Wood Creek Fixed Crest Dam and Siphon Spillway, part of the Champlain Canal, is a component of the nationally significant New York State Barge Canal. It is an example of the structures built along the canal to regulate water levels. Description: The fixed crest concrete dam is located on Wood Creek, paralleling the Champlain Canal. The structure is in fair condition. The siphon spillway is on the east bank of the Champlain Canal and empties the canal into the creek.1 It consists of a concrete apron flanked with sloped walls with openings in each and is spanned by a steel catwalk. The structure is in good condition.
History: The spillway and dam at Wood Creek were built as part of Contract 25, which encompassed excavating the canal and building Champlain Canal locks 9 and 10 (lock 10 was never actually built), spillways, power plants and other structures, bridge substructures and approaches, highways, and retaining walls. The total length covered by the contract was 13 miles. Atlantic, Gulf and Pacific Company won the contract on November 19, and began work on April 22, By the spillway and dam had been completed.2 In his history of the Barge Canal, Noble Whitford notes that the siphon spillway was a new structure type incorporating the siphon principle.
As Whitford described it, siphons are inclosed in a concrete wall, which, except for openings in its faces, differs little in outward appearance from any wall that might be built to separate two streams having different surface levels. The siphon is simply a cavity in the wall. Its inlet is placed well below the surface of the stream to be regulated; its outlet is as low as the stream that carries away the flow will permit; its crown rises to the elevation at which it is desired that the discharge of water shall begin .The bottom of the crown is at the low- 1 Description of current conditions is based on a site visit made by the HAER recording team in summer and historical maps from Series New York State Archives, Albany, New York. Eastern Division, Champlain Canal, Section 2, Sta.
864 + 00 to Sta. 831 + 50, approved April 2, 83. 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 95; Noble E. Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, WOOD CREEK FIXED CREST DAM AND SPILLWAY HAER No. (Page 2) water level and at this elevation vents pierce the wall from outer face to siphon.
When the water has been drawn down to this level, air enters through these vents and stops the flow through the siphon.3 Siphon spillways were one of the structures that helped regulate water levels in the canal.