BlockBefore

Connecting Terminal Elevator, 100 Fuhrmann Boulevard, Buffalo

Connecting Terminal Elevator, 100 Fuhrmann Boulevard, Buffalo, Erie County, NY. Surveyed as HAER NY,15-BUF,29-, with a 6,604-word written history.

From the record

“The grain elevators of Buffalo comprise the most outstanding collection of extant grain elevators in the United States, and collectively represent the variety of construction materials, building forms, and technological innovations that revolutionized the handling of grain in this country.”

Written record, HAER NY,15-BUF,29- survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY,15-BUF,29- · the record runs 6604 words · one of 63 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

57 words

Source document Quoted word for word from HAER NY,15-BUF,29-. Not written, edited or summarised by this site.

100 Fuhrmann Buffalo, Erie County, New York Date: Mainhouse: application for building permit filed May 25, approved June 2, completed Spring, Annex: building permit application April 13, approved August 4, Designer: Mainhouse: H. R. Wait, Monarch Engineering Annex: George B. Field or Theodore Green, Jr. Builder: Mainhouse: Monarch Engineering, Buffalo Annex: Hydro Construction Company, Buffalo Status: Derelict

Significance

40 words

Source document Quoted word for word from HAER NY,15-BUF,29-. Not written, edited or summarised by this site.

The grain elevators of Buffalo comprise the most outstanding collection of extant grain elevators in the United States, and collectively represent the variety of construction materials, building forms, and technological innovations that revolutionized the handling of grain in this country.

Written history

6456 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER NY,15-BUF,29-. Not written, edited or summarised by this site.

The documentation of Buffalo's grain elevators was prepared by the Historic American Engineering Record (HAER), National Park Service, in and The project was co-sponsored by the Industrial Heritage Committee, Inc., of Buffalo, Lorraine Pierro, President, with the cooperation of The Pillsbury Company, Mark Norton, Plant Manager, Walter Dutka, Senior Mechanical Engineer, and with the valuable assistance of Henry Baxter, Henry Wollenberg, and Jerry Malloy. The HAER documentation was prepared under the supervision of Robert Kapsch, Chief, HABS/HAER, and Eric DeLony, Chief and Principal Architect, HAER.

The project was managed by Robbyn Jackson, Architect, HAER, and the team consisted of: Craig Strong, Supervising Architect; Todd Croteau, Christopher Payne, Patricia Reese, architects; Thomas Leary, Supervising Historian; John Healey, and Elizabeth Sholes, historians. Large-format photography was done by Jet Lowe, HAER photographer. Historians: Thomas E. Leary, John R. Healey, Elizabeth C. Sholes, CONNECTING TERMINAL ELEVATOR HAER NO. (Page 2) This is one in a series of HAER reports for the Buffalo Grain Elevator Project. HAER No. "Buffalo Grain Elevators," contains an overview history of the elevators.

The following elevators have separate reports: Great Northern Elevator Standard Elevator Wollenberg Grain & Seed Elevator Concrete-Central Elevator Washburn Crosby Elevator Connecting Terminal Elevator Spencer Kellogg Elevator Cooperative Grange League Federation Electric Elevator American Elevator Perot Elevator Lake & Rail Elevator Marine "A" Elevator Superior Elevator Saskatchewan Cooperative Elevator Urban Elevator H-0 Oats Elevator Kreiner Malting Elevator Meyer Malting Elevator Eastern States Elevator In addition, the Appendix of HAER No. contains brief notations on the following elevators: Buffalo Cereal Elevator Cloverleaf Milling Co.

Elevator Dakota Elevator Dellwood Elevator Great Eastern Elevator Iron Elevator John Kam Malting Elevator Monarch Elevator Pratt Foods Elevator Ralston Purina Elevator Riverside Malting Elevator CONNECTING TERMINAL ELEVATOR HAER NO. (Page 3) The Connecting Terminal Elevator occupies a waterfront site on the west side of the Buffalo Ship Canal immediately upstream of its confluence with the Buffalo River. The previous wood Connecting Terminal Elevator was completely destroyed by fire on March 9, The owner, the Pennsylvania Railroad Company, immediately commissioned a new concrete elevator to replace the structure, and within the year a new facility at the port was receiving grain.

The contract was awarded to the Buffalo-based Monarch Engineering Company, and was built to the design of its chief engineer, H. R. Wait. The elevator was the precursor of a series of standard Wait- designed structures, including the entire Concrete-Central complex and the first two phases of the Superior Elevator, with later derivative forms including the annexes to the American and Perot elevators. The Connecting Terminal Elevator building is x 66' and is of the full basement type with the bins supported on a full bin slab. The building permit was filed in and the structure was completed by late winter of the next year, receiving its first boat in February of The construction cost was or 21 cents per bushel of storage.

