Standard Elevator, 1 Saint Clair Street, Buffalo, Erie County, NY. Surveyed as HAER NY,15-BUF,44-, with a 11,780-word written history.

From the record

“Standard Elevator, 1 Saint Clair Street, Buffalo, Erie County, NY”

Survey record header. Machine-read text.

Surveyed by the federal HAER program as HAER NY,15-BUF,44- · the record runs 11780 words · one of 63 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

11714 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER NY,15-BUF,44-. Not written, edited or summarised by this site.

1 St. Clair Buffalo, Erie County, New York Date: Mainhouse: Building permit issued January 17, completed October, Annex: Building permit application July 30, approved August 13, Designer: Mainhouse: A. E. Baxter Engineering Co. Annex: I.H. Faleide, McKenzie Hague & Co. Builder: Mainhouse: James Stewart Co. Annex: McKenzie Hague & Co., Chicago. Status: Operational Significance The grain elevators of Buffalo comprise the most outstanding collection of extant grain elevators in the United States, and collectively represent the variety of construction materials, building forms, and technological innovations that revolutionized the handling of grain in this country.

Proj ect Information: The documentation of Buffalo's grain elevators was prepared by the Historic American Engineering Record (HAER), National Park Service, in and The project was co-sponsored by the Industrial Heritage Committee, Inc., of Buffalo, Lorraine Pierro, President, with the cooperation of The Pillsbury Company, Mark Norton, Plant Manager, Walter Dutka, Senior Mechanical Engineer, and with the valuable assistance of Henry Baxter, Henry Wollenberg, and Jerry Malloy. The HAER documentation was prepared under the supervision of Robert Kapsch, Chief, HABS/HAER, and Eric DeLony, Chief and Principal Architect, HAER.

The project was managed by Robbyn Jackson, Architect, HAER, and the team consisted of: Craig Strong, Supervising Architect; Todd Croteau, Christopher Payne, Patricia Reese, architects; Thomas Leary, Supervising Historian; John Healey, and Elizabeth Sholes, historians. Large-format photography was done by Jet Lowe, HAER photographer. STANDARD ELEVATOR HAER No. (Page 2) Historians: Thomas E. Leary, John R. Healey, Elizabeth C. Sholes, This is one in a series of HAER reports for the Buffalo Grain Elevator Project. HAER No.

"Buffalo Grain Elevators," contains an overview history of the elevators* The following elevators have separate reports: Great Northern Elevator Standard Elevator Wollenberg Grain & Seed Elevator Concrete-Central Elevator Washburn Crosby Elevator Connecting Terminal Elevator Spencer Kellogg Elevator Cooperative Grange League Federation Electric Elevator American Elevator Perot Elevator Lake & Rail Elevator Marine "A" Elevator Superior Elevator Saskatchewan Cooperative Elevator Urban Elevator H-0 Oats Elevator Kreiner Malting Elevator Meyer Malting Elevator Eastern States Elevator In addition, the Appendix of HAER No. contains brief notations on the following elevators: Buffalo Cereal Elevator Cloverleaf Milling Co.

Elevator Dakota Elevator Dellwood Elevator Great Eastern Elevator Iron Elevator John Kam Malting Elevator Monarch Elevator Pratt Foods Elevator Ralston Purina Elevator Riverside Malting Elevator STANDARD ELEVATOR HAER No. (Page 3) The Standard Elevator stands next to the Buffalo River, immediately upstream of the Ohio Street Bridge and was built in two phases of development dating from and Through its subsidiary the Hecker Company, the Standard Company had Buffalo connections from an earlier date. The Hecker Company established a milling operation in in the newly completed Keystone Warehouse complex, designed by the A. E. Baxter Company of Buffalo. The mill incorporated a small elevating and storage facility.

In the the Standard Company planned a massive mill and elevating complex to be built on newly reclaimed land on the Buffalo lake shore. This design was also by the A. E. Baxter Company and, if completed, would have been the largest milling complex in the world. The elevator alone was to have a storage capacity of seven million bushels. The scheme was abandoned before construction commenced, however, and the Hecker-Jones- Jewell subsidiary was responsible for the expansion of Standard- owned facilities in Buffalo. Having acquired the Buffalo River site in the company planned an ambitious expansion scheme, intending to consolidate its existing Buffalo and New York City operations on the new site.

The first phase, an elevator and mill, was to be followed by a doubling of the storage capacity and two additional mills. The total storage capacity was to be 5 million bushels and the mill was to have a daily output of barrels. Only the first elevator was actually built, however. A change of policy led to a scaling down of the plans, and the equipment from the New York City operation was transferred to the existing facility. The new elevator appears to have been considered surplus to requirements, and within a year of its commission the new Hecker Elevator, as it was originally known, was sold to the Eastern Grain Company. The new owners renamed it the Nisbet Elevator and used it to supplement the existing water to rail transfer facilities at the Concrete-Central complex.

The Standard Company re-acquired the elevator in re-named it the Standard Elevator, and in revived the original plans to build both a mill and an annex to the elevator on the site. Once again the plans were not carried through to completion, and only the storage annex was finished. For the entire operating history of the Hecker/Standard concerns in Buffalo, milling facilities remained in the Keystone complex. The elevator provided storage for the inland facility at the Keystone site and a forwarding facility for contract grain. With the closure of Standard's milling facilities in the town during the the elevator became surplus to that company's requirements and the Pillsbury Company acquired the site to replace its Great Northern facility.

Although generally known as STANDARD ELEVATOR HAER No. (Page 4) the Standard Elevator, the facility was officially known as the Pillsbury Elevator in The Standard Mainhouse lies alongside the river and occupies the westernmost part of the site. The first stage of the milling complex was built parallel to the elevator, while the second elevator of similar design and capacity extended eastward along the river. The elevator measures x and features workhouses at both ends. The western workhouse was intended to supply grain to the onsite mill, while the eastern was designed to provide a transfer facility for contract grain. Both structures were the work of the Buffalo-based A. E. Baxter Engineering Company.

The elevator design was based on the principles established in Budd's patent, and represents a prototype by the Baxter Company that was followed and developed in all their subsequent elevator commissions in Buffalo. Examples include the Eastern States "A" Elevator of the GLF "C" Elevator of the GLF "A" Elevator of and the Eastern States "B" Elevator of The Baxter design features bin bottoms that are raised within the bin walls and bear on an annular concrete ring girder supported by radially arranged basement pillars. However, unlike the Budd-designed Superior "CM of where the ring girder has a circular inner face, the Baxter design is characterized by an inner face with a dodecohedral geometry of twelve flat inner faces. The elevator was built during the construction season.

The site preparation works were undertaken in late and the building permit was issued on January 17, The elevator was completed and received its first shipment of grain in October of The James Stewart Company of Chicago raised the elevator in two lifts of 10 x 3 bins, for a total of sixty bins. Upon completion, the structure provided the largest single unit of storage in Buffalo, and the building remains the largest single unit of conventional bin storage built as a single project in the history of Buffalo elevator construction. Its capacity was only exceeded by the storage hall design of the Cargill Electric. Both bins and workhouses were slip formed from the foundation slab using Folwell Sinks patent jacks. The estimated cost of the elevator was or 15 cents per bushel of capacity.

These figures demonstrate that the theoretical economies of the Budd design were being achieved in practice by the late The elevator has a capacity of three million bushels stored in sixty main bins, three of which are horizontally sub-divided, and thirty-eight interspace bins. The elevator is without outerspace bins but does include six square washer and drier bins. The bin walls rise from the foundation slab to a height of STANDARD ELEVATOR HAER No. (Page 5) but the depth of the bins is less than the total wall height. The main bins are arranged in three parallel non- interlocking rows of twenty bins. The bins have a 25' interior diameter and are arranged in tangential contact on 26' centers. The contact thickening extends for on either side of the center line.

