Guard Gate 10 (Cartersville), located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. It is vital to controlling the flow of water through this section of the canal. Description: Guard Gate 10 consists of a double-span, riveted-steel superstructure on concrete piers and two 55'-wide gates.1 The gates have steel skin plates on the upstream sides. Steel cabinets are located on the superstructure spanning the gate openings. The gates are suspended by cables and steel and reinforced-concrete counterweights supported by sheaves on latticework steel towers. A modern steel mechanical cabinet sits on top of each of the gates. Guard Gate 10 is in good condition.
An approximately 142'-long spillway that allows excess water to flow from the canal into the Irondequoit Creek is on the north bank of the canal. There are four fixed-crest concrete spillway sections with flashboards. Three sluice gates spanning what is labeled on a map as the Cartersville Waste Weir are on the west end.2 A steel I-beam pedestrian bridge on concrete piers carries the Canal Trail over the spillway. The bridge has a concrete deck and is lined with pipe- and-bulb railings. The bridge and spillway are both in good condition. History: Guard Gate 10 was built as part of Contract 63, awarded to Kerbaugh Inc. of Philadelphia, Pennsylvania, on June 13, The contract encompassed miles from Wayne County to Kings Bend.
The Annual Report stated the substructure and superstructure of one gate was complete while the other was 60 percent done. A change to the contract in specified alterations to the operating mechanism of the two guard gates.3 1 Description of current conditions is based on a site visit made by the HAER recording team in summer 2 Series New York State Archives, Albany, New York, Western Division, Erie Canal, Section 9, Sta. to Sta. approved December 29, 81. 3 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.
1 (Albany: Lyon Company, and Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, GUARD GATE 10 (CARTERSVILLE) HAER No. Page 2 The alterations were part of Contract awarded to Cooper Company of Cleveland, Ohio, and under the direction of State Assistant Engineer A.S. Milinowski. The contract included the installation of hand brakes to nine guard gates, including that at Cartersville, and took place during spring I.M. Ludington s Sons, Inc., won Contract 201 in March to place a concrete lining at Cartersville. In the guard gate was cleaned and repainted as part of Contract