The basement works were constructed by conventional fixed form techniques, and the bins were built by slip form methods, presumably by the threaded jacking rod system used by the Monarch Company. Structural steel work and plaster walls were used above the bin floor.1 The elevator had a capacity of bushels stored in three parallel rows of ten cylindrical bins. The main bins were approximately 20' in inner diameter and rose 90' above the bin slab. They enclosed two rows of nine interspace bins. Additionally, the elevator featured thirty outerspace "pocket bins" placed between the external walls of the main bins. The outer wall of these bins was convex and one-third the circumference of the main bins.

The main bins had a capacity of bushels, the interspace bins bushels and the outerspace bins bushels. The main bin at the northeast corner of the complex was horizontally sub-divided for shipping by boat, the first known instance of such horizontal subdivision of a concrete bin in Buffalo. The main bins were connected both longitudinally and laterally by link walls. Connecting Terminal was the first concrete elevator in Buffalo to use such an arrangement in an attempt to expand the storage volume of both outer- and interspace bins. The precise dimensioning and reinforcing arrangements of the bins are unknown, though they are assumed to have been very similar to those of Superior "A" Elevator. Hoppering was provided by an inclined mortar slab placed on CONNECTING TERMINAL ELEVATOR HAER No.

(Page 4) slag concrete poured on top of the bin slab. Draw-off was provided by small conical steel hoppers resting within the bin slab. The bins were supported on a full bin slab which in turn was supported by square basement pillars, providing a full basement height of The pillar heads broadened in an inverted pyramid form. The outer rows of pillars were rectangular and had bracketed heads. Four pillars were spaced equidistantly below every main bin. The outer pillars were below the intersection of the main and outerspace bin walls. The exterior basement wall was formed of panels of rusticated concrete block infilling between the outer row of pillars. Connecting Terminal was the last Buffalo elevator to show such elaboration in the detailing of the basement walling.

An elongated window extended the full width of the top half of each panel. The pillars rose from a foundation slab supported on wooden piling. Unlike other representatives of Wait's early work, the bin floor was apparently of concrete rather than book tile. The concrete was supported in the usual manner by transverse I-beams which were raised with the forms and supported the working floor during construction. A single-story gallery of structural steel with a reinforced concrete roof extended across the full width of the structure. A workhouse of structural steel with plaster walls and concrete roof was placed above the bins toward the northern end of the structure. It rose to above grade.

As originally built, the workhouse had three bays and accommodated three elevator legs and sets of weighing equipment. An additional bay was added on the southern end of the structure to accommodate another lofting leg. The date of this addition is not known, though it may date from the addition of the second marine tower. The original elevator was only equipped with one marine tower built by the Monarch Company. It was moveable along tracks that extended the length of the elevator. The structure was high and was of structural steel clad in corrugated iron. A second marine tower of the same pattern as the first was added at a later date. A double-track railroad shed of structural steel and corrugated iron abutted the northwest side of the elevator, below the workhouse.

A personnel lift tower of steel and corrugated iron was placed on the south elevation and rose slightly above gallery level. Little development took place at the site until after World War II. In a 60' drier tower of structural steel clad in corrugated iron was added to the north of the elevator. The most significant addition to the complex occurred in with the construction of an annex south of the existing elevator. The annex measured x and was slightly separated from the mainhouse, but the gallery bridged the two structures. The annex is of interest not only as the last CONNECTING TERMINAL ELEVATOR HAER No. (Page 5) elevator to be built in Buffalo, but also as the city's only representative of the tunnel type elevator.

The design, although retrograde by having more in common with small "country" elevators than large "terminal elevators," represented a continuum of design practice dating back to Haglin's pioneering structures. The building was constructed by the Hydro Construction Company of Buffalo possibly to the design of George B. Field. The building permit was approved in The estimated cost of construction was or 60 cents per bushel of capacity. Such a figure indicated a substantial post-war increase in construction costs, especially considering the simplicity and economy of the design and the absence of headworks. The elevator had a capacity of bushels stored in two parallel rows of five cylindrical bins of an interior diameter of and a single row of four interspace bins.

There were no outerspace bins. Although the original plans show bin walls rose to a height of above the foundation slab, as constructed the walls rose to to provide a bin floor that was level with that of the original elevator. The bins were in tangential contact in both directions, the tangential thickening extending for 4' either side of the bin center lines. The bin wall thickness was only 6", with a minimum thickness of 8" at the tangential contact. The vertical bin wall reinforcing was comprised of jacking rods of intermediate grade new billet and in diameter. Sixteen jacking rods were arranged equidistantly about the circumference of the bin, on 6' centers such that a jacking rod was placed at every tangential contact.

They were supplemented by ordinary verticals of unknown dimension. Two ordinary verticals were placed between the jacking rods in the external wall in all contact thickenings, while only one such vertical was required in the internal walling. The verticals were located in the middle of the bin wall. The horizontal reinforcement was comprised of graduated round rods at a regular coursing interval of 8". The courses of rod diminished from fifty-nine at the foundation slab to twenty at the top of the wall. The horizontals were tied to the inside of the verticals, an arrangement found at no other Buffalo elevator. The bin walls rose directly from a 20" reinforced concrete foundation slab. No basement was provided, the bin bottom hoppering being placed directly on the foundation slab.

