BlockBefore

Hawk Street Viaduct, Albany

Hawk Street Viaduct, Albany, Albany County, NY. Surveyed as HAER NY,1-ALB,20-, with a 1,594-word written history.

From the record

“First appearance of a cantilever arch bridge”

Written record, HAER NY,1-ALB,20- survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY,1-ALB,20- · the record runs 1594 words · one of 156 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1485 words

Source document Quoted word for word from HAER NY,1-ALB,20-. Not written, edited or summarised by this site.

First appearance of a cantilever arch bridge PART I. HISTORICAL INFORMATION A. Physical History: The Hawk Street Viaduct, originally called the Hawk Street Bridge, was closed to vehicular traffic in January A monument of another age, it has been condemned as unsafe, and only pedestrians now cross over this rusted, dilapi- dated structure. The City of Albany plans neither to repair it nor to rebuild it. There is a proposal, however, to build a new viaduct across the same ravine a block far- ther west at Swan Street.* According to the commemorative plaques attached to the bridge, it was built in I889-I89O by the Hilton Bridge Construction Company of Albany, when Edward A. Maher was Mayor. The bridge was rebuilt in under the leader- ship of William S. Hackett, Mayor; Lester W.

Herzog, Com- missioner of Public Works, and James G. Brennan, City Engineer. Davis and Post were the consulting engineers and the Boston Bridge Works, Inc., was the contractor who did the actual repairs. By however, extensive deterioration of the bridge made it necessary to reduce its allowable carrying load from ten to three tons. In the city appropriated for reconstruction, but the plan was abandoned, for as a result of neglect and damage, any repair would not be practical. Neither plans for the bridge nor records m * The viaduct was dismantled by the City in July HAWK STREET VIADUCT \r> HAEK Wo. (Page i\ of its maintenance exist in the Albany City records. In its dimensions alone, the bridge is inadequate for the demands of modern traffic.

Despite its almost obscure record, the Hawk Street Viaduct is significant in the physical and social history of Albany. Spanning the ravine between Capitol Hill and Arbor Hill, it connected the fine residential section, which had grown up around the government buildings , with working class neighbor- hoods. A canal at one time ran through the ravine, but it has been filled in and displaced by Sheridan Avenue. In the late nineteenth century, the Hawk Street Viaduct pro- - vi&ed a solution to both a social and an engineering problem. It was necessary to establish direct access and communication between the separate camps of the city, but neither the city nor state governments worked rapidly toward a solution.

All through the the state legislature rejected a bill authorising a viaduct across the ravine, which, by that time, was at least an engineering and a financial possibility. Two successive mayors, city councils, and corporation counsels also opposed this logical civic improvement idea. The legis- lature finally approved the project in. thanks to the efforts of Maurice Cranwell, the "father of the bridge," who facilitated the "poor man's short cut to town." The City of Albany at that time appropriated only of it was used for the construction costs which actually were only As a significant engineering achievement, the construction of the Hawk Street Viaduct in heralded the use of the cantilever arch.

It was regarded as "a genuine architectural wonder," and was much admired and copied in Europe and America, in spite of the fact that it was a dry-land structure and lacked the romance and boldness of bridges across water. Other major cantilever arches were erected over the Seine and Viaur in France, and the Elbe Canal at Molln, Germany, as well as on railways in Alaska and Costa Rica. (Tyrrell, Bridge Engineer- ing, pp. A contemporary writer described the Hawk Street Viaduct as "a daring experiment in bridge construction." At its highest point the viaduct is 79 feet above the street level below. A power plant on Sheridan Avenue barely rises to the level of the roadway.

Undoubtedly, this elevated feature has been an invitation to the would-be suicide, and a considerable number are reported over the years to have leaped to their death from the railing to the pavement below. The original structure novelty of the viaduct has long since been eclipsed, and its abandoned, dilapidated appearance adds a note of sadness to the general disarray of central Albany HAWK STREET VIADUCT HAER No. (Page 1 - 20- as it undergoes reconstruction and renewal. The vast South Mall and its gigantic buildings rising slowly on Capitol Hill on one side of the Hawk Street Viaduct is matched "by the leveled surface that covers much of Arbor Hill on the other side.

As these areas are rebuilt, the need for a new bridge linking them across the Sheridan Avenue ravine will become more urgent. It is expected that in due course a new and more modern viaduct will rise across Swan Street, a block west of the. Hawk Street Viaduct. Indeed, there may be need of another bridge across the ravine at a point closer to downtown Albany east of Hawk Street. All of this points to the growing importance and utility of a crossing at this strategic site, which has been evident since the last century. B. Biographical Background: Elnathan Sweet the designer and engineer of the bridge, was also president of the Hilton Bridge Con- struction Company, its builders. Sweet's contribution was significant both professionally and technically.

In many respects the Hawk Street Viaduct was the most impor- tant engineering project in his long and diversified career. Born in Cheshire, Massachusetts in the Berkshire Mountains, Sweet received a degree in civil engineering from Union College, Schenectady in . It was the age of railroad building, and he traveled westward to par- ticipate in some of its more ambitious undertakings; he was particularly involved with the construction of the Rock Island and Northern Pacific railroads. In be came to Albany where Governor Samuel J. Tilden engaged him to help clean up the scandalous activities of the contractors on the state canals. Sweet was subsequently elected State Engineer of New York and served until Returning to private engineering practice, he. became presi- dent of the Hilton Company.

