The documentation of the Locust Street Bridge was prepared by the Historic American Engineering Record (HAER), National Park Service, during the summer of for the New York State Historic Bridges Recording Project. This project was sponsored by the New York State Department of Transportation and under the supervision of Eric DeLony, Chief & Principal Architect, HAER. This report was written by Andrew Cole and Charles Scott. When citing this report, please credit the Historic American Engineering Record and the authors. The construction of the Locust Street bridge and the adjacent Taintor gate retention dam and controlling works was part of "Contract E," one of ten contracts for the improvement, relocation, and enlargement of the Cayuga and Seneca Canal.
Contract E Involved the construction of Lock No. 4 and approach walls, a retention dam and controlling works, the Locust Street bridge, and a guard gate, all in the Village of Waterloo. The contract was awarded to Cleveland and Sons Company, Brockport, New York, on January 7, and declared complete on October 1, This bridge replaced a three arch stone bridge built in to carry Locust Street across the Seneca River, Work on the concrete arch Locust Street bridge began during September when a "stiff leg" derrick excavated the masonry dam east of the stone arch bridge while a new Browning shovel excavated the new bridge's north end. In October rock and earth was excavated from the site of the north abutment of the bridge using the Browning shovel and a derrick equipped with a clam shell bucket.
The south abutment, pier number five, and the sill of the retention dam and regulating gates were excavated by hand. Excavation at the site was completed In November and concrete for the approach walls and north abutment was poured in November and December. The actual construction of the arches occurred during By September, the southern arches had been formed and the concrete balustrades were being built. By October, all six arches had been formed and work on the piers for the Taintor gates was in progress. During July the concrete sidewalks and curbs were laid, the bituminous road surface was applied, and the bridge was opened to traffic. Locust Street Bridge HAER No. Page 4
Becker, John E. A History of the Village of Waterloo. New York. Waterloo, Waterloo Library and Historical Society, "Contract E." Annual Report of the New York State Engineer and Surveyor. Albany, State of New York, Meade, Norman G. "Waterloo Hydro-Electric Plant." Power 43 (March 28, New York State Engineer and Surveyor. Barge Canal Bulletin. Albany, State of New York, New York State Department of Transportation, Bridge Identification Number File, Region 3, Syracuse, New York. Whitford, Noble E. History of the Barge Canal of New York State. Albany, State of New York,