The top of the ring girder is located 12* above the base of the bin wall and the bins extend upwards at full width from this point for The bin hopper bottoms rest within, and extend below, the annular concrete ring girder to give a total bin depth of The three westernmost main bins are horizontally sub-divided; that on the riverside is divided into a shallow upper shipping bin with a lower storage bin. The remaining two bins provide a workhouse function and accommodate a cleaner floor at half height. The two 46' deep upper bins provide feed facilities to the cleaners and clippers, while the two lower bins, in addition to receiving from the cleaners and clippers, also receive washed and dried grain from the adjoining drier house.

The interspace bins are of conventional form and are arranged in two rows of nineteen bins. The bin walls are 8" thick, except within the tangential thickening where the minimum figure is The lowest 14' of bin wall is constructed of concrete; between 14* and 211 the mixture is and above this point it is proportioned in a mix. The vertical reinforcing is composed of twelve round verticals and twelve jacking rods placed alternately about the circumference of the bins. The jacking rods are positioned at the four points of tangential contact with two additional rods placed in the wall between these points. This configuration provides rods spaced eguidistantly about the bin wall on 7 centers.

The configuration is slightly modified in the exterior bin walls, where one jacking rod is dispensed to give a 9' spacing between rods. An ordinary vertical between every jacking rod gives a spacing between the vertical reinforcing elements of in the interior walls and in the exterior walls. At a time when engineers were introducing designs that rationalized the number of verticals employed in interior walls, these arrangements were unusual. The verticals are placed on the center line of the walls, and the horizontals are wired to the outside of the verticals in the typical fashion. The horizontal reinforcing is composed of 204 tank bands of graduated rods at varying course intervals.

In the lowest 10' of walling which forms the basement walls are nine courses of round rod at 12" intervals. From the base of the ring girder to a height of 160 courses of round rod are at 6" intervals. STANDARD ELEVATOR HAER NO. (Page 6) Between 90* and HO1, the course interval increases to From to the bin floor, the bands are placed in courses. The arrangement of horizontals within the divided cleaner bins is somewhat different. The same arrangement of rods placed at 12" course intervals applies to the basement bin walls below the ring girder. The lower bin is reinforced1 with 106 courses of rod on 6" centers over its entire depth of 53 .

The cleaner floor is 63* above the floor slab and extends to a height of Here the wall reinforcement is analogous to that of the basement walling fifteen bands of rod on 12" centers. The base of the upper bins lies at a height of 79' above the foundation slab. The upper bins are reinforced as separate bins, the first 11' with thirteen bands of rod on 10" intervals. Between 11' and the upper bins are reinforced with nineteen bands of rod on 12" centers. The upper 15 of the bin wall is reinforced with rods on 12" centers. The base of these upper bins is supported on concrete beams measuring 4' x and x The beams span the width of the bins. The bins are capped by a 4" thick reinforced concrete bin slab incorporated monolithically with the bin walls.

The bin slab extends beyond the bin line to form a prominent overhanging eave and rests on steel I-beams, the ends of which protrude beyond the bin line and have a concrete cover to produce a corbel detail. The hoppering for the main bins is provided by a conical steel hopper extending the full width of the bin. The hopper rests within an annular concrete ring girder which is raised within the bin and supported by six radially arranged basement pillars. The hoppering is angled at The ring girder is 4'- 6" deep and at its widest point. The girder abuts the bin wall but is structurally separate from it.

The inner side of the girder has twelve flat faces, effectively producing a ring girder composed of twelve "beams." A basement pillar is placed centrally below alternate "beams." The ring girder "beams" supported by a basement pillar are reinforced with seven non-trussed rods in their upper parts and two non-trussed rods in their lower part. The beams unsupported by a basement pillar are reinforced for stress reversals with five non-trussed upper rods in diameter, and two non-trussed lower rods in diameter. Each beam has ten hoops linking the main reinforcing elements. The six basement pillars measure 2' x and are in height. They are placed at 45* intervals about the circumference of the bin.

The interspace bins have reinforced concrete slab hopper bottoms that rest on a square of concrete beams spanning the interspace and are supported within the main bin walls. These STANDARD ELEVATOR HAER NO. (Page 7) walls extend1 through the basement to the floor slab. They are pierced by 8 wide longitudinally positioned conveyor passages within the area of tangential contact thickening. Diagonally placed personnel passages also pierce the bin walls. The total height of the basement is one-third of which lies below grade level. The elevator is built on diameter concrete caissons that extend 9' to rock.

The caissons are distributed so as to coincide with the extremities of the tangentially thickened bin wall; each bin is supported by eight caissons, each of which is shared by adjoining bins. The caissons support a network of foundation beams measuring in depth and between 5* and in width. Although this network of beams forms octagons below every main bin, these are incomplete, as the beams do not continue below the transverse tangential bin contacts. The beams, sufficiently wide to fully support the basement pillars, are reinforced with upper and lower systems of straight rods. The foundation beams support a 10" thick floor slab reinforced with a diagonal grid of round rods on 15" centers.

The bin floor is spanned by a single-story gallery that extends to a width of The gallery is of reinforced concrete pillar, beam and slab construction. The pillars are placed above the tangential bin contacts. The roof slab extends beyond the wall line to form an overhanging eave, while the roof beams similarly extend to form a corbel detail complimenting that of the bin floor below. The gallery is lit and ventilated by deep windows arranged in a pattern of alternate long and short windows Workhouses of reinforced concrete and slip formed construction at both ends of the building extend to a height of Both rise from ground level but only reach their full dimensions above the bin gallery. The eastern workhouse is 38* x 36' and extends for 29 over the bins.

The western workhouse is 38' x 21 and also extends for 29' over the bin floor. Above the bin floor, both workhouses have three stories a distribution floor, a scale floor and a head floor. The eastern house accommodates a single concrete garner bin and the western house two concrete garner bins. The garners are incorporated monolithically into the structure, and are supported on deep concrete beams. The garners measure 18' x and are deep. Each discharges through nine draw-off spouts. The workhouse walls are of slip formed pier and panel construction. The reinforcing consists of inner and outer sets of horizontal and vertical reinforcing with jacking rods arranged independently in the center of the walls. The piers and panels are 12" and 8" thick respectively.

The piers coincide with the STANDARD ELEVATOR HAER No. (Page 8) division of the rectangular scale garner bins and serve to strengthen the fillet at the intersection of bin walls. Transverse trussed concrete beams support, in ascending order, the distribution floor, scale floor and hoppers, the garner bin bottoms, and the machinery floor. The spacing and dimensioning of the beams vary, but the largest are those required to support the garner bottoms and the elevating machinery. Jacking rods are located centrally within the wall on centers but are independent of the main reinforcing. The main reinforcing within any wall is made up of inner and outer verticals and horizontals.

The inner and outer verticals are offset and vary in number, being most frequent (every in the wall of the garner bin. The horizontal rods are graduated and coursed at varying intervals. The dimensions and coursing of inner and outer rods vary independently. The horizontal coursing is at its most dense (every 3M) at the base of the garner bin, graduating upwards to resume the average 12" coursing towards the top of the bin. The graduation of verticals in the workhouse garner bins contrasts with the simpler non-graduated arrangement in the typical non- cylindrical workhouse storage bins, as in GLF "A" for example. In the latter, the storage bins are of relatively small cross sectional area, and have a single central draw-off spout.

The workhouse garner bins, although much shallower, have a larger cross sectional area, and draw-off takes place through nine spouts. The frequent and rapid draw-off of grain through multiple spouts during weighing operations can produce surge pressures that are transmitted to the garner bin walls. Additional steel is required to allow for this condition. A double-track corrugated iron car loading shed was provided below the eastern workhouse. The elevator was equipped with two movable marine towers of structural steel and corrugated iron. A drier and washer house is located immediately to the west of the western workhouse. The building permit for this structure was issued in August of and its design and construction were in the hands of the companies responsible for the main elevator.

Although physically separate, it was operationally an integral part of the mainhouse. The building, of slip formed reinforced concrete construction, features a false gable detail and parapet. It is 27' x 32' and extends to a height of The drier and washer house contain seven 12 long, ee'-S" deep rectangular bins, five of which are arranged along the eastern side of the building. The central bin is wide, while the remainder are in width. The washing plant was originally installed below these bins. The western side of the building contains two shallow bins measuring 19' x 13' and placed at the corners of the structure with the driers and coolers located below. The space between STANDARD ELEVATOR HAER NO. (Page 9) these bins is occupied by stairs, elevating legs and a personnel elevator.