In the Hawk Street Viaduct design he introduced some novel features, most important to the combination of the arch with the' cantilever in one structure. C. Sources of Information: 1. Unpublished: Consultations with the City Engineer and City Planner of Albany, New York. File on "Albany Bridges" in the Albany Room of the Albany Public Library. HAWK STREET VIADUCT HAER No. (Page ^) JSJ Y 1 2. Published: Hislop, Codman. Albany: Dutch, English, and American. Albany, Reynolds, Cuyler. Albany Chronicles. Albany, Parsons, Brinckerhoff, Hogan, and MacDonald, Consul- ting Engineers to Albany. Know Albany Survey. Albany, Tyrrell, Henry G-rattan. A History of Bridge, Engineering.

Chicago: (By the author) Williams Co., Printers, Prepared by Samuel Rezneck Professor Emeritus in History Rensselaer Polytechnic Institute September PART II. ENGINEERING INFORMATION A. General Statement: 1. Structural character: Steel three-hinged arched- cantilever span. 2. Condition of fabric: Poor. Closed to automobile traffic. B. Description: 1. Over-all dimensions: feet total length; 79 feet highest point from street level. 2. Foundations: Light gray cut granite. 3. Structural system: The viaduct's principal element is the central three-hinged, two rib arch, spanning 360 feet. Springing "backward" from each end of the arch is a foot cantilever "half-arch" that balances much of the load on the central arch. Sixty-six-foot end spans extend beyond the cantilevers to the abutments.

The total length of the bridge with its approaches, from Clinton Avenue to Elk Street, is feet. The. hinges in the arch permit its elements to adjust freely to changing temperature and traffic loadings. The hinges are composed of large iron pins, 12 inches HAWK STREET VIADUCT HAER No. (Page ?l in diameter. One pair of pins is at "the top center of the arch, while the other pairs are at each of the springing points where the arch hears on under- ground piers of concrete. It thus combines stability and mobility. Eight-hundred tons of iron and open- hearth steel "were used in the structure, which was originally paved with creosoted yellow pine blocks. h. Special decorative details: Cast and wrought iron railings. Prepared by Richard J.

Pollak Professor of Architecture Ball State University 23 August Additional notes by Robert M. Vogel Curator, Division of Mechanical and Civil Engineering National Museum of History and Technology Smithsonian Institution PART III. PROJECT INFORMATION These records were prepared as part of the Mohawk-Hudson Area Survey, a pilot study for the Historic American Engineering Record which was established in under the aegis of the Historic American Buildings Survey. The project was sponsored jointly by the National Park Service (Historic American Buildings Survey), the Smithsonian Institution (National Museum of History and Technology), the American Society of Civil Engineers (National Headquarters and Mohawk-Hudson Section), and the New York State Historic Trust.

The field work and historical research were conducted under the general direction of Robert M. Vogel, Curator of Mechanical and Civil Engineering, Smithsonian Institution; James C. Massey, Chief, Historic American Buildings Survey; and'Richard J, Pollak Professor of Architecture, Ball State University, Project Supervisor; and with the cooperation of the Department of Architecture, Rensselaer Polytechnic Institute.

In context

Albany, New York The place record: every map, photograph and survey of this town.
Albany County, New York 194 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Albany

24 of 32 records shown

The federal surveyors worked through Albany building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Whipple Cast & Wrought Iron Bowstring Truss BridgeHAER NY,1-ALB,19-5,483 words
Rapp Road Community Historic DistrictHALS NY-164,908 words
New York State Barge CanalHAER NY-3694,500 words
Public School Number 15HABS NY,1-ALB,21-2,871 words
City HallHABS NY,1-ALB,22-577 words
Old Homeopathic Hospital (Interiors)HABS NY,1-ALB,15-385 words
Hudson Theater BuildingHABS NY,1-ALB,25A-376 words
Lansing-Pemberton HouseHABS NY,1-ALB,16-301 words
Jesse Buel HouseHABS NY,1-ALB,4-249 words
First Reformed ChurchHABS NY,1-ALB,11-78 words
922 Broadway (House)HABS NY,1-ALB,7-47 words
Old Dutch ChurchHABS NY,1-ALB,11A-43 words
Judge Henry Mead HouseHABS NY,1-ONES,3-41 words
65 South Ferry Street (House)HABS NY,1-ALB,18-39 words
Schuyler Mansion (Ironwork)HABS NY,1-ALB,2-38 words
Austin HomesteadHABS NY,1-ONES,4-34 words
Onesquethaw ChurchHABS NY,1-ONES,2-34 words
Dutch GableHABS NY,1-ALB,9-34 words
116 Washington Avenue (House & Office)HABS NY,1-ALB,23-32 words
Dutch Gable HouseHABS NY,1-ALB,6-31 words
Hudson River Day Line BuildingHABS NY,1-ALB,24-31 words
Van Dyke HomesteadHABS NY,1-ONES,1-31 words
Court of Appeals (Interiors)HABS NY,1-ALB,13-31 words
Widow Sturtevant HouseHABS NY,1-ALB,17-29 words

Provenance

  • Written history. Quoted verbatim from HAER NY,1-ALB,20-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.