Southern Pacific Railroad, Ogden-Lucin Cutoff Trestle, Spanning Great Salt Lake, Brigham City
Southern Pacific Railroad, Ogden-Lucin Cutoff Trestle, Spanning Great Salt Lake, Brigham City, Box Elder County, UT. Surveyed as HAER UTAH,2-BRICI,3-, with a 2,158-word written history.
From the record
“Longest trestle mi.) and fill project in the USA.”
Written record, HAER UTAH,2-BRICI,3- survey. Machine-read text.
Surveyed by the federal HAER program as HAER UTAH,2-BRICI,3- · the record runs 2158 words · one of 30 surveyed structures published for this county.
Source document
Quoted word for word from HAER UTAH,2-BRICI,3-.
Not written, edited or summarised by this site.
T. Allan Comp, HAER UT-13 OGDEN-LUCIN CUTOFF TRESTLE SOUTHERN PACIFIC RAILROAD The great transcontinental railroad building contest between the Southern Pacific and Central Pacificirailroads ended at Promontory Summit, fifty-three miles west of Ogden, Utah, in The road as then constructed between Ogden on the east and Lucin on the west was miles long, running some fifty miles north before turning west to skirt the Great Salt Lake. Two grades, Kilton Hill feet) and Promontory Hill feet) rose above the feet level of the lake and required a total of feet of ver- tical climb. With grades of ninety feet to the mile and curves as sharp as ten degrees, the road was a slow and diffi- cult one for a steam locomotive.
The turn of the century brought with it several major changes in the Southern Pacific Railroad. E. H. Harriman, new president of the road, initiated what became a program of reconstruction and improvement and one of the first projects was the extensive rehabilitation of 373 miles of the old Central Pacific Line between Reno and Ogden. Among the ^most difficult and spectacular pieces of construction^ on this project was the Ogden-Lucin Cut-Off.
Begun March 17, and completed on November 13, the -2- UT-13 new cut-off was forty-three miles shorter than the old, in- volved no major grades, cut curvature to 1.5 degrees, and cost about A supplement to the Scientific American (May 21, termed the new road "perhaps the most noteworthy engineering achievement ever attempted in bridge- and-fill work" and concluded that "the Southern Pacific, by building the Ogden-Lucin cut-off, has crowned the science of long distance trestling-and-fill embankment construction." Cttu HAER UT-13 The problem that confronted the Southern Pacific's Chief Engineer William Hood was fairly straightforward. As nearly as possible he was to construct a level, straight- line track from Ogden to Lucin.
The Salt Lake City Commer- cial Club attempted to get the road to run southwest to the city and then north to Ogden, but the railroad calculated lender that this route would add per ton for each of the1 - tons of through freight carried by the railroad each year and the idea was abandoned. Thus it was that Hood then undertook the lake cut-off, despite the fact that it required taking the railroad, to sea on ten miles of fill, eleven miles of temporary trestle (to be filled at a later point in time) and ten miles of permanent trestle. Stories of bottom- less pits and "peculiar disasters" in the middle of the lake apparently impressed him little, and work began.
The road was built west; from Ogden to the shores of the.lake, crossing to Promontory Point on an embankment and r Ae ro/n f trestle.* fcsscrccpfee^ey was crossed by 5.3 miles of heavy cut; the road then struck across the main body of the Great Salt Lake to Strong's Knob on the west shore. From there the road ran west to Lucin over an easy grade feet in fifty- two miles). Chief Engineer Hood mentioned in an interview (Engineering News, February 27, 190 2) that he was particular- ly anxious to get surveys and construction underway because * Promontory Point is not the point where the transcontinental railroad was first joined. This was farther north. -4- HAER UT-13 of the extremely low stage of water in the lake at that time.
Work on the land sections began in spring of with crews pushing west from Ogden and east from Lucin. The Ogden-Great Salt Lake portion required two steel bridges and forty-four masonry or steel culverts. Excavations for these openings were about 100 feet long and averaged twelve feet in width and thirteen feet in depth. For support, piles were driven in the bottom of the excavation then cut to a twelve-inch height. Concrete was then poured around and on the piles in eight-inch courses. From the lake shore to the Promontory penninsulaj was a distance of 8.4 miles, most of which was bridged by tempo- ra'ry trestle which the railroad :s j &3-later/if ill.
