Ninemile Creek Spillway and Tainter Gate, located on the Erie Canal, are components of the nationally significant New York State Barge Canal. Description: The Ninemile Creek Spillway and Tainter Gate are located on the south bank of the channel.1 The 695'-long spillway consists of a bi-level concrete apron, concrete abutments, and a concrete wall. The structure is in fair condition with evidence of spalling and breakage of concrete in areas. The steel and concrete Tainter gate at the west end could not be accessed. History: The spillway was built as part of Contract 43, awarded on October 15, to M.A. Talbott Company. Henry J. O Neill, Assistant Engineer with the State, oversaw the work, which encompassed miles of the canal. By the spillway had been built.
An alteration of the original contract (No. 10, approved December 11, provided for the erection of a needle-dam at the spillway and an additional rack for operation of the gate to facilitate repairs and operation. A tumble gate had been built at the site and sheet piling put in place for the planned paving of the entrance in Repairs to the structure were made after its initial completion, including the installation of the Tainter gate at some point after Chapter 169 of the Laws of authorized repairs to the apron of the spillway. The contract was awarded to H. Shapiro Construction Company of Albany, New York.
The structure underwent rehabilitation in although the nature of the work was unspecified.3 1 Description of current conditions is based on a site visit made by the HAER recording team in summer 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.
1 (Albany: Lyon Company, 3 State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Lyon Company, Maintenance Contracts, March 1, NEW YORK STATE BARGE CANAL, NINEMILE CREEK SPILLWAY AND TAINTER GATE HAER No. Page 2