The hoppering was comprised of 4" slabs of inclined reinforced concrete resting on foundry sand, the hoppering extending across the width of the bin. The bins discharged via centrally placed steel spouts in the foundation slab to the sub-surface longitudinal conveyor tunnels that laid beneath the foundation CONNECTING TERMINAL ELEVATOR HAER No. (Page 6) slab and extended along the full length of the elevator. There were two such tunnels below the center line of each row of bins. The tunnels were 7' x 9' and rose from a 14" tunnel slab. The structure of the tunnel was integral to that of the foundation slab. The foundation slab and tunnel were supported by 500 wooden piles 10" in diameter. The piles were arranged in the ring configuration typical of this style of elevator construction.

In addition to the ring of piles below the bin walls, piles were also placed along the line of the vertical wall of the conveyor tunnels. These piles extended for 3' within the tunnel walls. The bin floor was of monolithic concrete and followed the line of the bins. A single-story structural steel gallery with corrugated iron walls and a concrete roof covered most of the bin floor. The marine tower tracks did not extend along the waterside length of the structure as no spouting arrangements were provided in the gallery. The final addition to the complex occurred in when a railroad car dumper was installed to the southwest of the new annex. The dumper was accommodated in a structural steel and corrugated iron shed.

To facilitate the lofting of the grain from the dumper a workhouse of structural steel was built above the gallery in the southwest corner of the annex. The workhouse rose to above grade.

Business History

The Connecting Terminal Grain Elevator located in Buffalo at the mouth of the Buffalo River has had a long, complex history as a business enterprise. The extant facility is actually the second elevator built on the site by the Connecting Terminal Railroad, the first, wooden elevator "A", having burned March 9, The elevator fire excited notice in local newspapers, in part because the absentee owners did not immediately appear to assess the damage and make plans for rebuilding. With Connecting Terminal "A" gone, there were not enough elevators on the city's waterfront to handle the massive grain load bound for the Buffalo port.3 At the time of the fire, the elevator's parent company, was based in Philadelphia with offices at the North Street Station.

The company had originally been incorporated in New York City on June 7, in order to control .31 mile of terminal railway and miles of siding in Buffalo. Although its earliest corporate history is not entirely clear, records indicate that was relatively autonomous and CONNECTING TERMINAL ELEVATOR HAER No. (Page 7) locally directed in Buffalo. By however, much of the control had been shifted to owners and directors from both New York state (New York City and Buffalo) and Pennsylvania (primarily Philadelphia). was closely interlocked with a myriad of other rail lines, but whether it was owned by any other line in its earliest days cannot be ascertained from public documents.4 In directors from New York, Buffalo, and other cities interlocked with many other competing lines.

In the years before the Sherman Antitrust laws became enforced and before the Clayton Act outlawed interlocking directorates, intimate relations between and among theoretically competing businesses were common. Such collusive arrangements made joint ownership unnecessary because companies quite openly fixed prices, delegated market shares, and controlled services with complete disregard for competition and public well-being. The two lines most closely affiliated with were the Western New York & Pennsylvania Railroad which acquired and the Pennsylvania Railroad which acquired and thereby assumed control over the Buffalo line as well. In the mid to late some of the top railroad men in America served as directors, making it of considerable importance to large business interests.

Between and the lines with the strongest ties to included Erie & Western Transportation (E&WT), and the Pennsylvania and Delaware railroads. Directors included President William H. Barnes, Joan K. Barclay, Albert J. County, later PRR vice president, and George E. Bartol, also a director of Girard National Bank, a primary capital source for Connecting Terminal and the Pennsylvania Railroad. John Pugh Green, a director in of both and the Delaware Railroad, was later president of the Lewis Neilson was then Secretary of and later director of 112 corporations controlled by the Pennsylvania Railroad.

Isaac Seligraan, a prosperous Wall Street financier, was on the Connecting Terminal board of directors as well as the board of E&WT director Frank Firth was also on the board, with only one local director left in the Pascal Paoli Pratt, founder of Buffalo's Pratt & Letchworth Saddlery Hardware Company and a director of Buffalo's Manufacturers & Traders Bank.5 The transformations in direct ownership are not recorded in public records, but it appears that after a decade or so of independence, had established strong ownership links with Erie & Western Transportation. E&WT owned 378 shares of Connecting Terminal as of May 17, and was a signatory to mortgages as well as an underwriter of the requisite CONNECTING TERMINAL ELEVATOR HAER No.

(Page 8) collateral secured with E&WT bonds.6 By Connecting Terminal was clearly a subsidiary that had been absorbed by the powerful Pennsylvania Railroad. Full surrender of capital stock to PRR did not occur until when a formal transaction changed a legal lease arrangement between and Connecting Terminal. The legal fiction of as leasing the right of way from Connecting Terminal was abandoned since the latter was a wholly-owned subsidiary of and both were under the thumb of the Pennsylvania Railroad.7 By when the elevator fire occurred and finally sought to rebuild the waterfront facility, it did so on behalf of the Pennsylvania Railroad.

