Lock C1, located on the Champlain Canal, is significant as a component of the nationally significant New York State Barge Canal. The lock retains the original DC electro- mechanical gate and valve operating machinery. The associated dam s 50'-wide Tainter gates were reportedly some of the largest in the country at the time of construction. Description: Located on the Champlain Canal, Lock C1 consists of a lock and related structures and operating machinery, and a dam that extends across the Hudson River.1 The lock site is accessed by an asphalt drive with parking available at an asphalt lot with modern post-and- rail fencing. Visitors using the canal park, which features picnic tables and a boat launch, can also park at a gravel lot.
The modern boat launch is concrete with steel side walls. Concrete approach walls are located at both ends of the lock. The northeast one is in good condition. While the southeast approach wall exhibits some spalling in sections, it is in generally good condition. The southwest approach wall exhibits extensive spalling and is in poor condition. The lock has a lift to the north with normal pool elevations below and above. The concrete chamber walls have cast-iron pins and vertical cut-outs for pipe mooring aides that allow boats to tie up while locking through. There are double-leaf, steel miter lock gates at each end of the chamber, operated by spars and gear trains powered by the original DC electro- mechanical gate machinery.
This machinery, along with the valve operating machinery used to control the flow of water through the culverts in the chamber walls, is housed in steel cabinets on the chamber walls. There are also modern electrical boxes. The lock has diamond-plate covers, open-grate stairs and catwalks, and concrete stairs. A utility bridge is located at the downstream end. Modern light fixtures are located around the lock chamber. The lock is generally in good condition, although there has been damage to a timber beam in the upstream gate. 1 Description based on site visit made by the HAER recording team in summer and historical maps from Series New York State Archives, Albany, New York. See Eastern Division, Champlain Canal, Section 1, Sta. + 00 to Sta.
+ 00, approved April 2, 8, and Eastern Division, Champlain Canal, Section 1, Sta. + 00 to Sta. + 00 East, approved April 2, 8A. NEW YORK STATE BARGE CANAL, LOCK C1 HAER No. (Page 2) The lock gates and valves are operated from two control stands. These frame shelters with shiplap siding and asphalt-shingle pyramidal roofs feature single-pane, wood pop-out windows and wood doors. Other structures include the lockhouse, located on the west side of the chamber at the downstream end. The one-story frame structure is clad in clapboard and sits on a concrete foundation. The asphalt-shingled gable-front roof overhangs the front fa ade of the building and is supported by square posts. The building is lit by one-over-one wood windows and is entered via modern pane-and-panel doors.
The structure is in good condition. Further north, on the west side of the chamber, is the storehouse, a one-story windowless concrete building that dates to the initial construction of the lock. Historic standing-seam metal covers the hipped roof, which has exposed rafter tails and gabled ventilation dormers currently closed with wood siding. Steel pocket doors provide entry to the building. Although the interior has been retrofitted for work space, the storehouse is in generally good condition, while the roof appears to be in fair condition. Slightly to the north of the storehouse is a modern storage shed, consisting of a frame structure on a concrete foundation with a metal shed roof. Originally, a powerhouse was located at the southeast corner of the chamber on an island.
Only the severely deteriorated concrete foundation remains of this structure. Extending from the lock east and south across the Hudson River is a fixed dam with ogee spillways and concrete aprons in the riverbed below. The east end of the dam consists of concrete abutments and piers with six 50' Tainter gates. Counterweights are located over each gate. This movable dam is situated at an angle to the east bank of the river and can be accessed via an asphalt road leading from River Road in the Town of Schaghticoke in Rensselaer County. Direct access to the dam is prevented by two sets of modern chain-link fencing. An open grate catwalk with pipe railings provides access to the structure. A concrete shed with a flat roof and a steel door is located at the northeast end of the dam.
The dam appears to be in good condition. History: The original contract (Contract No. 71) for the construction of Lock C1 was let to Shanley-Morrissey, Inc. on January 11, Excavation work began at the site in April under the direction of State Assistant Engineer Mr. McClelland. The contract included construction of the lock, adjacent dam, storehouse and office building, as well as dredging the canal prism between locks C1 and C2. In the contract was sublet to the Merion Construction Company, and work continued until December when a flood submerged the construction area. The contract with Shanley-Morrissey, Inc. was subsequently suspended and later cancelled in by order of the Canal Board. That same year, State Assistant Engineer Hayes began managing the contract.
2 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Argus Company, 73; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Noble Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, p. NEW YORK STATE BARGE CANAL, LOCK C1 HAER No. (Page 3) On January 16, the Canal Board re-let the contract (Contract No. 71-A) to P. McGovern & Company, and construction resumed.
Modifications were made to the original contract, including adding a section of Tainter gates to the fixed crest dam. This alteration to the design resulted from a March flood and allowed regulation of the Hudson River. 3 Historian Noble Whitford noted that Tainter gates were used in a variety of ways on the New York State Barge Canal, and this was an unusually large dam of this type. 4 The auxiliary structures were completed between and Contract 92 covered the construction of the power plants and installation of electrical equipment at multiple locks along the Erie and Champlain Canals, including Lock C1. The contract was let to MacArthur Bros. Co. & Lord Electric Co. on February 17, State Assistant Engineer Kenyon managed the contract.
In the storehouse was built.5 By the beginning of the winter of the construction of the lock and lower guide walls had been completed. The access road to the lock was graded and paved the following year, and the power plant and installation of machinery and electrical equipment had also been completed. By the fall of Lock C1, the dam, and related structures were complete. The total final cost of construction was determined to be At the end of the navigation season, the steel connection between one of the Tainter gates and the counterweights failed. The connection had to be repaired, and the Tainter gates were overhauled.7 In repairs were made to the east wall of the lock and the Tainter gate counterweights as part of Contract Lock C-1 was rehabilitated in under Contract