Lock E17, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. It is also significant as having the highest lift of any lock on the canal system at Description: Lock E17 is located 8 miles west of Lock E16 at the lower end of a mile-long land cut built to bypass the Little Falls of the Mohawk River.1 It is accessed by a long curved asphalt road that ends in a parking area. A steel guard rail runs along the access road on the canal side. There are two parking areas; the lower one is a mixture of gravel and asphalt while the one next to the lock is asphalt. A pavilion, remnants of the Enlarged Erie Canal Lock 36, and a trail are also near the site.
The lock site consists of the lock and associated structures, powerhouse, shop, and guide walls, as well as a remnant of a side pond originally used in filling the lock, which is a unique feature on the canal. As reported by D.A. Watt, Supervising Engineer in the State Engineer s Department, in an article in Engineering Record, a 40' change in elevation occurred at Little Falls because of a dike of volcanic rock.
While the original Erie Canal used four locks at this site, engineers decided to use a single lock, placing it at the lower end where the canal leaves the river, raising the pool between this point and the upper end to the level of the river above the falls, and creating a miniature lake at the lower end of the location, thus affording a good width in the most crooked portion, and providing a depth there of from 20 to 30 ft. 2 Lock E17 has a lift with normal pool elevations of below and above. Mild-steel plates cover the concrete chamber walls, and there is cast-iron quarter-round coping. Lock E17 differs from other locks along the canal because it is a shaft lock. The downstream end of the chamber has a lift gate while the upstream end has the typical double-leaf miter gates.
The riveted-steel gate sits on a concrete foundation, while the counterbalanced guillotine gate hangs from overhead chains. According to Supervising Engineer Watt, the original lift gate was based on those used at the Klein Machnow locks on the Teltow Canal near Berlin, Germany, and was chosen as a cost-savings measure and because it would better withstand the pressure exerted by 40' of water. In addition, engineers thought that if the gate was struck there would be less 1 Description of current conditions is based on a site visit made by the HAER recording team in summer 2 D.A. Watt, Construction of the New York State Barge Canal through Little Falls, Engineering Record 61, no. 19 (May 7, quote from This article provides a thorough description of the site and the lock.
NEW YORK STATE BARGE CANAL, LOCK E17 HAER No. Page 2 damage than if miter gates were used.3 Two corrugated-metal equipment shelters sit on the truss spanning the lift gate. The original lock operating machinery used to control the gates and the original valve operating machinery for the valves in the culverts used to water the lock were replaced by AC equipment. Control stand shelters are located on the north side of the chamber. The shelters are single-story frame structures with clapboard siding. One shelter has a gable- front asphalt roof, while the other has a side-gable asphalt roof. Both have modern wooden casement windows and a pane-and-panel door. Concrete-filled cast-iron bollards and pipes line the chamber walls. There are modern light fixtures.
A truss utility bridge spans the upstream end of the lock. A concrete pedestrian bridge replaced the original arch-beam bridge at the lift gate. The lock and control stand shelters are in good condition. The powerhouse, located at the northeast corner of the downstream end of the lock chamber, was converted into the lockhouse in The original lockhouse has been removed. The former powerhouse is a single-story concrete building on a concrete foundation and has a hipped roof clad in asphalt shingles. The exposed concrete foundation has arched bays filled in with concrete blocks and bricks. A metal platform on the southeast side provides another point of access to the building. The fenestration is comprised of one-over-one vinyl windows with steel mesh storm windows.
The window bays in the eaves are closed. The doors are modern pane-and-panel. The interior has been modified with the construction of a second-story loft, probably for storage. The building is in good condition. The shop sits near the lockhouse. This single-story concrete building sits on a concrete foundation. The gable-front roof is covered with asphalt shingles. The gable ends are wood. The entrance is a beadboard sliding pocket door. There are no windows. The shop is in good condition. The northeast guide wall is concrete and exhibits severe spalling and breakage; it is in fair condition. The wall has cast-iron quarter-round coping, and concrete-filled cast-iron bollards and modern light fixtures line it. The northwest guide wall, on the other hand, is in good condition.