The deed of conveyance of the property upon which the new concrete, fireproof elevator would be constructed notes that Connecting Terminal, and the PRR were all equal in ownership of the property; in actual fact the elevator and the connecting rail lines were to be run fully on behalf of the giant railroad concern from that date forward.8 The railroad ran the elevator until when it relinquished daily management and operations to a new company, the Lake Elevator Corporation. This company was a partnership between Armour Grain Company, a subsidiary of the giant Chicago meatpacking concern, and the local Buffalo grain trading firm, Eastern Grain Mill & Elevator Company.

Lake Elevator thereby briefly established local control, if not ownership, over Connecting Terminal Elevator.9 By the Armour and Eastern Grain interests had lost interest in the facility and relinquished management control to the Connecting Terminal Railroad. Connecting Terminal Elevator was then leased to Atlas Grain Elevator Corporation, while the rail line and warehouse rights were once again "leased" to parent, the Pennsylvania Railroad. Atlas Grain was itself a subsidiary of Van Dusen, Harrington Inc., a Minneapolis grain house. Van Dusen had acquired King Midas and several other grain and milling concerns, the former of which was a leader in durum milling which served the baking trade and domestic markets.

In both partners died, and the company was taken over by the giant grain conglomerate, Peavey & Company.10 The Pennsylvania Railroad never relinquished its formal ownership over the property, even as direct, day-to-day operations changed hands. During World War II, the elevator was taken over by the Superior Grain Corporation, another large Buffalo grain trading and elevator company. Superior took full advantage of the Connecting Terminal's substantial capacity. In the pressure to move grain eastward for export to allied powers embroiled in the war led the government to convey ten million bushels to Buffalo elevators until it could be shipped to CONNECTING TERMINAL ELEVATOR HAER NO. (Page 9) eastern ports. Superior Grain was well-placed to handle substantial portions of that consignment.

After the war, Superior was equally ready for the bounteous post-war crop yields of and the two largest shipments received in Buffalo since the Superior Grain received these and successive Commodity Credit Corporation storage receipts until it relinquished control over Connecting Terminal Elevator in the early Superior Grain was succeeded briefly by Connecting Grain Terminal Corporation, a local incarnation headed by Everett Flinchbaugh, a Buffalo grain trader and president of the Buffalo Corn Exchange. Unlike other companies, Connecting Grain Terminal Corporation had briefly acquired a partial ownership interest, not just a lease, in the elevator itself in The joint venture with the Pennsylvania Railroad did not survive, however.

By Connecting Terminal Elevator was again the sole property of the railroad and was leased to General Grain Corporation, an Indianapolis firm. Its management subsidiary handling daily operations was known as Buffalo Terminal Elevator, Inc. General Grain promised to bring grain supplies to Buffalo that previously had been shipped elsewhere, but its enthusiasm was not matched by grain receipts, and it vacated the lease in the early In Continental Grain Corporation, one of the five largest international grain marketing companies, acquired the lease from Pennsylvania Railroad. General Grain's failure had caused Connecting Terminal Elevator to close for a period of time, but Continental revived the facility.

As Superior Grain had attempted to do just after World War II, Continental proposed to use Connecting Terminal Elevator to warehouse massive grain holdings destined for export by the government. Continental's plans were short-lived, however, as all terminal elevators closed in quick succession when Buffalo lost its preferential rail rates connecting the city to eastern ports. In Continental canceled its lease on Connecting Terminal. In the Pennsylvania and its subsidiary, agreed to form a non-operating real estate holding company known as Penndel ("Pennsylvania Development") Company.

The property ownership was thus submerged in a more complicated set of relationships that increasingly distanced the railroad from actual operations and rendered the elevator a mere "cash cow" for the company rather than an active productive property.14 By the the Pennsylvania Railroad was in bankruptcy with its passenger operations absorbed by the newly-formed government rail company, Amtrak, and its rail equipment maintained by another government agency, Conrail. Pennsylvania's CONNECTING TERMINAL ELEVATOR HAER No. (Page 10) property development arm survived, however. Penndel continued to own the Buffalo elevator and adjoining tracks and their rights of way.

The elevator, which remained idle after Continental Grain withdrew, became something of a white elephant for Penndel; it was not until that the railroad development company finally sold the now-derelict elevator to Jeffrey Davis and John Edwards of the Buffalo River Marina for Penndel reserved the trackage and "appurtenances thereto" and the right to enter the premises to remove rails for scrap.15 The property was renovated as a shoreline docking facility, but efforts to rehabilitate the elevator came to nothing.

