7IVOCATES of the extension of inland navigation, as we have sech, did not at first contemplate anything beyond the improvement of oaturil channels from the Hudson io Lake Ontario, Efforts in that direction proving unsuccessful, the construction of an artificial channel from the Hudson to Lake Terie suggested itself to commercial and scientific minds. The first proposal, if not the original conception, of such ap enterprise is claimed for Gouverneur Morris, People generally, however, appalled at the magnitude of the suggested work, hardly dared to consider the subject gravely, and for several yeats after the conception of the idea nothing was done toward realizing it,

Yet it was not abandoned. Among the ablest advocates of the project was Jesse Hawley, who in a fourteen-weeks series of contributions to the Genesee Messenger, hegmning in October, r8o7, elucidated it, and demonstrated its feasibility. The proposition was first brought before the Legislature by Joshua Forman, member from Onondaga, February 4th, 1808, Pursuant to a resolution offered by him, a committee was appointed to report on the propriety of ay exploration and survey to the end that Congress might be induced to ajpropriate the requisite funds. 'The committee reported favorably; a survey was ordered April 6th, 1808, and a small appropriation made for the expenses of the same. 'The service was performed by James Geddes. He was directed to examine the route for a canal from Oneida lake to J,ake Ontario, as well as that from Lake Erie eastward. He reported in favor of the latter, which he pronounced feasible. The report excited veneral interest, and made such an impression on the Legislature that a joint resolution was passed creating a board of commissioners to make additional explorations and surveys, for which $3,000 was appropriated. "The work was done in ihe summerof 1810, and a report made in the following spring in favor of the route to Lake Erie. The cost of the proposed canal was estimated at $5,a00,a00. The commissioners in compliance with their request were authorized to obtain a loan of $5,000, ooo, and procure the right of way.

The prosecution of the work was prevented by the war with Great Britain, which so engrossed public attention that the canal project was abandoned, and the act authorizing a loan in its behalf was repealed.

Toward the close of r8z5 the enterprise was revived. A large meeting in its favor was held at New York, in December of that year, at which resolutions were adopted urging the construction of the canal, An able memorial from New York, and petitions from all parts of the State, were presented to the Legislature. The memorial was a strong argument for the canal, and a rose-colored prophecy of the results that would follow its construction in the development of population and commerce. In spite of many obstacles, the efforts of the canal champions out of the Legislature and init, especially of De Witt Clinton, among the latter, procured the passage of an act, April 17th, 1816, providing for the appointment of commis sioners to take up the work, De Witt Clinton was the president of the commission. April rsth, 7817, an act prepared by him was passed, though not without strenuous opposition, authorizing the commencement of actual construction, The canal was still considered by many a ruinous experiment, and lamentations were frequently heard on the miseries of an overtaxed people and their posterity.

The canal was divided into three sections, from Albany to Rome, Rome to the Seneca river, and thence to Lake Erie. Charles C. Brodhead was engineer in charge of the eastern division, Benjamin Wright of the middle division, and James Geddes of the western, The canal was planned to be forty feet wide at the surface, and twenty-eight at the bottom, and the depth of water four feet. The Jocks were ninety feet long and twelve wide in the clear, he commissioners were authorized to borrow on the credit of the State sums not exceeding $400,000 in any one year, Nearly $50,000 had been spent in explorations and surveys before ground was first broken. 'Chat event occurred at Rome on the nation's birthday, 1817, in the presence of De Witt Clinton, the foremost champion of the enterprise, who was then governor, and the commissioners. - John Richardson held the plow in opening the first furrow. It was more than two years before any part of the line was ready for use. On the 22nd of October, 1319, the first boat was launched at Rome, to run between that point and Utica, for the conveyance of passengers. It was called the "Chief Engineer," was sixty-one feet long and seven and a half wide; had two cabins, each fourteen feet long, with a flat deck between them, and was drawn by one horse. The next day the commissioners and some of the most prominent citizens of Utica embarked there for the return trip to Rome, and set off with a band playing, bells ringing, cannon thundering and thousands of spectators cheering from the banks,

