The documentation of Creager's Bridge was prepared by the Historic American Engineering Record (HAER), National Park Service, during the summer of for the New York State Historic Bridge Recording Project. This project was sponsored by the New York State Department of Transportation and under the supervision of Eric DeLony, Chief & Principal Architect, HAER. This report was written by Andrew Cole and Charles Scott. When citing this report, please credit the Historic American Engineering Record and the authors. This bridge is located on property acquired by the State of New York from William Creager.
Before the Erie [New York State Barge] Canal was dug through this area, the only bridge near this site was the two span Whipple bowstring arch bridge crossing the Clyde River at a point approximately 500 feet south of the present canal bridge. This bowstring arch bridge was the original "Creager's Bridge." The original plan for bridges across the canal, devised in called for twelve or fourteen panel Warren style trusses. By the time the canal construction actually began after the design of the bridges across the canal had been significantly modified. The present Creager's Bridge was erected as part of canal construction Contract 47. This contract included excavation of the canal and construction of all canal crossings in the miles between Galen and Lyons.
Contract 47 was awarded to the Crowell-Sherman Company, Cleveland, Ohio, on November 30, In February the contract was transferred to the Crowell-Sherman-Stalter Company. The abutments, piers, approach spans, and main span superstructure of Creager's Bridge were completed in and work on Contract 47 continued until December 31, when the contract was canceled to permit a major modification of the contract specifications. Work on Contract 47, including the bridge, remained suspended until a contract to finish this section of the canal, Contract 47A, was awarded to the Central Dredging Company, Cleveland, Ohio, on March 22, In August of the completed superstructure of the Creager's Bridge was raised from its piers to permit the passage of a canal dredge to the western end of Contract 47A.
By December the bridge had been lowered to its piers, the floor and deck installed, and approaches filled. During the first five months of work continued on filling, lining, and grading the approach roads and installing bridge coping and highway railings. Creager's Bridge opened to traffic in June of Creager's Bridge HAER No. Page 4 BIBLIOGRAPHY "Contract 47 and 47A," Annual Report of the State Engineer and Surveyor. Albany, State of New York, "Contract No, 47, Creager's Bridge," New York State Archives, Albany, New York, New York State Engineer. Barge Canal Bulletin. Albany, State of New York, New York State Department of Transportation, Bridge Identification Number File, Region 3, Syracuse, New York. Whitford, Noble E. History of the Barge Canal of New York State.
Albany, State of New York,