A single-story transformer house, constructed under a separate building permit issued in May of is located along the western boundary of the site. The re-acquisition of the elevator by the Standard Company in brought about a revival of the original scheme for the site. The company commissioned the construction of an annex to the elevator in Although contemporary plans show that it intended to construct a mill adjoining the original elevator with provision for a second mill beside the annex, no milling capacity was installed on the site. The building permit for the Standard Elevator Annex was approved in August of and the bins were raised by November of the same year. Construction involved the consolidation of the riverbank and the construction of a new dock line.

However, as the marine tower tracks did not extend alongside the annex, all grain had to be received and shipped through the mainhouse. The building measures x and was built and probably designed by "construction and design engineers" at the HcKenzie Hague Company of Chicago. The only example of the company's work in Buffalo, it illustrates many interesting and innovative features. The elevator is of the bin wall basement design with bin hopper bottoms raised on radially arranged basement pillars. By devising a means of spreading the main bins longitudinally without disrupting basement conveyor paths, the HcKenzie Hague company was able to produce Buffalo's only example of a bin wall basement design featuring conventional outerspace bins.

Of all the Buffalo elevators, the Standard Annex makes the greatest use of concrete in various elements, as in its unique reinforced concrete conical bin bottom hoppers. Concrete was probably substituted for steel in some applications as a means of conserving steel stocks during wartime. The elevator also boasts the largest concrete bins ever built in Buffalo. The main bins' capacity of bushels is more than four times that of the main bins at Concrete-Central. Although a relatively complex structure, the Annex was constructed with great economy, and demonstrates this aspect of the bin wall basement design. The estimated cost of construction was providing storage at 13 cents per bushel of capacity.

The Standard Annex has a capacity of bushels stored in sixteen main bins, seven interspace bins and fourteen outerspace bins. The main bins are arranged in two non- interlocking parallel rows of eight. The bins are in tangential contact transversely but are spread longitudinally on centers. The area of tangential wall thickening extends for 7'- STANDARD ELEVATOR HAER No. (Page 10) 6" on either side of the center line. At 15' wide, this bin wall thickening is the most extensive of any conventionally binned Buffalo elevator, and reflects the stress differences that can occur between bins of such volume when adjoining bins are subject to differing loading conditions.

The bins are connected by straight longitudinal link walls inside the center line of the bin row, both to increase outerspace volume and to provide a basement conveyor passageway below the center line of the bins. If conventional link walls were used, then that part of the link wall extending into the basement would interrupt a conveying system positioned to receive grain from centrally placed draw-off spouts. A supplementary straight "strut wall" spans the outerspace longitudinally and is placed toward the outside of the bin center line. The strut wall is analogous to a link wall, except that it is divided vertically into three 15* sections. Both link and strut walls are in length.

All bins are in inner diameter except towards the eastern end of the building, where the bin line tapers to accommodate the curve of the railroad tracks serving the elevator. The final bin of the southern (riverside) row is 36* in diameter, while the last two bins of the northern (inland) row are 30 in diameter. The bin walls extend from the foundation slab to the bin floor. However, as the bin bottoms are raised within the cylinders, the actual depth of the bins is less. Measured from the draw-off spout to the bin floor, the main bins are deep and extend above the ring girder at full width for The three smaller main bins are slightly shallower, as the ring girder is raised a further within the bin walls.

The 38' bins have a capacity of bushels, the 36* bins can contain bushels and the 30* bins hold bushels. The single row of interspace bins of conventional form occupies all seven interstices between adjoining cylindrical bins. Measured from the draw-off spout to the bin floor, these bins are deep and have a capacity of bushels. Of the fourteen outerspace bins, six are along the northern (inland) elevation, and seven along the southern (riverside) elevation. These bins have conventional convex exterior walls built to the same radius as the main bins and extend beyond the bin center line to the inwardly placed link walls. An additional outerspace is located along the western end wall of the elevator.

This bin has a straight exterior link wall and is of small capacity as it terminates against the transverse tangential wall thickening. Measured from the draw-off spout, the outerspaces are deep, and, with the exception of the bin mentioned above, have a capacity of bushels. The capacity of the outerspaces of STANDARD ELEVATOR HAER NO. (Page 11) this elevator equal that of the main bins of the Wait-designed elevators such as Concrete-Central and Superior "A" and Outerspace bins are absent in the two available spaces along the diagonal northeast end wall. The bin, link and strut walls are all 8" thick. The minimum thickness of the bin wall in the tangential contact is also 8". The proportioning of the concrete in the bin walls is not known.

The vertical reinforcing in the exterior bin walls is a combination of jacking rods and ordinary verticals, while in the interior bin walls it is made up exclusively of jacking rods. Both ordinary verticals and jacking rods are of round rod. Eighteen jacking rods are placed about the circumference of the main bins. Two are on centers in that part of the bin forming an exterior wall. The remaining fifteen rods are on centers within the interior part of the main bin wall. Jacking rods are absent in link and strut walls. To ensure adequate pull on the forms in this area, the bin wall jacking rods to either side of the point of intersection with link and strut walls are arranged at a reduced interval of 4'.

Conversely, in the area of tangential contact thickening, the interval between jacking rods increases to A jacking rod is at the point of tangential contact, and the next rods are just beyond the area of wall thickening. Ordinary verticals between the jacking rods of the exterior walls provide a 21 interval between the vertical elements of the reinforcing system. Three such verticals were required between the jacking rods of the outerspace quarter walls and that part of the main bin walling forming an exterior wall. The ordinary verticals are lS'-lO" long. Successive rods were lapped over a distance of 1'- 8" and wired together. The jacking rods are in length and were spliced together with sleeves in the usual manner.

The verticals were placed within the center of the bin walls and the horizontal reinforcing wired to the outside of the verticals. The horizontal reinforcing, possibly the most complex system employed in a Buffalo elevator, is 191 tank bands of round rod of graduated diameter at varying course intervals. The horizonal steel in both link walls and quarter walls is graduated; the coursing intervals in the main bin walls alter by as little as to produce a finely engineered structure with an optimum use of materials. The lowest part of the wall below the ring girder forms the basement wall and is not subject to high tensile stresses. It is reinforced with thirteen bands of rod in 12" courses.

From the base of the ring girder at upward, the walls are reinforced with rod at course intervals increasing with height. Above 99 a constant coursing interval of 10" is retained but the rod sizes diminish with height. The horizontal reinforcing for the outerspace quarter walling has the same STANDARD ELEVATOR HAER No. (Page 12) course intervals as the main bin bands. Unusually, the rods within the quarter walling are also graduated by height. An increase in quarter wall rod size between 64 -6" and 99* is required, as the optimum coursing interval has been determined for the main bin walling. From 99 to the bin floor, rod is on 10" centers. Link and strut walls have double link rods at course intervals corresponding to the main tank bands, over which they are hooked.

Single contact anchors are placed at the extremities of the tangentially thickened main bin walls, where they hook about the jacking rods located close to this point. The contact anchors hook about the jacking rods in the usual manner. Triple contact anchors are employed at the intersection of the quarter wall and main bin walls. Such a strong arrangement is unique to the Annex and reflects the stresses involved in bins of such large capacity. Two of the contact anchors pass through the fillet between the quarter walls and main bin walls. Rather than passing through the fillet, the third contact anchor ties the quarter bin forward, linking the exterior segment of the main bin to the quarter walling.

The main bins discharge centrally through a conical reinforced concrete hopper bottom angled at The Standard Annex provides the only example of such construction in Buffalo. The hopper bottom is supported by an annular concrete ring girder with which it is structurally integrated to form a monolithic whole. The ring girder is deep, wide and has a curved inner face. The ring girder is raised within the bin cylinder and is supported by freestanding radially arranged basement pillars measuring x l'-e". Eight such pillars are at 45' intervals within the 38 -2" bins, while only six pillars are necessary in the smaller bins. The concrete hopper bottoms are 6" thick and reinforced by a system of radial and circumferential rods. Radial rods in the lower part of the hopper are at 4* intervals.

