Lock E28A, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. Description: Lock E28A is located miles west of Lock E27.1 To the north of the lock is a dry dock and the Section 6 Maintenance Shops (see HAER Nos. and Lock E28A is accessed by an asphalt drive extending from NY 31. There is a steel guard rail and a modern steel bridge over the channel to the dry dock and maintenance shops. The lock site consists of the lock and associated structures, powerhouse, lockhouse, and storage shed. Lock E28A has a lift to the west with normal pool elevations of below and above. The concrete chamber walls show signs of severe spalling and breakage.
There are double-leaf, steel miter lock gates at each end of the chamber operated by spars and gear trains powered by DC electro-mechanical gate machinery. The flow of water through the culverts in the chamber walls is controlled by valves also operated by DC electro-mechanical machinery. At both the upstream and downstream corners of the south side of the chamber are control stand shelters. These are single-story frame buildings with horizontal fiber-cement siding and gable- front asphalt roofs. Each has wood pop-out windows and pane-and-panel doors. Concrete-filled cast-iron bollards on concrete pads line either side of the chamber, while pipe railing surrounds the public access side. The lock is illuminated by historic light fixtures.
A steel truss cable bridge spans the center of the lock with stairways at both ends for pedestrian use. Spalling concrete stairs with pipe railings are located at the downstream end of the lock. The lock and control stand shelters are in good condition, but the concrete stairs are in poor condition. Located on the north side of the chamber is the powerhouse, a single-story concrete building on a concrete foundation. The hipped roof is covered with asphalt shingles and has a brick chimney. The original window openings have been filled in with wood. A modern wood double door provides access. The powerhouse is in good condition, aside from the removal of the historic windows. The lockhouse is located on the opposite side of the chamber.
It is a single-story, banked concrete block building on a concrete foundation. The hipped roof is covered with asphalt shingles, and there is a brick chimney. The fenestration consists of four-over-four-light wood 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E28A HAER No. Page 2 windows and the original eight-light storm windows. The entrances are wood pane-and-panel doors. The exposed part of the basement has double pane-and-panel doors. The lockhouse is in good condition. A storage shed is near the powerhouse. The structure is a modern, single-story frame structure on a concrete slab foundation with vertical board siding. The offset side-gable roof is covered with asphalt shingles.
The walls are pierced by awning windows and wood hinged double doors. The shed is in good condition but is non-contributing due to its recent construction. The guide walls are in various conditions. The northwest one is in fair to poor condition. The scored concrete walls are heavily spalling in the areas below the score marks. The section nearest the lock gate shows signs of severe spalling and breaking and is covered with steel plating. The northeast guide wall, on the other hand, is in good condition. The concrete wall is intact and is lined with concrete-filled cast-iron bollards, modern ladders, and light fixtures. The southeast and southwest guide walls are in fair condition.
Both have spalling concrete and are lined with concrete-filled cast-iron bollards and historic light fixtures. History: The lock was constructed as part of Contract 48, awarded on December 29, to Crowell-Sherman-Stalter Company. Work started promptly on the lock with excavation and erection of the concrete mixing plant. By the upper and lower approach walls had been completed, and by July the lock wall had been finished. The following year saw the completion of the concrete work, the placement of the lock valves and buffer beams, and the lock gates.2 The power plant was built under Contract 94, a large contract that included the electrical equipment and machinery for locks E26, E27, E28A, E28B, E29, E30, E32, E33, E34, E35, and guard locks. It was let to MacArthur Brothers Co.
& Lord Electric Co. on February 17, The forms were erected for the powerhouse in January and February That same year, the Annual Report stated the generators, governors, pumps, and oiling system were in place, along with the turbine wheels. The gate and valve machinery had also been installed.3 Later work at the site included the repair of the turbines in The lock was unwatered and overhauled in 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.
1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, and Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 3 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 4 State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Williams Press, Inc., 51; and State of New York, Department of Public Works, Annual Report, (Albany: 83. NEW YORK STATE BARGE CANAL, LOCK E28A HAER No. Page 3