New York State Barge Canal, Lock E32, 2785 Clover Street, Pittsford

New York State Barge Canal, Lock E32, 2785 Clover Street, Pittsford, Monroe County, NY. Surveyed as HAER NY-462, with a 1,859-word written history.

From the record

“Lock E32, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal.”

Written record, HAER NY-462 survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY-462 · the record runs 1859 words · one of 73 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1186 words

Source document Quoted word for word from HAER NY-462. Not written, edited or summarised by this site.

Lock E32, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. The lock is also significant for the original DC gate and valve machinery that remain in service. Description: Lock E32 is located 16 miles west of Lock E30 on the Erie Canal.1 An asphalt driveway extends from Clover Street to the lock, and there is a small asphalt parking lot. The site includes the lock and associated structures, lockhouse, storage building, and a spillway on the bypass channel. There is no powerhouse at Lock E32; instead, AC electricity generated at Lock E33 was transmitted to this site and converted to DC electricity by a motor-generator set in the lockhouse basement. Lock E32 has a lift to the west with normal pool elevations of below the lock and above.

The concrete chamber walls are severely spalled and breaking, and some of the sections have cast-iron coping. There are double-leaf, steel miter lock gates at each end of the chamber operated by spars and gear trains powered by DC electro-mechanical gate machinery. The flow of water through the culverts in the chamber walls is controlled by valves also operated by DC electro-mechanical machinery. The original DC gate and valve machinery are still in service. Since there is a highway bridge just below the lock chamber, the culverts discharge under the roadways to riser pipes in the lower pool. The control stand shelters are located on the upstream and downstream corners of the south side of the chamber.

These are single-story frame structures clad in vertical-board panels with gable-front asphalt roofs. There are wood awning windows and pane-and-panel doors. The lock chamber is lined with concrete-filled cast-iron bollards on concrete pads, and pipe railing surrounds the public access side of the lock. Modern light fixtures illuminate the lock. The lock chamber and control stand shelters are all in good condition. A steel truss pedestrian/utility bridge spans the downstream end of the lock. This bridge is in good condition. A set of concrete stairs with pipe railings is located at the downstream end of the lock. They exhibit some spalling and breakage and are in fair condition. The lockhouse is located extremely close to the south side of the lock chamber.

The single-story concrete building is banked into a hill, so there is a walk-out basement. The foundation is concrete. The hipped roof is covered with ribbed clay tiles, and there is a brick chimney and exposed rafter tails. The fenestration consists of two-over-two-light wood windows with steel 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E32 HAER No. Page 2 mesh coverings and wood storm windows. The entrance is a wood pane-and-panel door with a wood screen. The lockhouse is in good condition. Southwest of the lockhouse is a riveted-steel flammable storage cabinet on a concrete pad. It is in good condition. A storage building is located on the opposite side of the chamber and is in good condition.

The single-story concrete building sits on a concrete slab foundation. The shallow gable roof is covered with asphalt sheeting and concrete chimney. There is a modern pane-and-panel door, sliding steel pocket doors, and a modern vinyl garage door, but no windows. An observation deck is located on top of the building and lined with modern steel and wood railings. The guide walls are all in fair to poor condition. The northwest one is concrete and is severely spalling and breaking. Concrete-filled cast-iron bollards are setback from the wall on concrete pads. Modern light fixtures and cast-iron cleats line the wall. The concrete of the northeast guide wall is also heavily spalled with breakage.

The southeast guide wall has severely spalled concrete with some encroaching vegetation, although the section nearest the lock gate has newer concrete. Concrete-filled cast-iron bollards and modern light fixtures line this wall. Finally, the southwest guide wall has had some repairs to the severely spalled concrete, namely a new concrete top. The bypass spillway, located about west of the upper gates on the south bank of the canal has five stop-log sections and a broad sloped concrete apron with bumps cast into the face to break up, slow, and aerate the water flowing down the face. An open-grate catwalk lined with modern steel railing spans the spillway. The spillway is in fair condition due to the spalling and breaking of the concrete.