In the upper part of the cone unsupported by the ring girder, the radial rods are placed at 2s intervals. The circumferential rods are in diameter and located towards the base of the hopper concrete. They are on 12" centers near the apex of the hopper, and on 6" centers in the upper part of the cone unsupported by the ring girder. The circumferential rods in the uppermost part of the hopper form part of the reinforcing system of the ring girder. In the lower part of this area, they consist of rods placed on 6" centers, and in the upper part of this area of a double row of five, rods also at 6" intervals. The base of the ring girder is reinforced by ten circumferential rods tied together with square bar hoops at 10" intervals.

The hoppering within the interspace bins consists of two STANDARD ELEVATOR HAER No. (Page 13) concrete hopper slabs that slope away from the center of the bin to discharge through spouts at either side of the bin close to the link walls. By this means, the interspace may be discharged to either basement conveyor. The slab is supported by a central longitudinal beam that bridges adjacent main bin tangential wall thickenings and is supported at its center by a single basement pillar. The outerspace bins have concrete hopper slabs sloping to a discharge spout located close to the link wall. This slab is supported by a section of the strut wall within the basement and by a longitudinal beam spanning the outerspace between the contact fillets.

The main bin walls extend through the basement and are pierced between the link walls and strut walls by longitudinal conveyor passages. Personnel passages are arranged diagonally so that people may pass fbetween the area below the main bins. The basement height is 14 -6" to the ring girder. Half the basement lies below grade level, and illumination is provided by two small upper windows per bin cylinder. The elevator is built on rectangular reinforced concrete sub-piers that extend to rock. Piers are located 1below all tangential contacts, where they measure x 4 , below both link and strut walls, where they measure 8* x 4', and below main bin/quarter wall contacts, where they are x 31. The upper part of the piers steps outward to form a broad head.

By this arrangement, all radial basement pillars bear directly on the foundation works. The head of the tangential contact piers measures x that of the link and strut wall piers 15* x and the quarter wall contact piers, 12* x With the exception of a single transverse foundation beam spanning the interspace between the link wall sub-piers and longitudinal foundation beams linking the quarter wall sub-piers, individual piers form no part of the network of foundation beams. The sub-piers support a 9" thick overall floor slab. The bins are capped by a monolithic reinforced concrete bin floor covered across two-thirds of its width by a single-story reinforced concrete gallery. With the completion of the Annex, there has been little subsequent development at the site.

A railroad car tipper was added to the north of the original car shed in The steel and corrugated iron building features a 79* tall elevator tower. The railroad loading shed added below the western workhouse was probably built during Eastern Grain's tenure, when the western workhouse was converted to serve a transfer function.

Business History

Buffalo's third largest grain elevator opened on October 14, STANDARD ELEVATOR HAER No. (Page 14) when the SS John delivered bushels of wheat and bushels of corn to the million facility. Located at 1 St. Clair Street on the Buffalo River, the new elevator was owned by the Hecker-Jones-Jewell Milling Company of New York City, a subsidiary of the Standard Milling Company of New Jersey. Both companies have a long history in Buffalo, before their merger and after, and the St. Clair Street Elevator has operated under both names. Hecker was the more familiar name to Buffalo in The company already operated two small elevators and milling sites.

The Hecker H-0 Company leased the property at 54 Fulton to manufacture the popular H-0 Hot Oatmeal, Force Flakes, and Presto Self-Raising Flour.2 Hecker1s larger mill was located at 503 Seneca Street. This mill was leased from Keystone Warehouse Company in but run under the Hecker-Jones-Jewell imprimatur until the late when Standard Milling assumed control.3 In May, Hecker announced plans to double not only its own milling capacity but that of Buffalo. The company purchased seventeen acres on the outer harbor from the Buffalo Creek, Lehigh Valley, and Erie Railroads with an eye to constructing two elevators, each with a 3 million-bushel capacity. In addition the company planned to add a 25,000-bushel-a-day mill to manufacture flour, cereal, and livestock feed.

That plan was slightly modified in but remained grandiose in design. Neither conception was ever enacted, as outer harbor plans were jettisoned in favor of the more realistic St. Clair Street proposal.4 The plans for the elevator were developed in by Hecker*s parent company, Standard Milling. Through its Hecker subsidiary, Standard bought acres from Buffalo Freight Terminal & Warehouse. Plans were then filed for the new elevator, but Standard still cherished the intention of adding a flour mill with a 10,000-barrel-per-day capacity.5 By the time the elevator was fully constructed, however, the company had revised its plans again, allowing the elevator to operate as a private terminal facility serving its two existing mills.

At least part of the reason for the inconsistencies in planning stemmed from conditions in the agricultural economy of the The early part of the decade was bolstered by recovery and expansion after World War I. Grain dealers and millers received increased supplies of grain, and improved wheat prices made expanded foreign and domestic trade possible and increased profits more likely. Buffalo's grain receipts increased rapidly between and declined somewhat in and rebounded almost 30 percent in and percent in STANDARD ELEVATOR HAER No. (Page 15) A decline in was followed by peak years a yield of over 200 million bushels between and The difficult agricultural years for farmers did not dampen either the volume of Buffalo's trade or the interest of speculators in price and market control.

In Buffalo received its largest shipments ever bushels), which, ironically, coincided with both the beginning of the worst phase of agricultural depression and the best speculative returns for grain traders and merchants.6 The nature of the company's organization also shaped Standard's erratic decisions concerning what and where to build. Both Hecker-Jones-Jewell and Standard Milling emerged from the frenzied period of trust formation characterizing the Hecker was the result of a merger of five milling companies that consolidated in in New York City and later incorporated in New Jersey. Led by Thomas A. Hclntyre, the five companies were George V. Hecker & Co., Jones & Co., Jewell Hilling Co., Staten Island Milling Co., and King County Mills.

In the company incorporated in New York to consolidate its business and operating functions. Three years later, Hecker-Jones-Jewell closed its original mills (including the Hecker) and opened one large mill in New York City.7 In the interim, however, Hecker-Jones-Jewell had gained and lost its independence, all in less than a decade. Hecker's success spurred Mclntyre to greater heights; in he created a gigantic trust he dubbed United States Flour Milling Company which combined milling operations in several states including Hecker-Jones-Jewell.8 Less than one year later, however, in February, the trust's petition for reorganization threatened paybacks to bond holders. As United States Flour Milling trembled on the brink of receivership, it was beset by lawsuits from bond holders like Ora M.

Jewell, who moved to break the trust agreement that eroded her and other creditors' equity. Jewell's9 suit was dismissed, but the trust collapsed nonetheless. From the ashes of the flour trust debacle, financial receivers created Standard Milling Company as a new holding company for the trust's most lucrative properties, including Hecker-Jones-Jewell. Standard was run by those financiers strictly as a holding company, leaving operations to the wholly- owned subsidiaries such as Hecker. Meanwhile, Standard became the conduit for property acquisitions and sales.10 The Company's first foray into Buffalo came shortly after its creation.

When Urban emerged from the United States Flour Milling Trust as an independent entity and established a new mill on Urban and Kehr streets, Standard purchased the original Urban Milling property at 324 Oak. The new company's presence in Buffalo was short- STANDARD ELEVATOR HAER NO. (Page 16) lived, however, as it left the city after In Standard's subsidiary, Hecker-Jones-Jewell arrived in Buffalo to establish the Seneca Street Flour Mill. In it acquired Edward Ellsworth's H-0 Oats Company and the company and elevator on Fulton were renamed Hecker H-O.12 During the Hecker-Jones-Jewell Hills functioned in Buffalo without its own grain elevator for support.

Nevertheless, the company flourished with its popular consumer flours and cereals and merchant flour products destined for sale to the baking industry. The success of the Buffalo operations certainly encouraged the New York headquarters and the parent corporation to direct substantial capital into the city. The top priority was development of a grain elevator. The parent corporation, however, was under some financial pressure. From to its debts were comparatively large relative to assets, and its stock values vacillated considerably through the whole of the decade. The company was unquestionably prosperous but scarcely capable of assuming the projected million necessary to finance the outer harbor plan.