The owners developed substantial mortgage costs but not much else, and in came within three days of losing the entire property to their primary backer, M & T Bank of Buffalo, the successor to Manufacturers and Traders which had business links to the elevator at the turn of the century. In April, Buffalo engineer Harold Gantzer purchased the entire property for a reported million. He moved immediately to secure the grain elevator and to upgrade the riverbank docking facilities.

His goal is to convert the draughty grain elevator into housing, and he has contracted to begin some preliminary renovations.16 Because the elevator is one of the most visible on Buffalo's waterfront and one with a remarkable history tied to the fortunes of some of the world's most important transport and grain merchant operations, local preservationists hope that such renovation can preserve the structure as a reminder of the glory that once was Buffalo. CONNECTING TERMINAL ELEVATOR HAER No. (Page 11) MATERIALS HANDLING:

History and Description

In March of an overnight fire consumed the Connecting Terminal Elevator "A", one of the largest wooden granaries on the waterfront with a storage capacity of bushels.17 Built in its machinery had been designed by the eminent elevator engineer, Robert Dunbar.

Among the elevator's features was an early version of a steam-powered movable marine tower; according to Dunbar's own account, this leg could travel an overall distance of 18' along the dock to facilitate the unloading of larger vessels.18 After the debris from the conflagration had been cleared away, the task of rebuilding Elevator 19"A" with fireproof materials commenced on April 28, The advantages of the site included the nearby tracks of the Pennsylvania railroad with accommodations for 200 cars and a convenient dock location at the juncture of the City Ship Canal and Buffalo River near the harbor entrance that was more accessible than locations further upstream.

Monarch Engineering Company of Buffalo designed a reinforced concrete storage facility with a raised basement; the workhouse framework was structural steel with reinforced concrete floors and roof as well as non-combustible plaster walls. Storage capacity aggregated bushels, and equipment was provided for receiving grain by water or rail and for deliveries to boats and cars. Original operations were powered throughout by a dozen individual General Electric motors. The first grain shipment was received on February 4, However, an imbalance in the respective capacities of the receiving and shipping machinery rendered it impossible to take grain into the elevator as rapidly as it could be loaded out. In storage capacity was expanded by bushels in an annex south of the structure.

Hydro Construction Company of Buffalo designed and built the addition. Connecting Terminal was disemboweled during the early in the course of an abortive adaptive reuse project.20 The marine towers, headhouse and track sheds are no longer extant, and other machinery has also been scrapped. A few V-spouts still stand amid the ruins of the conveyor gallery over the storage bins. Among Buffalo's principal surviving steel or concrete waterfront transfer elevators (as distinguished from houses serving adjacent processing facilities) are Concrete-Central, Superior, Marine MA", Standard, Great Northern and Saskatchewan (Pool). This site and the Pool have suffered most from disuse and demolition. CONNECTING TERMINAL ELEVATOR HAER No.

(Page 12) Receiving by Water As of grain was unloaded from lake vessels through a single marine tower, self-propelled and mounted on the ordinary sets of car wheels used for this purpose. A second tower, projected to possess equivalent capacity, had been placed in service by The original tower contained a marine leg rated at bu./hr., upper and lower garners (presumably of bushel capacity each), a 400-bushel receiving scale and a bu./hr. marine lofter leg that re-elevated instore grain to the exterior V-spouts for further distribution within the elevator proper. It may be assumed that machinery arrangements within the marine towers were comparable to those at the Monarch-designed Superior21 and Concrete-Central elevators dating from the same period.

In those instances the marine leg was driven from a motor mounted at the crosshead while other functions, including the leg pusher, hoist winch and ship shovels, received power from a motor located on the first floor of the tower through a series of rope drives and geared connections. The motor for the marine lofter was situated at the bin floor level of each tower with power transmission to the head pulley via rope drive and pinion reduction gearing. The marine towers at Connecting Terminal may also have featured the same kind of dump tank provided at Superior for diverting elevated grain back to the bottom of the marine lofter.

Though activation of a second marine leg should theoretically have doubled receiving rates to a maximum of bu./hr., in fact this anticipated level of performance never materialized, perhaps due to constraints associated with the number of instore conveyors or their carrying capacity. Actual vessel unloading rates appear to have averaged bu./hr. from the through the mid-1930s. n The dock itself was reinforced with sheet piling in During the late some upgrading of the machinery in the marine receiving sequence may have occurred along with the expansion of storage capacity. Receiving by Rail Originally, cars could be unloaded in a two-track shed located on the west (lake) side of the elevator adjacent to the workhouse.

Arriving boxcars were spotted by a car puller (also used in the shipping process) over a single receiving pit, equipped with the requisite power shovels that were used by their operators to scoop out the contents. Grain from the car pit was subsequently elevated by a short jack leg and then spouted to the CONNECTING TERMINAL ELEVATOR HAER No. (Page 13) boot of one of the main house lofters for elevation to the apex of the headhouse, where weighing and instore distribution followed. The initial rail receiving rate was bu./hr., equivalent to emptying an average of two boxcars every hour. As part of an expansion program that preceded the opening of the St. Lawrence Seaway, the Connecting Terminal Elevator Corp.

