BlockBefore
Decorative drawing: the front elevation of a nineteenth-century American timber-framed building, its clapboards,.... Not a photograph of this place.

Portsmouth Gaseous Diffusion Plant, X-230J2 South Environmental Sample Station, 3930 U.S. Route 23 South, Piketon

Portsmouth Gaseous Diffusion Plant, X-230J2 South Environmental Sample Station, 3930 U.S. Route 23 South, Piketon, Pike County, OH. Surveyed as HAER OH-142-M, with a 891-word written history.

From the record

“The South Environmental Sample Station houses instrumentation for use in the monitoring of the South Holding Pond effluent for environmental compliance, which requires regular monitoring and sampling of water and air at PORTS.”

Written record, HAER OH-142-M survey. Machine-read text.

surveyed by the federal HAER program as HAER OH-142-M · the record runs 891 words · one of 30 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

96 words

Source document Quoted word for word from HAER OH-142-M. Not written, edited or summarised by this site.

Portsmouth Gaseous Diffusion Plant (PORTS), U.S. Route 23 South, Piketon vicinity, Scioto Township, Pike County, Ohio The South Environmental Sample Station is located at Ohio State Plane South coordinates at easting ft, northing ft and at Universal Transverse Mercator Zone 17N easting m, northing m. The coordinate represents the approximate center of the South Environmental Sample Station. This coordinate was obtained on June 20, by plotting its location in EnviroInsite The accuracy of the coordinates is +/- 12 meters. The coordinate datum is North American Datum Date of Construction: Designer/Builder: Goodyear Atomic Corporation Previous Owner: N/A

Present Owner

41 words

Source document Quoted word for word from HAER OH-142-M. Not written, edited or summarised by this site.

The Atomic Energy Commission oversaw construction and operation of PORTS until when the Energy Research and Development Administration was established with responsibility for research and development duties from In the U.S. Department of Energy (DOE) was established, overseeing operations at PORTS.

Significance

103 words

Source document Quoted word for word from HAER OH-142-M. Not written, edited or summarised by this site.

The South Environmental Sample Station houses instrumentation for use in the monitoring of the South Holding Pond effluent for environmental compliance, which requires regular monitoring and sampling of water and air at PORTS. DOE installed the station in to monitor for compliance with air and water quality standards set forth in new environmental regulations, such as the Clean Air Act, the National Emissions Standards Act, and the Water Quality Act. PORTS was a part of the U.S. Cold War nuclear weapons complex. PORTS primary Cold War era mission was the production of highly enriched uranium by the gaseous diffusion process for defense/military purposes.

Written history

583 words

Source document Quoted word for word from HAER OH-142-M. Not written, edited or summarised by this site.

Fluor-BWXT Portsmouth LLC photographed the site in August Gray & Pape, Inc., Cincinnati, Ohio, served as the primary author of the historical narrative and resource descriptions drawing from numerous historical records and reports, drawings, photographs and plans. For additional contextual information, see Portsmouth Gaseous Diffusion Plant, PORTSMOUTH GASEOUS DIFFUSION PLANT, SOUTH ENVIRONMENTAL SAMPLE STATION HAER No. OH-142-M (Page 2) HAER no. OH-142. This South Environmental Sample Station HAER was completed in PORTSMOUTH GASEOUS DIFFUSION PLANT, SOUTH ENVIRONMENTAL SAMPLE STATION HAER No. OH-142-M (Page 3) Part I.

Historical Information In support of this report, there are two appendices: Appendix A and Appendix B, consisting of survey photographs and historical drawings, respectively. Construction History of the South Environmental Sample Station: The South Environmental Sample Station was built in after the initial phase of construction at PORTS. DOE installed the station in order to monitor for compliance with air and water quality standards set forth in new environmental regulations, such as the Clean Air Act, the National Emissions Standards Act, and the Water Quality Act. The interior of the small building features equipment and instrumentation used to monitor the South Holding Pond effluent for environmental compliance.

The air monitoring and water composite sampling equipment were originally installed in the Environmental Sample Station but were removed in the early The station remained empty until the current pH meter and flow monitoring equipment were installed in the early Historical drawings of building plans are included in Appendix B (Figures 4 and 5). Part II. Site Information Description of the South Environmental Sample Station: The South Environmental Sample Station is located in the southeast section of PORTS, just south of the South Holding Pond and east of the South Holding Pond pH Control Facility. The Station features a poured concrete slab foundation, concrete block bearing walls, no window openings, and a front-gabled wood-frame roof covered with asphalt shingles (Figures 2 and 3).

The building s gable ends are clad in vertical wood siding and feature central louvered vents. The main entry consists of a solid door offset on the east fa ade. The building has a total of approximately 100 square feet of floor space. PORTSMOUTH GASEOUS DIFFUSION PLANT, SOUTH ENVIRONMENTAL SAMPLE STATION HAER No. OH-142-M (Page 4) Part III. Sources of Information Department of Energy. The Role of the Portsmouth Gaseous Diffusion Plant in Cold War History. Piketon, OH: U.S. Department of Energy, Department of Energy. Remedial Investigation and Feasibility Report for the Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project at the Portsmouth Gaseous Diffusion Plant, Piketon, Ohio, DOE/PPPO/03-0245&D3. Piketon, OH: U.S.

Department of Energy, Department of Energy. National Historic Preservation Act Section 110 Survey of Architectural Properties at the Portsmouth Gaseous Diffusion Plant in Scioto and Seal Townships, Piketon, Ohio, DOE/PPPO/03-0147&D1. Piketon, OH: U.S. Department of Energy, January PORTSMOUTH GASEOUS DIFFUSION PLANT, SOUTH ENVIRONMENTAL SAMPLE STATION HAER No. OH-142-M (Page 5) Appendix A: Survey Photographs Figure 1: Location and Orientation of Exterior Photographs (A-2 and A-3) PORTSMOUTH GASEOUS DIFFUSION PLANT, SOUTH ENVIRONMENTAL SAMPLE STATION HAER No.

OH-142-M (Page 6) Figure 2: South Side of the South Environmental Sample Station, August Facing Northwest Figure 3: South Side of the South Environmental Sample Station, August Facing Northeast PORTSMOUTH GASEOUS DIFFUSION PLANT, SOUTH ENVIRONMENTAL SAMPLE STATION HAER No. OH-142-M (Page 7) Appendix B: Historical Drawings Figure 4: Facility No. 2 Layout and Details PORTSMOUTH GASEOUS DIFFUSION PLANT, SOUTH ENVIRONMENTAL SAMPLE STATION HAER No. OH-142-M (Page 8) Figure 5: Inlet Baffle and Weir Modifications: Plan, Sections, and Details

In context

Piketon, Ohio The place record: every map, photograph and survey of this town.
Pike County, Ohio 83 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Piketon

24 of 28 records shown

The federal surveyors worked through Piketon building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Portsmouth Gaseous Diffusion PlantHAER OH-1425,856 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-C3,834 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-E3,717 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-D3,595 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-P2,755 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-F2,405 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-V2,352 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-Y2,186 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-R1,979 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-AA1,807 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-B1,783 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-W1,727 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-G1,689 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-X1,672 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-J1,665 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-I1,657 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-Q1,606 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-U1,586 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-H1,405 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-L1,266 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-A1,219 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-O1,180 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-K1,108 words
Portsmouth Gaseous Diffusion PlantHAER OH-142-N988 words

Provenance

  • Written history. Quoted verbatim from HAER OH-142-M. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from linked records; page labels and counts are clearly marked as presentation or calculations.