In the company already had debts equal to 80 percent of assets; an additional $11 million would have nearly doubled the debt and made payback impossible. The million cost for the St. Clair Street Elevator was far more realistic.13 In early Standard's comparative fiscal conservatism paid off. The company had vastly improved its profitability without increasing its commensurate debt.

Existing and projected milling and storage properties, coupled with the boom in grain traffic, gave the company prospective profit margins that would fuel Standard's continued healthy growth.14 These improvements made Standard a tempting takeover target, and in April, it was rumored that Standard would merge with Washburn-Crosby, the forerunner of General Hills.15 Later that same year, the company authorized a stock-issue bonus to officers and employees as a reward for a job well done.16 Such evidence of prosperity brought Standard to the attention of a newly-created investment company, the Gold Dust Corporation. Gold Dust was incorporated in September, to consolidate a number of previously independent companies.

One of these was American Linseed; New York City's largest flaxseed and linseed oil operation, it had functioned on the Buffalo River since the To build Gold Dust, the investors bought out the Rockefeller family's preferred stock control over American Linseed, sold its edible oils to Buffalo's Spencer Kellogg, and prepared to 17 employ the capital generated in the sale for acquisition. STANDARD ELEVATOR HAER No. (Page 17) In December of Gold Dust purchased shares of Standard Hilling stock which Standard sold to generate its own capital and retire part of its funded debt. Less than one month later, in January, Gold Dust announced its intent to takeover Standard Hilling.18 The takeover was by no means completely friendly. Standard Vice President Frederick L.

Rodewald actively opposed the proposed stock swap with Gold Dust and in February petitioned every stockholder to withhold approval for the merger. It was too late. The very next day, February 7, the requisite 51 percent of stock was placed in escrow prefatory to the completion of the merger.19 Gold Dust's acquisition of Standard gave the speculator company control of all subsidiaries and properties including those in Buffalo the Hecker Mill, the Hecker H-O Oats Plant, and, of course, the brand-new elevator. The Gold Dust takeover of Standard came at an inauspicious time. The harvest bounty of was not repeated in and grain receipts in Buffalo fell by over 40 percent. The problems were compounded by the stock market crash of October that squeezed even profitable operations.

Gold Dust continued to make money but at a declining rate. The company had to absorb losses incurred by Standard's sale of capital assets just prior to the takeover, and by Gold Dust was forced to liquidate Standard Hilling of Canada.20 To compensate for the declines in assets and profits, Gold Dust also moved to divest itself of properties with a high cash value but less necessary use. One of these was the new grain elevator in Buffalo. In June, less than four months after Gold Dust acquired the Standard and Hecker properties, the St. Clair Street Elevator was sold to a local Buffalo investor and grain merchant, Nisbet Grammer, president of Eastern Grain Elevator Corporation.

Grammer owned the new elevator but ran it, along with four others, on behalf of Eastern.21 For the next ten years, the elevator would be known as the Nisbet. Gold Dust retained control of the existing Hecker Milling operations in Buffalo. In Hay, another move to consolidate assets worked to Buffalo's advantage, when Gold Dust elected to close the Hecker-Jones-Jewell Hill in New York City and transfer all the machinery to Buffalo; the Seneca Street Hill's capacity was increased to over bushels per day.22 Continuing decline in Depression-era grain receipts, however, eroded demand for elevator capacity in Buffalo and other ports. By Buffalo received only 85 million bushels, compared to the nearly 290 million nine years earlier.

The lack of business hurt all United States elevators and mills, but the less diversified local owners, such as Eastern, were damaged most severely. Eastern Grain was also in a state of flux from internal problems of leadership after the death of its two founders, Grammer in STANDARD ELEVATOR HAER NO. (Page 18) and John J. Rammacher in With all of the external and internal pressures, Nisbet Elevator was closed in and sold once again in The irony behind the sale was that it was a repurchase of the St. Clair Street Elevator by none other than Gold Dust, renamed Hecker Products Corporation in a reorganization. The purchase was effected through Standard Milling, which had been made a subsidiary of Hecker.

As a result of that ownership arrangement, the elevator obtained its more familiar name, the Standard. Eastern Grain Elevator sold the elevator to Standard for a mere considerably below its construction cost and presumably below its unpublished sale price.24 The deflated cost was interpreted as a reflection of generally declining real estate values on Buffalo's waterfront; it certainly reflected a considerable windfall for Standard and a blow to Eastern Grain. From to Hecker Products operated with fewer autonomous divisions, several of which had been subsumed under Standard Hilling, now an operating company rather than just a holding company. In Buffalo this meant that the St.

Clair Street Elevator and Seneca Street Mill were part of Standard, while the Hecker H-0 Cereal Elevator and mill were separate and operating under Hecker Products alone.25 In Standard Milling spun off entirely from Hecker (renamed Best Foods) and relocated to Kansas City, Missouri, as a completely independent company. The Standard Elevator and Standard Milling were part of the new company without ties to Hecker. Standard continued to operate the elevator until when it was sold to Pillsbury, the Minneapolis-based company operating on Buffalo's City Ship Canal. PillsburyMcontinues to operate the Standard as a private terminal elevator. MATERIALS HANDLING:

History and Description

Among the remaining active grain elevators on Buffalo's waterfront, the Standard is the nearest living descendant of the classic nineteenth-century wooden marine transfer and storage structures inspired by Joseph Dart and Robert Dunbar. Unlike Frontier, American or Lake & Rail, the Standard is visually unencumbered by adjacent grain processing facilities. As the storage house for Ganson St. operations, the elevator still retains its historic functions of receiving deliveries by water or rail combined with intermodal transshipment, in this case chiefly loading out to trucks. Receiving by Water Grain delivered in lake vessels was unloaded by a pair of STANDARD ELEVATOR HAER NO.

(Page 19) movable marine towers capable of traversing a dock situated between the elevator and the north (right) bank of the Buffalo River. Each tower's marine leg was originally designed to remove grain from a ship's hold at an optimal rate of bu./hr. on the dip, thus rating as perhaps the fastest in Buffalo at the time of their construction. The subcontractor responsible for the marine tower machinery was the Webster Manufacturing Company of Chicago. Each tower stands high and consists of a structural steel framework originally sheathed in corrugated iron. The floor slabs are concrete. Each tower accommodates a retractable marine leg with head and boot pulleys spaced 98' apart on centers.

The crosshead of each marine leg, which carries the head pulley and its driving motor, travels up and down a maximum of 58' as the level of grain within the hold changes. Within each leg, a belt carrying a staggered double row of Buffalo buckets, each 15" x 8", 8" deep and spaced 12" apart, originally scooped up grain from the vicinity of the boot pulley. When grain no longer flowed to the boot pulley by gravity, powered ship shovels moved the cargo within reach of the leg. Each tower also contained apparatus for weighing grain continuously and raising it to the top of the structure and thence to the internal distribution system over the elevator's storage bins.

This weighing and elevating equipment included steel garners above and below a 500-bushel hopper scale, as well as a marine lofter leg with four staggered rows of flat back Buffalo buckets, originally each 14" x 8", 8" deep and spaced 13" apart. The marine lofters discharged grain into fixed V-spouts on the roof of the cupola. Both marine towers remain in active use for unloading deep-draft vessels. The marine towers and legs were originally driven by a series of electric motors with assorted power trains. A 150 hp motor drove the buckets of each leg through a double reduction chain drive. The ship shovel set in each tower was provided with a 100 hp motor and a herringbone helical cut single reduction gear unit.

The hoist raising the counterweighted marine leg operated via a 20 hp motor and silent chain drive. This hoist countershaft motor also drove the pusher boom that moved the marine leg laterally within the ship's hold by using a pair of leather belts for forward and reverse motion. A 200 hp motor connected to the head pulley by a herringbone reduction gear unit powered each marine tower lofter leg. A reversible 30 hp motor with combination gear and silent chain power train operated the winch and cable-haulage arrangement which moved each marine tower along the dock. While some of these motors may have been upgraded by rewinding, the transitional drive trains in the marine towers appear to have remained basically unmodified.27 STANDARD ELEVATOR HAER NO.