Division of Harper Feed & Grain installed a car dumper of undetermined type and capacity in The dumper operated in conjunction with an additional lofter leg of undetermined capacity and a secondary workhouse located at the south end of the storage annex. The dumper permitted cars to be unloaded more rapidly than could be accomplished through the car pit. This equipment is no longer extant. Instore Distribution: Vertical and Horizontal Handling Grain unloaded from vessels and elevated through the marine towers could be spouted directly from the V-hoppers atop the building to certain storage bins without halting the machinery in order to shift the towers along the dock.

Alternatively, marine receipts could be transferred via turnheads and portable belt loaders to a pair of conveyors running longitudinally through a gallery or cupola over the bin floor; these belts carried instore grain to bins beyond the reach of direct spouting from the marine towers. The bin floor belts, of undetermined width, each had a rated carrying capacity of bu./hr. As of all the conveying machinery in Connecting Terminal had been supplied by the Webster Co. of Tiffin, Ohio. Grain arriving via rail was elevated by the house lofters, each rated at bu./hr. There were originally two such legs in the working-house; a third apparently was added during the same period as the second marine tower.

Instore grain was discharged at the head pulley into 2,000-bushel upper garners and then into 2,000-bushel hopper scales for weighing. The Fairbanks scales were of the trussed lever variety. As in the case of the contemporary Superior and Concrete-Central headhouses, grain exiting the scales was presumably channeled via turnhead to a series of distributing hoppers each scale had a set of four such boxes situated below for subsequent spouting to bins or belts. Since the upper belt galleries of the and sections were connected by bridges at the bin floor level, we may presume that grain unloaded from vessels could be conveyed to the annex for storage while receipts via the car dumper could similarly reach the bins of the original elevator.

Whether the bin floor belts ran continuously through both sections is undetermined, through there was no observable change in level that would have CONNECTING TERMINAL ELEVATOR HAER No. (Page 14) required the use of jack legs comparable to the situation at Lake & Rail or American. The capacity of the house lofters may also have been improved during the Grain Conditioning and Dust Control As of Connecting Terminal was equipped with a pair of cone-type Monitor aspirating separators for cleaning grain; each machine had an nominal hourly capacity of bushels. A bu./hr. Randolph gas-fired drier was subsequently installed in a structure adjoining the north end of the elevator.

Improvements or repairs to the drier may have been undertaken in The original dust collecting system was furnished by the H. A. Day Company of Minneapolis; floor sweepers delivered dust and dirt from all portions of the structure to a collector for spouting to the ground floor and subsequent bagging. The nature of any improvements or extensions to the dust control system remain undetermined. Shipping by Water and Rail Original plans contemplated deliveries of grain from Connecting Terminal to canal barges, boats working the Montreal route, local wagons and rail cars. To aid in extracting shipments from storage, two conveyors ran beneath the bins at a maximum rate of bu./hr. These belts carried grain to the boots of the house legs for re-elevation and outstore weighing.

Approximately half the storage bins could also spout grain directly to the lofters without using the lower belts. After passing through the garner-scale sets in the headhouse, shipments were presumably directed to the proper route for loading out by the distributing boxes previously mentioned. There were also two shipping belts in the annex. However, due to a structural change in the design of the storage facility, these belts ran through tunnels rather than a raised basement; the exact nature of the linkage between the outstore horizontal materials-handling equipment in the two sections remains undetermined.

Grain was delivered to vessels from a horizontally- subdivided bin via a single dock spout at the north end of the elevator; the nominal marine loading rate was bu./hr., but the average in actual practice was nearer bu./hr. Rail cars were loaded at a maximum rate of twenty per hour through two spouts descending to the tracks in the car shed. The addition of a third house lofting leg made it possible to temporarily claim a (theoretical) 50 percent increase in rail CONNECTING TERMINAL ELEVATOR HAER No. (Page IS) shipping rates from 200 cars every ten hours to Throughout the and early rail loading was conducted at rates of bu./hr., but, by carloading had fallen back to the original level of twenty per hour; rates declined to twelve per hour immediately after World War II.

After construction of the annex, cars continued to be loaded in the original track shed with the addition of a spout from the bin floor of the structure for outstore shipments through the auxiliary (south) workhouse. Upgrades during the last decade of Connecting Terminal's operation, from the mid-1950s to the mid- apparently restored the twenty cars per hour rate. CONNECTING TERMINAL ELEVATOR HAER No. (Page 16) ENDNOTES 1. The following paragraphs are based on information from several sources including city building permits and plans filed in Buffalo City Hall; Northwestern Miller 103 (21 July The American Elevator and Grain Trade 34 (15 August 92. 2. Northwestern Miller 103 (21 July Buffalo Commercial (10 March 18; Buffalo Courier 10 March p. 1. 3.

