Lock E20, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. Description: Lock E20 is located 10 miles west of Lock E19 on the Erie Canal.1 The site is accessed by a circular asphalt driveway (although the northwest end is blocked) that extends from Route 49. An asphalt parking area is located off the circular driveway. Another asphalt access road extends on the southwest side of the site. The lock site consists of the lock and associated structures, powerhouse, lockhouse, and storage building. Lock 20 State Canal Park is located on the north side of the chamber and contains modern frame buildings, including a pavilion, comfort station, and observation deck. Lock E20 has a 16' lift to the west with normal pool elevations of below and above.
The concrete chamber walls have areas of severe spalling. There are double-leaf, steel miter lock gates at each end of the chamber operated by spars and gear trains powered by DC electro- mechanical gate machinery. The flow of water through the culverts in the chamber walls is controlled by valves also operated by DC electro-mechanical machinery. Control stand shelters are located at the northwest and southwest corners of the chamber. The shelters are frame buildings with asphalt shingle-covered hipped roofs. One is clad in vinyl siding, while the other was being re-clad at the time of the site visit in July The shelters have one-over-one-light vinyl windows. A truss utility bridge is located at the downstream end of the lock.
Concrete- filled cast-iron bollards sit on concrete pads set back from the chamber walls. The chamber is illuminated by modern light fixtures. The lock and shelters are generally in good condition. The powerhouse is located by the downstream lock gates. The concrete building has a hipped roof covered with asphalt shingles. The fenestration consists of steel multi-light windows with fixed and pivot sashes and three-light steel windows on the upper floor. Entrance to the building is via wood double doors with a four-light transom. The hand-operated bridge crane is intact inside, but all the other equipment has been removed. The building is in fair condition. The lockhouse, centered on the west side of the chamber, is a one-story frame building clad in clapboard siding.
Asphalt shingles cover the hipped roof, and there is a brick chimney. Six- over-six-light and four-over-four-light wood windows comprise the building s fenestration. A 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E20 HAER No. Page 2 pane-and-panel door with a modern shallow gable porch provides access. The lockhouse is in good condition. To the southwest is a riveted-steel storage cabinet used to hold flammable items. It sits on a concrete pad and appears to be in good condition. Northwest of the lock is the storage building, a one-story concrete block building with rusticated concrete block detailing. Asphalt shingles cover the hipped roof.
The building is equipped with a metal door and a metal garage door. It is in good condition. The concrete approach walls are in poor condition. The northeast one is severely spalling, as is the northwest one. A buffer beams sits on the side of this wall. The southeast wall is severely spalling, and the buffer beam is located in the wall. The concrete of the southwest approach wall is also spalling. History: Lock E20 was built under Contract 42, let in July to Shanley & Morrissey, Inc., with Charles R. Chase, Assistant Engineer with the State, overseeing the contract. The work consisted of excavating the channel and building the lock and five bridges, along with auxiliary structures.
Work stopped in March and the Canal Board suspended the contract on July 18, The remaining work was let as Contract 42A to Grant Smith & Company & Locher of Rome, New York, on February 24, and Chase continued supervision. Horton Construction Company held the subcontract for the foundation piles and sheet piling for the lock and approaches. By September 30, the concrete had been poured for the entire south lower approach wall, about a third of the lock footings, and one lock section. On June 21, the contract was completed.2 The power plant was built as part of Contract 93, along with those at locks E21, E22, E23, and E25. It was awarded to MacArthur Brothers Co. & Lord Electric Co., on August 12, Later alterations and additions were made to the site after its initial completion.
In the lock was unwatered and overhauled. New gates were installed and the sills were lowered in the early as part of Contract US108. This was probably a result of a initiative by the Department of Public Works to lower approximately thirty-two lock sills so as to provide a minimum 13' depth, which required altering the lock gates to fit.4