(Page 20) The first cargo of grain was unloaded through the Standard marine towers on October 14, when the steamer J. B. John delivered bushels of wheat and bushels of corn.28 The average unloading capacity of the twin marine towers, estimated at bu./hr. as of reflected periods of operation when the ship shovels had to assist the leg in removing grain. This figure remained constant until the early when the nominal unloading rate of each leg was reduced to the present level of bu./hr. Receiving by Rail As of rail cars were unloaded at the track shed on the north side of the elevator adjacent to the east workhouse. Manually-operated power shovels delivered grain to a car pit, the common mode of unloading prior to the advent of car dumpers.

A Weller car puller driven by a clutch-operated 60 hp at 800 rpm motor spotted each car over a receiving hopper beneath the twin tracks. An electrical interlocking mechanism prevented the track grates from being opened simultaneously. A pair of Clark automatic power shovels, also supplied by Weller Manufacturing Company of Chicago, emptied grain out of boxcars and into the track hoppers. A 15 hp motor with flexible coupling drove the car shovels, while a 36" conveyor belt driven by a 7 1/2 hp motor connected the receiving hopper with a short jack leg driven by a 15 hp motor. The jack leg lifted grain discharged into its boot from the rail receiving belt; from this jack leg grain was spouted to the boot of either lofter leg in the east workhouse.

By this equipment was capable of emptying approximately four cars per hour and transferring bu./hr. to the elevator. The car pits are no longer in service; the receiving hoppers have been filled with concrete. In Standard Milling augmented its rail receiving capacity at the elevator by adding a second-hand car dumper.29 Such technology for removing grain from boxcars had been available since the end of the World War I.30 Standard's belated decision to install the car dumper represented a response to the impending completion of the St. Lawrence Seaway. During the construction period, when grain shippers projected a decline in lake transshipments at Buffalo, some elevator operators anticipated a counterbalancing growth in rail traffic.

Despite its relative antiquity, the car dumper was still capable of unloading a 2,000-bushel freight car in about six minutes. Overall rail receiving rates at the Standard Elevator, which had fallen to two cars per hour at the car pit, were projected to at least triple to per day with the car dumper in service. A steel-frame structure, lo,-4" x and deep, housed the new equipment at the north side of the elevator. The dumper installation required new railroad tracks and a diesel engine for STANDARD ELEVATOR HAER No. (Page 21) spotting the cars. As hopper cars replaced boxcars for grain shipments, emptying the cars by tilting them became unnecessary. Although the tilting mechanism is no longer active, both rail cars and trucks continue to use the two receiving hoppers at the car dumper.

Instore Distribution: Horizontal Transfer and Vertical Handling Grain unloaded through the Standard's marine towers reaches the storage bins directly through rooftop V-spouts and cupola turnheads or via the receiving belt conveyors with portable belt loaders. Approximately half the V-spouts now in service are replacements for the originals. As of the two 48" reversible receiving belts, located in the cupola over the bin floor, were driven by 75 hp at 485 rpra electric motors through herringbone reduction gears; belt operating speed was per minute. A Weller self-propelled 8" style AA tripper diverted grain from each belt to the desired storage area.

Grain discharged from storage bins reached the east and west workhouses via three 42" shipping belts running longitudinally through the basement beneath the rows of silos. The motors driving the basement conveyors were originally rated at 60 hp at 600 In the annex, there are two 42" receiving belts on the bin floor and two 42" shipping belts in the basement. Neither pair of belts is continuous with the horizontal transfer systems in the original Hecker Elevator. Bin floor belts in the annex are fed from the distributing belts in the older section, but the annex basement belts terminate at the east workhouse lofter leg boots. The raised interstitial bins in the annex originally could 31be spouted in either direction using the two shipping belts.

Rail shipments unloaded through the car pits were elevated in the east workhouse on two lofter legs with individual capacities of bu./hr. Each leg was driven at the head pulley by a 150 hp at 750 rpm electric motor with an oil- lubricated reduction gear unit. The legs carried double rows of 18" x 8", 8" deep buckets. Upon reaching the workhouse cupola, grain could be sent through either of two concrete, steel-bottom 2,500-bushel garners to be weighed in either of two 2000-bushel Fairbanks hopper scales. Grain was then distributed to storage bins through the spouting or horizontal conveying systems.

The west workhouse contained a comparable lofter leg, garner, and scale for handling shipments out of the elevator via the dock spout, as well as distribution spouts to bins, belts and conditioning machinery. STANDARD ELEVATOR HAER No. (Page 22) Grain Conditioning Original equipment for reconditioning grain was situated at the west end of the elevator.32 From the west workhouse, a spout distributed grain to a receiving bin atop the adjoining drier house; from that point the flow could be routed back to the cleaners and clippers in the lower part of the west workhouse. Three 10,000-bu./hr. double and aspirating Eureka separators were driven by 25 hp motors through double roller chains, and two 1,500-bu./hr. Eureka oat clippers were powered by 75 hp motors. The separators were Model No.

featuring two screens in each shoe and brush sieve cleaners under the seed screens in both shoes.33 The clipping and cleaning machines, manufactured by the S. Howes Co. of Silver Creek, New York, are no longer extant. Grain that required washing or drying reached the distribution floor of the drier house via the transfer spout from the west workhouse and turnspouts to the conditioning bins. Drier house materials handling apparatus included three lofter legs, one supplying the washers and the others serving the driers, and two 9M screw conveyors for horizontal transfer. Other equipment consisted of four 400-bushel wheat washers for smut removal, two 750-bushel direct heat driers, and a set of coolers. The Richmond Manufacturing Company of Lockport, New York, made the washers, and the 0. W.

Randolph Company of Toledo furnished the driers. Once washed, grain was transferred laterally by a screw conveyor, reelevated by one of the lofters, and directed via turnspout to the receiving bins over the driers. Grain that had gone through the full cycle of washing, drying and cooling passed through a screw conveyor, drier house lofter leg, turnspout and drier house receiving bin, before being spouted to the boot of the west workhouse lofter for re-elevation. Cleaners were normally operated for twelve hours, but the driers, being of smaller capacity, required 24-hour operation. Grain delivered by rail car usually required more cleaning than shipments via lake vessels, which were customarily treated at the head of the lakes.

Dust Collection The original dust prevention system for minimizing potential explosions was particularly elaborate. Grain dust was collected and removed through a combination of pneumatic suction and sweeper units located in several areas of the elevator, including storage bins, receiving and shipping belts, elevator legs, the head and scale floors, and the cleaner floor. The principal danger points where dust was generated included lofter leg boot tanks, the car receiving pit, belt loaders, marine leg turnhead spouts, and tripper spouts. Motor-driven exhaust fans included direct connected 60 hp units on the basement and bin floors. STANDARD ELEVATOR HAER No. (Page 23) Dust collected at various points went to a central bin adjacent the track shed.

Dust stored there was compacted by a Monitor Dust Packer and then placed in sacks for shipment. Modifications to the original dust collection system included a sheet metal enclosure adjacent to the drier house used for trapping dust previously vented into the atmosphere from the heating units. This dust was then collected manually with wheelbarrows. Nine new motors plus controls were installed on elements of the dust collecting system in Shipping by Water Shipments out to canal barges or vessels plying the Montreal route were handled through the west workhouse. Grain from storage was taken via the basement conveyors to a 20,000-bu./hr.

lofter leg feeding a 2,500-bushel garner and a 2,000-bushel scale with subsequent delivery to the shipping bin located at the southwest corner of the elevator. Grain was loaded through a telescopic sheet-steel dock spout, 15" in diameter and 42' long when fully extended. As of normal vessel-loading capacity was rated at 30,000-bushels per hour. This quantity was subsequently reduced to 16-17,OOO-bu./hr. by and bu./hr. in By the late the practice of loading grain aboard vessels had been discontinued, and trucks had also ceased their occasional use of the vessel-loading spout. Shipping by Rail The loading of rail cars was handled through the east workhouse.