The water goes to an open bypass channel running parallel to the south side of the lock. The water is diverted through a box culvert under Clover Street and discharges below the lock. There is also a nearby boat launch, consisting of a concrete ramp between two wood docks with modern metal cleats. The boat launch is in good condition. History: Lock E32 was built as part of Contract 23, awarded on August 18, to Millard & Lupton Company of Philadelphia, Pennsylvania. Work started in October with excavation of the site. By September 30, the prism east of Lock E32 had been excavated, as well as the lock site. About cubic yards of concrete had been placed in the upper guide wall and spillway. By the concrete work for the upper guide wall, spillway, and the lock was completed.

During the upper gates were erected and the quoin and miter posts adjusted, but the lower gate sills were still incomplete due to problems with water backing up from the nearby old Erie Canal alignment. The contract was canceled in August of that year.2 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, and Annual Report of the State Engineer and NEW YORK STATE BARGE CANAL, LOCK E32 HAER No.

Page 3 The remaining work was included in Contract 23A, awarded to Kerbaugh Inc. on May 20, On July 3, the work was assigned to Empire Engineering Company, Inc., and work started a few days later. At Lock E32, the work involved completing the lower lock gates.3 The power plant was included in Contract 94, a large contract that included the power plants and electrical equipment and machinery for operating and lighting locks E26, E27, E28A, E29, E30, E32, E33, E34-35, and guard locks. The contract was awarded to MacArthur Brothers Co. & Lord Electric Co. of New York City in February Repairs to the motor, valve, and gear controls were made in The sills, quoins, and miter posts on the upper and lower gates were rehabilitated, and new pivots and sockets were installed.

The lock was unwatered and overhauled in The lock was rehabilitated in Contract covered the installation of new lower gates and miscellaneous work.5

Sources

386 words

Source document Quoted word for word from HAER NY-462. Not written, edited or summarised by this site.

Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1.

Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1.Albany: Lyon Company, Hay, Duncan. New York State Barge Canal. National Register of Historic Places Registration Form, Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 3 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 4 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.

1 (Albany: Lyon Company, 5 State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (New York: Publishers Printing Co., 22; State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (publisher unknown, State of New York, Department of Public Works, Annual Report (Albany: 79; and Maintenance Contracts, March 1, NEW YORK STATE BARGE CANAL, LOCK E32 HAER No. Page 4 Maintenance Contracts, March 1, Series New York State Archives, Albany, New York. Western Division, Erie Canal, Section 9, Sta. to Sta. approved December 29, 86. State of New York, Department of Public Works.

Annual Report of the Superintendent for the Year New York: Publishers Printing Co., Annual Report of the Superintendent for the Year Albany: Annual Report Albany: Historians: Laura S. Black and Jami Babb, summer

Written history

190 words

Source document Quoted word for word from HAER NY-462. Not written, edited or summarised by this site.

The Historic American Engineering Record (HAER) is a long- range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service, United States Department of the Interior. The New York State Barge Canal Survey was undertaken in summer in cooperation with the Erie Canalway National Heritage Corridor (ERIE), Beth Sciumeca, Executive Director. Justine Christianson, HAER Historian, and Duncan Hay, ERIE, served as project leaders. The staff of the New York State Canal Corporation provided access to the sites. Craig Williams of the New York State Museum provided research materials and assistance.

The HAER field team consisted of Jami Babb and Laura Black. NEW YORK STATE BARGE CANAL, LOCK E32 HAER No. Page 5 Appendix: Images of Current Conditions Image 1: Lockhouse. Field photograph taken by HAER recording team, summer NEW YORK STATE BARGE CANAL, LOCK E32 HAER No. Page 6 Image 2: Storage building with observation deck on top. Field photograph taken by HAER recording team, summer Image 3: Spillway. Field photograph taken by HAER recording team, summer

In context

Pittsford, New York The place record: every map, photograph and survey of this town.
Monroe County, New York 198 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Pittsford

5 records

The federal surveyors worked through Pittsford building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
New York State Barge CanalHAER NY-4601,027 words
New York State Barge CanalHAER NY-4591,009 words
New York State Barge CanalHAER NY-457838 words
New York State Barge CanalHAER NY-461612 words
New York State Barge CanalHAER NY-458486 words

Provenance

  • Written history. Quoted verbatim from HAER NY-462. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.