Buffalo Express (10 March 1, 7; 11 March 7; Moody's Industrials. 4. Erie County Clerk (ECC), Corporations, Connecting Terminal Railroad, Box Consent to Mortgage, May 17, ECC, Mortgages, Liber May 1, Moody's Transportation. Early records indicate that was a relatively autonomous railroad company locally controlled in Buffalo. All Erie County Clerk documents are listed by date of document origin, not by date of filing, unless otherwise noted. 5. Who Was Who, Vol. 1, parts 1, 2- Vol. 5; Buffalo City Directory. Who Was Who in New York. 6. ECC, Corporations, Connecting Terminal Railroad, Box Consent to Mortgage, May 17, ECC, Mortgages, Liber July 1, 7. Who Was Who. Vol. 1, parts Vol. 5; Who Was Who in New York.

ECC, Corporations, Box Certificate of Surrender of Capital Stock, May 26, The reference for board director Seligman notes his tie to "now a part of the Pennsylvania Railroad System." 8. ECC, Deeds, Liber December 24, 1. 9. Buffalo Express. 21 October p. 4. 10. Moody's Industrials. Herman Steen, Flour MUUpg in America (Minneapolis, MN: T. S. Denison & Company, Inc., 11. Buffalo Courier-Express. 19 October p. 13 and 25 May p. 2; Buffalo & Erie County Public Library (BECPL), Scrapbook, "Buffalo Industry," Vol. 13, 12. BECPL, Scrapbook, "Buffalo Industry," Vol. 9, ECC, Deeds, Liber April 16, CONNECTING TERMINAL ELEVATOR HAER No. (Page 17) 13. BECPL, Scrapbook, "Buffalo Industry," Vol. 10, 11; Buffalo Evening News. 4 March p. 41; 8 May p. 49. 14.

ECC, Corporations, Western New York & Pennsylvania Railway, Box Merger, October 15, 15. ECC, Deeds, Liber February 26, 16. Buffalo News, 24 July p. 17. For accounts of the fire see Buffalo Commercial. 10 March p. 18; Buffalo Courier. 10 March p. 1; Buffalo Express. 10 March p. 1; Buffalo Times. 10 March p. 1; Buffalo Evening News. 10 March p. 15; Buffalo Express. 11 March p. 7. 18. H. Perry Smith, ed., History of the City of Buffalo and Erie County, vol. II (Syracuse: D. Mason & Co., 19. Insofar as can be determined, the structure known as Connecting Terminal Warehouse "B" was a single-story frame building, located south of the grain elevator and used for housing package freight. 20. Permit (10 March 21. See Buffalo Structural Steel Co.

plans for erection of Husted (Superior) marine tower which includes a reference to Terminal tower, Sheet #1 (11 March Buffalo City Hall. 22. Buffalo & Erie County Public Library, Local History Scrapbooks, "Industry," Vol. 4: 23. For illustrations of the dumper and south workhouse in relation to the annex see BECPL Scrapbooks, "Industry," Vol. 9: 61 (Buffalo Courier-Express. 20 September and Vol. 10: 11 (Buffalo Courier-Express. 10 November CONNECTING TERMINAL ELEVATOR HAER NO. (Page 18)

Sources

Unless otherwise indicated by footnotes, descriptions of machinery and process flows have been derived from the following sources. American Elevator & Grain Trade. 34 (15 August 92. Buffalo City Directories, Buffalo Commercial (10 March 18. Buffalo Courier. 10 March p. 1. Buffalo Courier-Exoress. 19 October p. 13; 25 May 2. Buffalo & Erie County Public Library, scrapbooks, Vol. 4, "Industry," p. vols. 9, 10, 13, "Buffalo Industry." Buffalo Evening News. 4 March p. 41; 10 March p. 15; 8 May p. 49. Buffalo Express. 10 March pp. 1, 7; 11 March 21 October p. 4. Buffalo News. 24 July p. Building Permits & Plans, Buffalo City Hall (23 May (31 August "Buffalo, The Convention City," American Elevator and Grain Trade. 36 (15 September Erie County Clerk, Records, Erie County, NY.

Green's Marine Directory of the Great Lakes [title and publication data vary] ed. ed. ed. ed. ed. ed. ed. ed. Moody's Industrials. CONNECTING TERMINAL ELEVATOR HAER NO. (Page 19) Moody's Transportation. "The New Elevator "A" at Buffalo, New York," Northwestern Miller. 103 (21 July Site Plan (24 July courtesy: Bruce Hinman, Michigan Millers Mutual Insurance Company, PO Box Lansing, MI Smith, Perry H., ed. History of the Citv of Buffalo and Erie County, vol. II. Syracuse: D. Mason & Co., Steen, Herman. Flour Milling in America. Minneapolis, BIN: T. S. Denison & Company, Inc., War Department Corps of Engineers, U.S. Army and United States Shipping Board, Transportation on the Great Lakes (Washington: Government Printing Office, War Department Corps of Engineers, U.S.