The sequence of operations commenced with the basement shipping belts that supplied the house lofter legs and thence the workhouse garners and scales. Grain was weighed out in carload drafts to be directed via distribution floor turnspouts to the carloading spouts. Each track in the car shed was originally serviced by a steel carloading spout with a bifurcated attachment designed to fill both ends of a boxcar simultaneously. These attachments are no longer extant since hopper cars have replaced box cars. Initial carloading capacity was 40,000-bushels per hour, equivalent to filling approximately 200 cars during a 10- hour period. After World War II, the carloading rate was downgraded to 150 cars over ten hours. Currently, the capacity of each car spout is rated at 8000-bushels per hour.

Shipping by Truck During recent decades, truck shipments have played an increasingly significant role at the Standard Elevator, and original materials flows have been modified as a result. A truck weigh station was added to the northwest side of the elevator in STANDARD ELEVATOR HAER NO. (Page 24) By the early five spouts had been provided at the northwest end of the elevator for loading trucks at an overall rate of 34,000-bushels per hour. Equipment in the vest workhouse, once dedicated primarily to waterborne commerce, now handles these outgoing shipments to vehicles. Grain deliveries via truck make use of the rail unloading facilities and are capable of discharging 15,OOO-bushels per hour. STANDARD ELEVATOR HAER NO. (Page 25) ENDNOTES 1.

The following paragraphs are based on information from several sources including building permits, plans books and original drawings housed in Buffalo City Hall. Original plans were inspected courtesy of Henry Baxter. A detailed description of the structure appears in Grain Dealers Journal. Special Plans Book 5 165 and Northwestern Miller (11 July 2. Buffalo Live Wire. XI, no. 8 (August, 26. 3. Buffalo Citv Directory. Moody1s Industrials. 4. Buffalo Live Wire. XI, no. 5 (May, 23; Buffalo Live Wire. XIV, no. 1 (January, 9. 5. Buffalo Evening News. 16 April 17; Buffalo Live Wire. xvii, no. 9 (September, 15; Buffalo Courier-Express. 21 December C4, 13. 6. "Grain Corporation and the Guaranteed Wheat Prices, " Quarterly Journal of Economics.

34 (August, "Recovery of the Grain Farmer," Annals of the American Academy 97 (September, Annual Report of the Lake Carriers Association "Cure for the Grain Gamblers," Outlook 140 (1 July "Relationship of Business Activity to Agriculture," Journal of Political Economy 38 (August, 7. Herman Steen, Flour Milling in America (Minneapolis: T. S. Dennison & Company, Inc., Moodyfs Industrials. 8. New York Times. 24 August p. 4; 30 November p. 1; 25 April p. 3; 30 April p. 12; Steen, Flour Milling. 9. New York Times. 22 February p. 9; 14 March p. 14; 14 April p. 3; 25 October p. 8; 17 November p. 10; 24 November p. 16. 10. Steen, Flour Milling. Moody's Industrials. 11. Steen, Flour Milling. Buffalo Citv Directory. 12. Buffalo Citv Directory. Steen, Flour Milling. Buffalo Journal of Commerce.

XIX, no. 11 (November, 13. Moody's Industrials. Buffalo Courier-Express. 21 December C4, p. 13. STANDARD ELEVATOR HAER No. (Page 26) 14. Moody*S Industrials. 15. New York Times. 20 April p. 34. 16. New York Times. 21 September p. 43. 17. Moody's Industrials, New York Times. 26 June p. 39. 18. New York Times. 13 December p. 39; 12 January p. 28. 19. New York Times. 29 January p. 49; 6 February p. 40; 7 February p. 42. 20. Moody's Industrials/ Lake Carriers, p. 21. Buffalo Courier-Express. 1 June 22. Buffalo Courier-Express. 7 May 23. Lake Carriers, p. ill; Buffalo Evening News. 15 February Buffalo Courier-Express. 22 April p. 1; Buffalo Evening News. 22 April Sec. 5, p. 1; Buffalo Courier- Express. 9 October Sec. 5, p. 1; Buffalo Evening News. 8 October p. 10. 24. Moody's Industrials.

Buffalo Evening News. 15 February 25. Steen, Flour Milling. Moody's Industrials. 26. Steen, Flour Milling. Moody's Industrials. 27. On changes in grain elevator power transmission systems see L. Coke Hill, "Recent Advancement in the Construction and Operation of Grain Elevators," Engineering Journal 8 (April, 28. Buffalo Courier-Express. 15 October p. 6. 29. Building Permit (1 June Buffalo Courier- Express . 19 June p. 4. 30. On car dumpers see "New Grain Unloader Saves Time at Elevators," Railway Age 69 (16 July R. T. Kintzing, "Electrically Operated Grain Car Unloaders," Electric Journal 18 (July, F. Newell, "Automatic Box Car Unloaders for Grain," Engineering Journal 5 (September, "Dumping Plant for Grain Cars," Engineering 121 (4 June and STANDARD ELEVATOR HAER No.

(Page 27) 121 (18 June William W. Sayers, "Handling Bulk Materials Mechanically," Transactions of the American Society of Mechanical Engineers 53 31. Buffalo & Erie County Library, Local History Scrapbooks, "Buffalo Harbor," Vol. 3: (Buffalo News. 16 October 32. Building Permit (31 August 33. Shop Order no. (20 April S. Howes Co., Inc., Silver Creek, NY. 34. Building Permit #E02626 (8 June 35. Building Permit (14 May STANDARD ELEVATOR HAER No. (Page 28)

Sources

Unless otherwise indicated by footnotes, descriptions of machinery and process flows have been derived from the following sources. Annual Report of the Lake Carriers Association 11. Buffalo City Directories, Buffalo Courier-Express. 21 December p. C4, 13; 1 June 15 October p. 6; 7 May 22 April Sec. 5, p. 1; 9 October Sec. 5, p. 1; 19 June p. 4. Buffalo & Erie County Library, scrapbooks, "Buffalo Harbor," Vol. 3, p. Buffalo Evening News, 16 April 17; 8 October p. 10; 15 February Buffalo Journal of Commerce. 19 (November Buffalo Live Wire. 11 (August 26; (May 23; 4 (January 9; 17 (September 15. Building Permits, Plans & Contracts, 301 City Hall (17 January (13 August "Cure for the Grain Gamblers," Outlook. 140 (1 July 24. "Dumping Plant for Grain Cars," Engineering.

121 (4 June 121 (18 June "Grain Corporation and the Guaranteed Wheat Prices," Quarterly Journal of Economics. 34 (August Grain Dealers Journal. Special Plans Book. 5 Green's Marine Directory of the Great Lakes [title and publication data varies] ed. ed. ed. ed. ed. ed. ed. STANDARD ELEVATOR HAER No. (Page 29) ed. "The Hecker-Jones-Jewell Concrete Elevator at Buffalo, [Grain Dealers Journal], Grain Elevators of North America. 5th ed., (Chicago: Grain and Feed Journals Consolidated, Hill, L. Coke, "Recent Advancement in the Construction and Operation of Grain Elevators," Engineering Journal 8 (April Kintzing, R. T., "Electrically Operated Grain Car Unloaders," Electric Journal 18 (July Moody S Industrials. "New Grain Unloader Saves Time at Elevators," Railway Age 69 (16 July Newell, F.

"Automatic Box Car Unloaders for Grain," Engineering Journal. 5 (September New York Times. 24 August p. 4; 30 November p. 1; 14 April p. 3; 25 April p. 3; 30 April p. 12; 22 February p. 9; 14 March p. 14; 25 October p. 8; 17 November p. 10; 24 November p. 16; 12 January p. 28; 20 April p. 34; 26 June p. 39; 21 September p. 43; 13 December p. 39; 29 January p. 49; 6 February p. 40; 7 February p. 42. Northwestern Miller. 11 July "Recovery of the Grain Farmer," Annals of the American Academy. 97 (September "Relationship of Business Activity to Agriculture," Journal of Political Economy. 38 (August Sayers, William W. "Handling Bulk Materials Mechanically," Transactions of the American Society of Mechanical Engineers. 53 Steen, Herman. Flour Milling in America. Minneapolis: T. S.

