BlockBefore

Galveston Causeway, Spanning Galveston Bay parallel to I-45, Galveston

Galveston Causeway, Spanning Galveston Bay parallel to I-45, Galveston, Galveston County, TX. Surveyed as HAER TEX,84-GALV,43-, with a 1,167-word written history.

From the record

“This reinforced concrete viaduct spans more than two miles between Galveston Island and the Texas mainland.”

Written record, HAER TEX,84-GALV,43- survey. Machine-read text.

Surveyed by the federal HAER program as HAER TEX,84-GALV,43- · the record runs 1167 words · one of 76 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

59 words

Source document Quoted word for word from HAER TEX,84-GALV,43-. Not written, edited or summarised by this site.

Spanning Galveston Bay east of Interstate 45, between Galveston and Virginia Point, Galveston County, Texas. UTM: USGS: Virginia Point, Texas, quadrangle Date of Construction: Designer: Concrete Steel Engineering Company, New York, New York; Scherzer Rolling Lift Bridge Company, Chicago, Illinois (draw span). Builder: A. M. Blodgett Construction Company, Kansas City, Missouri; Perm Bridge Company, Beaver Falls, Pennsylvania (draw span).

Significance

96 words

Source document Quoted word for word from HAER TEX,84-GALV,43-. Not written, edited or summarised by this site.

This reinforced concrete viaduct spans more than two miles between Galveston Island and the Texas mainland. Its original twenty-eight concrete arches and steel draw span were the first Galveston Bay crossing to withstand hurricane forces. The Scherzer rolling-lift span, since replaced, was one of the world's largest. Seventy-nine additional concrete arches, built from to replaced embankments washed away by a hurricane. Although designed to carry a roadway, an interurban line, and a railroad, the bridge is currently used for railway traffic only. The Galveston Causeway was listed on the National Register of Historic Places in *

Written history

959 words

Source document Quoted word for word from HAER TEX,84-GALV,43-. Not written, edited or summarised by this site.

This document was prepared as part of the Texas Historic Bridges Recording Project performed during the summer of by the Historic American Engineering Record (HAER). The project was co-sponsored by the Texas Department of Transportation (TxDOT). Completed in the Galveston Causeway was built to connect Galveston Island with the Texas mainland. The bridge was needed to replace two railroad trestle structures and a metal truss highway bridge destroyed by a devastating hurricane.' Subsequent to the hurricane, all traffic was handled by a single-track trestle of the Gulf, Colorado, and Santa Fe Railroad the sole means of communication across Galveston Bay.

In a committee of community leaders developed a plan to build a new permanent reinforced concrete viaduct across the bay at an estimated cost of two million dollars. The Concrete Steel Engineering Company of New York City designed the new structure. In the Texas legislature passed a bill authorizing Galveston County to issue bonds for the causeway's construction. The legislation also allowed the county to tax property owners for the retirement of the bonds, and to lease the right-of-way over the structure to steam and electric railway companies.2 Built from to by A. M. Blodgett Construction Company of Kansas City, Missouri, the Galveston Causeway consisted of a 2455'-0"-long concrete arch viaduct with a central lift span, flanked on either end by long stretches of earthen embankments.

The completed structure stretched more than two miles across the bay and included of concrete-faced embankments on the Virginia Point end and on the Galveston end).3 To form the embankments, earth and sand fill was poured over concrete piles connected by tie rods and stabilized by a concrete retaining wall on the upper slopes.

A centrifugal pump driven by a 200-horsepower motor was used to bring the fill three miles through a pipeline from Offats Bayou on Galveston Island to the construction site; two floating concrete plants were used for concrete work.4 The central viaduct consisted of twenty-eight reinforced concrete arches, of span and rise, with fourteen spans flanking either side of a Scherzer rolling-lift 1 The metal truss bridge was the world's longest at its time of construction; see "The Galveston County (Tex.) Highway Bridge," Engineering News 31, No. 10 (March 8, 2 T. Lindsay Baker, Building the Lone Star; An Illustrated Guide to Historic Sites (College Station: Texas A&M University Press, pp. 3 Ibid., p. 95.

4 "Construction Methods Employed in Building the Galveston Causeway," Engineering Record66, No. 2 (July 13, 41. GALVESTON CAUSEWAY HAERNo.TX-37 (Page 3) drawbridge. The drawbridge, which extended 120 feet from center to center of pins, provided a lOO'-O" clear opening for the passage of ships into Galveston Bay. The draw span was designed by the Scherzer Rolling Lift Bridge Company of Chicago and fabricated by the Perm Bridge Company of Beaver Falls, Pennsylvania.5 As completed in the drawbridge was one of the largest of its kind in the world. It weighed pounds, 700 tons of which was steel and the remainder consisting of 500 cubic yards of concrete used as a counterbalance. The lift was operated by two 50-horsepower motors, originally powered by the electric interurban line.

