow A History of Lumbering in the Truckee Basin. Ms. on file at Forestry Library, UC Berkeley. WPA Official Project No. Forest Survey Division. Lindstrom, Susan G.
Determination of Eligibility and Effect for the Spoon- er Timber Sale on the Toiyabe National Forest. Biosystemsems Analysis, Inc., Santa Cruz. Lindstrom, Susan G. and Jeffrey T. Hall Cultural Resources Inventory and Evaluation Report for the Proposed Spooner Summit and East Shore (Big Gulp) Timber Sales. Biosysterns Analysis, Inc., Santa Cruz.