On the arst of July, 1820, tolls were first levied, the rates being fixed by the commissioners; the amount received that year was between five and six thousand dollars, taken by six collectors. In the autumn of 1819 the canal was filled with water from the west to within two miles of Frankfort, where a dam was kept across it while the excavation was being finished eastward. West of this dam, pleasure boats plied during the summer of 1819, For a mile east of the dam, Colonel Hezekiah Sage was the contractor, The contractor for the section running eastward from Fort Herkimer was an [Irishman named Sinclair. The canal was used between Utica and Little Falls in the autumn of 1821, the contractor at the latter point availing himself of the unprofitable labors of the Inland Lock Navigation Company; and the portion east to the Hudson was under contract, Meanwhile, the river floated the canal boats from Little Falls to Schenectady. The Mohawk valley, below the former point, was thoroughly explored under the supervision of Benjamin Wright, chief engineer,

In the spring of 1823 the canal was open uninterruptedly from Spraker's to the western part of the State. In the later stages of the great work unexpectedly rapid progress was made, its success being now assured, and on the 26th of October, 1825, the finishing touch had been given and the canal was thrown open to navigation throughout by the admission of water from Lake Erie at Black Rock.

The length of the canal was 363 miles, and its original cost $7,143,750. 86. LItscompletion was celebrated with unbounded joy, which found expression in extraordinary civic and military ceremonies, and all the festivities that a proud and happy commonwealth could invent, On the morning of October 26th, the first flotilla of boats bound for New York from Lake Erie entered the canal at Buffalo, carrying the governor and canal commissioners.

Their departure was the signal for firing the first of a large number of cannon stationed within hearing distance of each otheralong the whole line of the canal and the Hudson river, and at Sandy Hook, by which the momentous news of the opening of through travel at Buffalo was announced at the Hook in an hour and twenty minutes, One of these guns was planted at Little Falls, one at the Fort Herkimer lock, one on the hill in the present Frankfort cemetery, and one just west of the site of the lunatic asylum at Utica.

As at first constructed, the canal ran through instead of over the streams which it had to cross, especially in the Mohawk valley, their waters being raised to its level, as near as possible, by dams. This gave a surplus of water in certain localities, and afforded some fine roilling privileges, Tocarry the canal through a stream of any size required upon both shores of the latter guard locks, with gates which could be closed during freshets,

Considerable difficulty was frequently experienced at such places by a long string of boats accumulating on each side of the stream where, at times, they were delayed for several days, during which their crews came to be on familiar and not always friendly terms. Such delays were sometimes caused by a freshet in the creek injuring the dam, The passage of the first boat across a creek on the subsidence of high water, was a marked event, sometimes drawing a large crowd together to witness it, The first thing was to get the boat within the guard lock and close the gate behind it. Then, witha strong team - sometimes doubled - the feat was undertaken, Tt was always attended with excitement and sometimes with peril. The passenger packet boats had the preference in passing locks, and it was readily conceded at creek crossings in freshet times. This leads us to remark, that the canal at the outset, far from being exclusively an artery of commerce, as at present, was the fashionable avenue of western travel, The packets were elegantly furnished, set excellent tables, and outstripped the freight boats in speed by their comparative lightness and their three-horse teams. The canal, accordingly, fu rmished: the natural route of La Fayette in his grand tour through this part of the country in 1825,

'The canal early became taxed beyond its capacity, and the necessity of enlarging it was made apparent. By an act passed in May, 1835, the canal commissioners were authorized to have this work performed, including the construction of double locks, as fast as they should judge advisable. Under this act the enlargement was begun, and carried on with more or less activity for more than a quarter of a century before it was completed, throughout. Samuel Ridley & Brothers were the contractors who enlarged the section above mentioned as having been built by Colonel Sage. Between that and the lock west from Frankfort village, Root, Berry & Motgan were the contractors, Between the two locks in the town of Frankfort the work was twice let to parties who failed to do it. It was finally done by Christopher Joslin. The next section east was enlarged by Rasbach, Elwood & Co. The two enlarged locks in the town of Frankfort (44 and 45) were built by Abijah Osborn, of Herkimer. 'The upper one is the end of the " long level" (sixty-nine and a half miles), beginning at Syracuse, Morse was the name of the contractor on the section whose eastern end was at Fort Herkimer. He took for his purposes the stone used in the fort, and it was at this time that the latter was demolished.

In its reconstruction the canal, instead of passing through streams, was carried over them by aqueducts, thus obviating the trouble that had occurred in times of high water. It was reduced in length to three hundred and fifty and one half miles, and increased in breadth to seventy feet at the surface and fifty-two and a half at the bottom, while the depth of water was increased to seven feet. The cost of the enlargement was. over $30,000,000, The results of the canal in facilitating communication and commerce, and stimulating the growth of towns along its line, are before the people and need not be commented upon.