It is also concrete, but there is minimal spalling. The section nearest the lock gate has been clad in steel plates and is surrounded by pipe railing. The buffer dam inset has been filled in with concrete blocks. The southeast and southwest guide walls are also in good condition. The southeast one is concrete with mild-steel plating and cast-iron quarter-round coping. There are concrete-filled cast-iron bollards along the wall, and a metal ladder leads from the wall the bridge above. The buffer dam inset is open, but there is a steel cross-hatch cover. The southwest guide wall is also concrete with mild-steel plating. The buffer dam inset is open with a steel cross-hatch cover like that on the southeast wall.
The southwest wall is lined with concrete-filled cast-iron bollards and modern lighting fixtures, and there are modern ladders as well. This wall shows evidence of minor spalling and some repairs. 3 Watt, Watt states that as originally designed, the 36' x gate had twelve horizontal girders measuring 5'- 6" deep and a single skin of flat plates. The electrical operating machinery was located on overhead towers, and there were concrete counterweights. (See pages 4 The Annual Report states that the powerhouse was turned into a shop and office. State of New York, Department of Public Works, Annual Report, (Albany: 78. NEW YORK STATE BARGE CANAL, LOCK E17 HAER No.
Page 3 There are also retaining walls to the northwest and northeast of the chamber that consist of the original masonry used for the Erie Canal. The northwest wall is in good condition, but the northeast one has severe spalling and breakage and is thus in fair to poor condition. The original side pond is located south of the lock chamber, although it was filled in at some point in the late It had been constructed in anticipation that the high lift at this site would require more water than other locks. Cross culverts equipped with valves were located along the south wall and connected the pond with the lock chamber.
Supervising Engineer Watt described the use of the side pond in lock operations: When the chamber is to be emptied, the upper half of its volume will be allowed to run into the side pond, and the remaining half will be emptied into the river. When it becomes necessary to fill the chamber again, the water stored in the side- pond will be emptied into the chamber, filling the lower half of it, and the remaining volume will then be taken from the upper pool. 5 History: The construction of Lock E17 was part of Contract 31, let in September to Casey & Murray of Rochester, New York, with State Assistant Engineer Harris in charge.
This contract covered the construction of the lock, guard gate, bridge, 1 mile of land line through Little Falls, and the addition of the movable crest on the original Rocky Rift Dam. Murray was solely responsible for the work, however, because his partner died in September after sustaining injuries during excavation of the lock. Murray began by removing existing buildings and assembling the plant. Due to the geological nature of the site, rock excavation was a significant part of the contract. During the winter of for example, the cliff at the south side of the lock was excavated, while the north side had been nearly completed. This work was subcontracted to McCaghey of Little Falls. From the south wall of the lock was built, followed by excavation for the north wall and the lock chamber.
By Lock E17 was nearly complete. A small amount of excavation at the ends of the lock and construction of a concrete stairway were all that remained. Completion was delayed by prism excavation within the limits of the Enlarged Erie Canal.6 MacArthur Brothers Co. & Lord Electric Co., who won Contract 92 in built the power plant. This contract encompassed a number of sites. In Section 4, this included three hydro- electric power stations at locks E17, E18, and E19, along with a transmission line from Lock E17 to the German Street Bridge in Little Falls. By the work had been completed under the supervision of State Assistant Engineer Kline.
The powerhouse generated DC until it now produces AC.7 5 Signage at site; Watt, 6 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Watt, 7 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.
1 (Albany: Lyon Company, signage at site gives voltage at powerhouse. NEW YORK STATE BARGE CANAL, LOCK E17 HAER No. Page 4 Later alterations have been made at the site. The first record of repairs occurs in A cast- steel rail for the lower left valve and oak sills at the upper gates had to be installed. The machinery operating the lower lift gate also had to be overhauled. The arch beam was raised at the lock to provide a 20' clearance in In the chamber walls were faced with plating as part of Contract Two years later, new upper lock gates were installed, the gate recess was re-lined, and the lower guide wall was built (this was part of Contract The gates and machinery were altered in as part of Contract US91.
This was probably part of a initiative by the Department of Public Works to lower approximately thirty-two lock sills so as to provide a minimum 13' depth and to alter the lock gates to fit. The lift gate and chains were replaced ca. The following year saw the replacement of the valve and miter gate machinery with Westinghouse triple reducted gearmotors and the lift gate machinery with Falk triple reducted gear motors.8