To support the drawbridge's enormous weight, a monumental concrete pivot pier was constructed. The 66'-0"-wide structure originally carried a two-lane brick-paved roadway, one electric interurban track operated by the Galveston-Houston Electric Railway Company, and two railroad tracks.6 Reinforced concrete balustrades form the outside railing and separate the roadway from the tracks. A hurricane severely damaged the bridge's long earthen approaches, but left the central portion and its draw span intact.7 The county replaced the washed-out embankments with concrete arches similar to those in the viaduct's central portion. Reconstructed from to the re-built bridge featured fifty-one new concrete arch spans at the north end and twenty- eight at the south.

New V-shaped reinforced concrete abutments were also added at either end of the structure. Except for replacement of the draw span in the bridge has had few alterations over the years.8 The current structure, extending more than two miles across Galveston Bay, consists of 107 concrete arches and a steel bascule span. In the Texas Highway Department (now Texas Department of Transportation) designed a new concrete highway bridge with a central moveable steel span, built by the Public Works Administration immediately east of the structure.9 In the early the Texas Highway Department added a new high concrete bridge across the bay and raised the vertical elevation of the structure to eliminate its moveable span; together these two structures carry Interstate 45.

Railway traffic continues to use the viaduct, but the roadway is closed to traffic. 5 For more about the Perm Bridge Company, see Victor Darnell, A Directory of American Bridge-Building Companies Occasional Publication No. 4 (Washington, Society for Industrial Archaeology, pp. 6 "Construction Methods Employed," p. 41. 7 "Galveston Storm Damage," Engineering News 74, No. 10 (September 2, 8 Maury Darst, "Causeway Drawspan Soon Will Be Replaced," Galveston Daily News, May 30, p. 4-A. 9 Texas Highway Department, Eleventh Biennial Report (Austin, Texas, p. 12. w GALVESTON CAUSEWAY HAERNo.TX-37 (Page 4) I SOURCES CONSULTED Baker, T. Lindsay. Building the Lone Star: An Illustrated Guide to Historic Sites.

College Station: Texas A&M University Press, "Construction Methods Employed in Building the Galveston Causeway." Engineering Record 66, No. 2 (July 13, Darnell, Victor. A Directory of American Bridge-Building Companies Occasional Publication No. 4. Washington, Society for Industrial Archaeology, Darst, Maury. "Causeway Drawspan Soon Will Be Replaced." Galveston Daily News, May 30, p. 4-A. "The Galveston County (Tex.) Highway Bridge." Engineering News 31, No. 10 (March 8, "Galveston Storm Damage." Engineering News 74, No. 10 (September 2, "Streamlined Bridge Spans Canal." Galveston Daily News, December 25, p. Texas Highway Department. Eleventh Biennial Report. Austin, Texas, Texas Historical Commission. National Register files, Austin, Texas.

In context

Galveston, Texas The place record: every map, photograph and survey of this town.
Galveston County, Texas 158 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Galveston

24 of 69 records shown

The federal surveyors worked through Galveston building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Fort Point District Boat YardHABS TEX,84-GALV,44A-9,705 words
U.S. Coast Guard Cutter DauntlessHAER TX-34023,700 words
502 29th StreetHABS TX-4023,223 words
Williams-Tucker HouseHABS TEX,84-GALV,42-2,763 words
First Presbyterian ChurchHABS TEX,84-GALV,22-2,587 words
Powhatan HotelHABS TEX,84-GALV,5-2,409 words
Trinity Episcopal ChurchHABS TEX,84-GALV,17-2,364 words
U. S. Custom HouseHABS TEX,84-GALV,12-2,109 words
James Mareau Brown HouseHABS TEX,84-GALV,1-1,904 words
Colonel Walter Gresham HouseHABS TEX,84-GALV,26-1,818 words
Henry Rosenberg HouseHABS TEX,84-GALV,13-1,801 words
George Sealy HouseHABS TEX,84-GALV,28-1,728 words
Galveston Baggage & Cordage FactoryHABS TEX,84-GALV,23-1,726 words
Michel B. Menard HouseHABS TEX,84-GALV,3-1,547 words
Eaton Memorial Chapel of Trinity Episcopal ChurchHABS TEX,84-GALV,18-1,505 words
John Henry Hutchings HouseHABS TEX,84-GALV,30-1,478 words
Morris Lasker HouseHABS TEX,84-GALV,27-1,392 words
University of Texas Medical School BuildingHABS TEX,84-GALV,36-1,370 words
U.S. Coast Guard (USCG) Fort Crockett HousingHABS TX-34761,285 words
U.S. Coast Guard (USCG) Fort Crockett HousingHABS TX-34741,266 words
U.S. Coast Guard (USCG) Fort Crockett HousingHABS TX-34851,266 words
U.S. Coast Guard Cutter PAWPAWHAER TX-1061,263 words
Trueheart-Adriance BuildingHABS TEX,84-GALV,15-1,255 words
George Ball HouseHABS TEX,84-GALV,4-1,237 words

Provenance

  • Written history. Quoted verbatim from HAER TEX,84-GALV,43-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.