Lock E16, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. Description: Lock E16 is at the lower end of a 4.3-mile artificial channel that runs to the south of the Mohawk River.1 The curved asphalt access road leads into two parking areas. The public parking is asphalt, while the operator s parking area is a mixture of asphalt and dirt. The site consists of the lock and associated structures, powerhouse, lockhouse, tool shed, and spillway. The lock has a lift to the west with normal pool elevations of below and above. The concrete chamber walls have been lined with steel plate, and there is cast-iron quarter-round coping.
There are double-leaf, steel miter lock gates at each end of the chamber, operated by spars and gear trains powered by electric motors. The flow of water through the culverts in the chamber walls is controlled by valves also operated by the electric motors. Control stand shelters are located at each corner of the chamber. They are single-story frame buildings with wood siding and hipped asphalt roofs. There are one-over-one-light wood windows and pane- and-panel doors. Concrete-filled cast-iron bollards line either side of the lock chamber. There is a post-and-rail fence on the grass beyond the walls and a mix of modern steel railing and pipe railing at the lock ends. Modern light fixtures illuminate the chamber. A truss utility bridge spans the downstream end.
The lock and control stand shelters are overall in good condition. The powerhouse is a single-story concrete building with a hip asphalt-covered roof that is located at the downstream end of the lock. The entrance to the building faces the lock. The entry bay consists of a metal door with plywood infill. The transoms are closed. The steel multi-light windows are fixed with a pivot sash. The original hydroelectric generators were replaced with a single gasoline-powered unit. The powerhouse is in good condition. The lockhouse is a single-story concrete block structure on a concrete foundation and is centered on the south side of the chamber. It has a gable-front roof and is covered with asphalt shingles. The gable ends have been infilled with wood.
The fenestration consists of one-over- 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E16 HAER No. Page 2 one-light vinyl windows surrounded by vertical board paneling. The metal doors are pane-and- panel with a metal mesh on the interior. The lockhouse is in good condition.2 The tool shed is a single-story frame structure clad in vinyl siding that sits on a concrete foundation behind the lockhouse at the downstream end of the lock. The gable-front roof is covered with asphalt shingles. The entrance is a pane-and-panel wood sliding door with steel mesh on the interior. The fenestration consists of one-over-one-light wood windows with interior metal mesh storm windows.
There is a frame addition at the rear of the structure that has an asphalt shed roof. The addition sits on a concrete foundation and is clad in vinyl siding. The shed is in good condition. Adjacent to this is a riveted-steel machinery cabinet that sits on a concrete pad. The guide walls are in various conditions. The northeast guide wall and dock are concrete and exhibit signs of severe spalling and breakage. The section nearest the lock gate is concrete covered with steel sheeting and cast-iron quarter-round coping. Concrete-filled cast-iron bollards and modern light fixtures are located along the wall. It is in fair condition. The northwest guide wall exhibits minor spalling. The section nearest the lock gate has been clad with steel sheeting and cast-iron quarter-round coping.
The buffer dam insert has also been clad in metal sheeting. Concrete-filled cast-iron bollards and modern light fixtures line the wall, which is in good condition. The southeast guide wall has been covered with steel sheeting. Concrete-filled cast-iron bollards are situated on the wall. It is in good condition. Finally, the southwest guide wall exhibits severe spalling and breakage in the section closest to the lock gate. Steel sheeting covers the lower portion of the wall, and there is coping along part of the wall s edge. The valve area is open with a concrete arch on the upper portion and metal lining the lower. There are concrete-filled cast-iron bollards, a metal ladder, and modern lighting fixtures. The southwest guide wall is in fair condition.
The spillway is located at the northwest guide wall. The rubble reinforced spillway is two-tiered with a sloped connecting concrete wall. The spillway is in good condition. History: Contract 18 covered the construction of Lock E16 at Mindenville, a guard gate at Indian Castle, and a temporary canal. It was awarded to O Brien & Hoolihan Contracting Company of Syracuse, New York, on December 28, O Brien & Hoolihan started work on January 31, by clearing the lock site. In February, they began excavating a temporary canal and had completed the work by the end of April. Excavation at the site of Lock E16 began on May 14, by steam shovel and was finished by September 18, Construction of the lock began at the western end of the south upper guide wall on July 27.
By the masonry work had been nearly completed, including that for the guide walls and powerhouse. The embankments and stone protection around the lock were also nearly finished. The materials for the lock gates and needle beams had been delivered to the site but not yet erected. Central Dredging Company of Cleveland completed the necessary dredging.3 2 State of New York, Department of Public Works Annual Report, (Albany: 77, notes that a new lockhouse was under construction at this lock. 3 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of NEW YORK STATE BARGE CANAL, LOCK E16 HAER No.
Page 3 Contract 18A, awarded to New York State Dredging Corporation on February 17, was for the unfinished work on the original contract, as well as the incomplete portions of Contract 20A. This contract spanned miles from Mindenville to Little Falls. There were problems with Contract 18A. As reported in the Annual Report, Regarding the Castle creek floods and the conditions which existed last winter, with a very wet summer following, it seems to me that the only safe and permanent remedy will be to build a spillway in the north bank of the Barge canal prism opposite the present Erie canal aqueduct; this spillway to be closed during navigation; the crest to be 130 ft. long. If 2' of water topped Rocky Rift Dam s fixed crest, the excess water would flow over the spillway.
Steel frames with flashboards would be used to retain the water.4 The power plant was part of Contract 92, overseen by Assistant State Engineer Kline. The contractor, MacArthur Brothers Co. & Lord Electric Co., had to install five gasoline-electric stations at locks E11, E12, E13, E14, and E15, and one hydro-electric station at Lock E16. Work started on September 12, The hydraulic and electric equipment were installed the following year.5 Various repairs and alterations have been made to the lock after its initial completion. In extensive repairs were made to the steelwork of the upper gates. A new flood spillway was built at the upper north guide wall in Work on the sills and gates took place in under Contract US98.
This may have been related to a Department of Public Works initiative to lower approximately thirty-two lock sills to provide a minimum 13' depth, which consequently required altering the lock gates to fit. Plating of the lock walls took place under Contract in