Dennison & Company, Inc., "Third Largest Buffalo Elevator Completed," American Elevator and Grain Trade. (15 February STANDARD ELEVATOR HAER NO. (Page 30) U.S. Army Corps of Engineers, The Port of Buffalo. New York. Port Series No. 41, revised (Washington: Government Printing Office, 45. U.S. Army Corps of Engineers, The Port of Buffalo. New York. Port Series No. 41, revised (Washington: Government Printing Office, 49. U.S. Army Corps of Engineers, The Port of Buffalo. New York. Port Series No. 41, revised (Washington: Government Printing Office, 50. War Department, Corps of Engineers, U.S.

Army and United States Shipping Board, Transportation on the Great Lakes (Washington: Government Printing Office, War Department, Corps of Engineers, United States Army, Transportation on the Great Lakes (Washington: Government Printing Office, STANDARD ELEVATOR HAER No. (Page 31)

Appendix

Mainhouse Cost: Foundation: Caissons diameter, support network of foundation beams 3' deep, and between 5' & wide; reinforced with round rods Basement beams support 10" floor slab reinforced with round rods in diagonal grid Basement: Enclosed within bin walls; bin walls rise from floor slab and are pierced by conveyor and personnel 1passages between bins; radial basement pillars (2 x x S'-e") abutting against bin walls support a concrete ring girder with an outer 12-sided face; the girder is at its widest point and deep; the network of girder reinforcing is not curved to the radius of the bin, but follows the line of the inner face; 1/3 above grade, ventilator openings only Hopper: Conical steel to full width of bin supported on concrete ring girder Bins: Capacity bushels Main bins 20 x 3 in parallel rows, cylindrical 25f in diameter on 26* centers; to height of above floor slab and above the top of the ring girder; three at SW end subdivided horizontally, one for shipping, the remainder accommodate cleaning machinery and cleaner bins Interspace bins 19 x 2 No outerspace bins Square bins, 6 in drier and washer houses Tangential contacts to all bins; contact wall 91- 4" long Wall thickness 8", at contacts 12" Vertical reinforcing, 11 round vertical rods and 11 1" round jacking rods; verticals placed centrally in wall Horizontal reinforcing wired to outside of verticals, graduated round rods at varying course intervals; 3 rods to each course, 30" overlap; pattern of reinforcing differs in cylindrical cleaner bins STANDARD ELEVATOR HAER No.

(Page 32) Bin Floor: Monolithic concrete on I-beams; floor extends to form overhanging eaves with concrete covered ends of the I-beams acting as corbels Gallery: Monolithic concrete with elongated windows between piers Workhouses: Monolithic concrete, vertical pier & panel Integral concrete garner hoppers; vertical reinforcing of staggered inner and outer rod; horizontal reinforcing with graduated rods and varying course intervals; dimensions and coursing of inner & outer rods varies independently Marine Towers: Movable, structural steel clad in corrugated iron REFERENCES: Original plans inspected courtesy of Henry Baxter. Dates from City Building Permits, costs from City Plans Book Detailed descriptions of the structure appears in Grain Dealers Journal.

Special Plans Book, 5 and Northwestern Miller (7 November Annex Cost: Foundation: Rectangular sub-piers, stepped outward to form a broader head; piers arranged so that all pillars, tangential contacts, link & strut walls land above the broadened pillar head; a 9" floor slab lies over the piers Basement: Enclosed within bin walls, bins rising from floor slab; free-standing radial basement pillars support concrete ring girder; 8 pillars in the larger 381 bins, 6 in the 30' bins; pillars I'-IO" x x ring girder has curved inner face, 4 -6" deep x wide, tied into the bin wall; basement height to ring girder, 1/3 above grade; lit by 2 small windows per bin Hoppers: Conical concrete hoppers 6" thick to full width of bin, supported on ring girder; hopper angle 40 ; interspace & outerspace hoppers of slab concrete; those in the interspace slope outward in both directions from a central beam supported by a pillar in the interspace basement; those in the outer space slope to a single draw-off and are STANDARD ELEVATOR HAER No.

(Page 33) supported by beams tied to the bin walls and a downward extension of the strut wall Bins: Capacity bushels Main bins, 8 x 2 in parallel rows, all bins in diameter, except at the east end where the building tapers; the final bin of the southern row is of 36' in diameter; the last two bins of the northern row are 30* in diameter; bin height - 6" from foundation slab, from top of ring girder 7 interspace bins 14 outerspace bins, convex 1/4 circle outer wall; inner wall is not at closest point of contact between bins, but inside this point Tangential contacts transversely, non-tangential contacts longitudinally, by link and strut walls; tangential contacts are 15' wide; the link walls are not positioned at the closest point of contact between bins, but inside this line; a supplementary strut wall divided vertically into three 15" sections spans the outer bin outside the line of closest contact; link and strut walls are straight; link walls long Wall thickness 8", at tangential contacts 8", strut walls 8" Vertical reinforcement round rod for both ordinary verticals and jacking rods; 18 jacking rods per 38' bin, 3 per 1/4 bin wall Ordinary verticals in exterior walls only on 18" centers; verticals long with 20" overlap and centered 3" inside the outer surface of the wall Horizontal reinforcing, round rod in graduated sizes at variable course intervals; outerspace bin walls reinforced with smaller bars for any given course; 1/4 wall bars hooked over the main bin bands and tied to the main bins by triple contact anchors bent about main bin verticals The contact anchors are of bar, two tying back through the fillet and one forward; link & strut walls have double contact bars at every course Bin Slab & Monolithic concrete on I-beams Gallery: Monolithic concrete REFERENCES: Original drawings are housed in Buffalo City Hall.

City Building Permits provide the dates and City Plans Book for costs.

In context

Buffalo, New York The place record: every map, photograph and survey of this town.
Erie County, New York 204 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Buffalo

24 of 55 records shown

The federal surveyors worked through Buffalo building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Buffalo Grain ElevatorsHAER NY,15-BUF,27-36,310 words
Superior ElevatorHAER NY,15-BUF,46-17,782 words
Concrete-Central ElevatorHAER NY,15-BUF,28-14,392 words
Great Northern ElevatorHAER NY,15-BUF,32-11,717 words
Cooperative Grange League Federation ElevatorHAER NY,15-BUF,30-11,692 words
Spencer Kellogg ElevatorHAER NY,15-BUF,35-11,088 words
Lake & Rail ElevatorHAER NY,15-BUF,37-10,206 words
Marine "A" ElevatorHAER NY,15-BUF,39-9,905 words
American ElevatorHAER NY,15-BUF,26-8,401 words
Saskatchewan Cooperative ElevatorHAER NY,15-BUF,43-8,121 words
Washburn Crosby ElevatorHAER NY,15-BUF,48-7,837 words
Electric Grain ElevatorHAER NY,15-BUF,31-7,740 words
Oldman Boiler WorksHAER NY,15-BUF,41-7,374 words
Connecting Terminal ElevatorHAER NY,15-BUF,29-6,604 words
Oldman Boiler WorksHAER NY,15-BUF,41A-5,737 words
Perot Malting ElevatorHAER NY,15-BUF,42-4,401 words
Darwin D. Martin HouseHABS NY,15-BUF,5-4,334 words
Ansley Wilcox HouseHABS NY,15-BUF,12-4,005 words
Wollenberg Grain & Seed ElevatorHAER NY,15-BUF,49-3,523 words
Buffalo City HallHABS NY,15-BUF,13-3,303 words
H-O Oats ElevatorHAER NY,15-BUF,34-3,042 words
Urban Mill & ElevatorHAER NY,15-BUF,47-2,678 words
U. S. Custom HouseHABS NY,15-BUF,10-2,504 words
St. Paul's Episcopal CathedralHABS NY,15-BUF,8-2,485 words

Provenance

  • Written history. Quoted verbatim from HAER NY,15-BUF,44-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.