Army and United States Shipping Board, Transportation Series #1, Transportation on the Great Lakes (Washington: Government Printing Office, War Department, Corps of Engineers, United States Army, Transportation Series #1, Transportation on the Great Lakes (Washington: Government Printing Office, Who Was Who, vols. 1 & 5. Who Was Who in New York. CONNECTING TERMINAL ELEVATOR HAER No. (Page 20)

Appendix

Mainhouse Cost: Foundation: Wooden piles capped by concrete foundation slab Basement: Full height 15' at grade; four longitudinal rows of square, pyramid-headed pillars, together with outer longitudinal rows of rectangular bracketed pillars support bin slab; pillars are spaced equidistantly, four pillars below each main bin; the outer pillars are placed below the intersection of the main and 1/4 walls; exterior wall straights and formed by panel infill of rusticated concrete blocks between outer row of pillars; an elongated window extends the full width of each panel above 1/2 height Bins: Capacity bushels Main bins, 10 x 3, in parallel rows, cylindrical approx.

20' in diameter, 90' high (above bin slab); NE corner bin horizontally sub-divided for shipping by boat Interspace bins, 9x2 30 outerspace bins, convex 1/4 circle outer walls Non-tangential link wall contacts between all main bins Bin Slab: Concrete slab, on I-beams Gallery & Steel-frame with ferro-enclave plaster walls Marine Tower Movable, structural steel clad in corrugated iron REFERENCES: The original Buffalo City Hall plans have been lost. City Building Permits provide dates, and The City Plans Book for costs of construction. The building is featured in Northwestern Miller. 103 (21 July 155 and American Elevator & Grain Trade,34 (15 August 92. CONNECTING TERMINAL ELEVATOR HAER No.

(Page 21) Annex Cost: Foundation: Wooden piles to 2' foundation slab and 14" tunnel slab Basement: Conveyor tunnel only, 7' high, 9' wide, below grade Hoppers: Concrete slab on gravel, directly above foundation slab.

Bins: Capacity bushels Main bins in parallel rows, cylindrical 30' in diameter, high (from foundation slab) Interspace bins 4x1 No outerspace bins Tangential contacts between all bins, 8' wide Wall thickness 6", 8" at contacts Vertical reinforcing, intermediate grade new billet of diameter; 16 jacking rods arranged equidistantly, supplemented by 2 ordinary verticals between jacking rods in external and contact walls and 1 between the jacking rods of internal walls; the verticals are located in the middle of the bin wall Horizontal reinforcement, graduated round rods at regular coursing interval; the horizontals are tied to the inside of the verticals Bin floor: Monolithic concrete Gallery & Structural Steel, clad in corrugated iron Headhouse: REFERENCES: Army Engineers microfilm of original drawings and contract are housed in Buffalo City Hall.

City Building Permits provide dates and City Plans Book for costs.

In context

Buffalo, New York The place record: every map, photograph and survey of this town.
Erie County, New York 204 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Buffalo

24 of 55 records shown

The federal surveyors worked through Buffalo building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Buffalo Grain ElevatorsHAER NY,15-BUF,27-36,310 words
Superior ElevatorHAER NY,15-BUF,46-17,782 words
Concrete-Central ElevatorHAER NY,15-BUF,28-14,392 words
Standard ElevatorHAER NY,15-BUF,44-11,780 words
Great Northern ElevatorHAER NY,15-BUF,32-11,717 words
Cooperative Grange League Federation ElevatorHAER NY,15-BUF,30-11,692 words
Spencer Kellogg ElevatorHAER NY,15-BUF,35-11,088 words
Lake & Rail ElevatorHAER NY,15-BUF,37-10,206 words
Marine "A" ElevatorHAER NY,15-BUF,39-9,905 words
American ElevatorHAER NY,15-BUF,26-8,401 words
Saskatchewan Cooperative ElevatorHAER NY,15-BUF,43-8,121 words
Washburn Crosby ElevatorHAER NY,15-BUF,48-7,837 words
Electric Grain ElevatorHAER NY,15-BUF,31-7,740 words
Oldman Boiler WorksHAER NY,15-BUF,41-7,374 words
Oldman Boiler WorksHAER NY,15-BUF,41A-5,737 words
Perot Malting ElevatorHAER NY,15-BUF,42-4,401 words
Darwin D. Martin HouseHABS NY,15-BUF,5-4,334 words
Ansley Wilcox HouseHABS NY,15-BUF,12-4,005 words
Wollenberg Grain & Seed ElevatorHAER NY,15-BUF,49-3,523 words
Buffalo City HallHABS NY,15-BUF,13-3,303 words
H-O Oats ElevatorHAER NY,15-BUF,34-3,042 words
Urban Mill & ElevatorHAER NY,15-BUF,47-2,678 words
U. S. Custom HouseHABS NY,15-BUF,10-2,504 words
St. Paul's Episcopal CathedralHABS NY,15-BUF,8-2,485 words

Provenance

  • Written history. Quoted verbatim from HAER NY,15-BUF,29-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.