The first three miles were quite difficult owing to the low level of the lake which left behind a bed of mud as much as eight to ten feet thick beneath the salt crust. Construction tracks were laid on this surface as follows: planks were laid on the mud and 100 pound sand bags were then placed three layers deep. Cross timbers, 12" x 12" x 10' were then set on the sand bags and held by three stringers 8" x 16" x 30' upon which ties were set and temporary track laid. This tempo- rary track was constructed just south of the permanent fill so that cars loaded with shale and gravel could be run out to dump their load on the north side to form the permanent embankment. This fill continued out into the lake until the road reached water of four or five feet in depth. At that point 5 .
HAER UT-13 construction methods were changed over to pile driving opera- tions. Eight floating pile drivers were stationed in four places at intervals of about one mile. Most of this section was temporary trestle J32 ii composed of four forty-foot piles capped with 12" x 12" timber. Each set of four piles (termed a bent) was spaced fifteen feet apart; 8" x 16" x 30' stringers held the caps together and formed the base for the track ties. Eventually the temporary trestle was to be filled, leaving the bents in place. By thus filling up the bed of the lake around the trestle, the company felt addi- tional strength would be added. Where the current of the Bear River cut a channel into the lake bed, 600 feet of permanent, open trestle were installed.
A hard-pan bottom in the channel provided excellent support for the five- piling bents. The section of road crossing over the Promontory penninsula was 5.3 miles in length. In order to maintain road level, very heavy cuts were required. Work was carried on from the western end of the proj- ect in much the same manner. Total length of this lake section was about twenty miles and again the combination of temporary and permanent trestling was employed, the latter totaling twelve miles in length. This permanent trestle lies in 30 to 35 feet of water and was constructed of five seventy-foot piles, each bent then being reinforced with heavy sash and sway braces. The same 12" x 12" caps and 8" x 16" x 30* stringers carried the track fifteen feet ~6~ HAER ur-13 above the level of the lake.
Construction of the roadbed on the trestle was the last step before opening the road. Rather than the usual open trestle with rail and ties directly connected to the rigid trestle, the Salt Lake trestle was ballasted with fifteen inches of gravel under the ties. As a result, the peculiar vibration and rumble often experienced by passen- gers when crossing a trestle, was eliminated. The single, track portion of this ballasted deck trestle was sixteen feet wide'^fea^bsr both single and double track sidings and numerous extension platforms often increase this width. The road was laid with eighty pound"rail. Several additional factors, some expected and some not, complicated the work. . A fresh water supply, essential to steam-driven machines as well as men, had to be secured.
The railroad put down two artesian wells, the first two miles inland and the other out in the lake four miles from the eastern shore, but only the latter was successful. Even with one good well and more water hauled in from Ogden, some way of transporting the water to various stations in- the lake had to be devised. The railroad's answer was the "Promontory," a specially constructed stern wheeler capable of carrying gallons of fresh water. The boat was 127 feet long, twenty-two feet in beam and drew eighteen inches of water. Powered by two 500 engines, the boat held accommodations for officers and guests of the road, but was most often used to carry food, water, and other UT-13 -7- supplies to the temporary stations on the lake.
Men working on the lake were often in the briny water and the company directed these men to wear rubber boots. Unfortunately, the brine soon rendered the rubber useless and the men abandoned the boots, going into the water in their normal attire.
There were apparently few adverse effects/ in fact, the Scientific American (op.cit.) reported that construction had "been attended with less loss of life and injury...than is usual on ordinary railroad track of equal mileage." No locomotives or cars were lost and few were even derailed, but Engineering News (November 27, knew of the heavy salt content in the water and noted that "Those who have scratches or sores on their persons have found that building a railroad across the lake is not such easy work." Pile driving presented the greatest difficulty be- cause of the differences in geology and sediments on the lake bottom. On some occasions the steam pile driver would not move the pile more than one or two inches with each blow.
But once through this hard strata the pile would often drive quite easily. On other occasions the pile might be driven thirty to fifty feet and still continue to .rise from a few inches to several feet during the brief pause between hammer blows. Perhaps the most dramatic moments occurred on the eastern section when one twenty-six foot pile was driven its entire length by one hammer blow. A second twenty-eight-foot pile was placed on top of the first -g- IIAER ur-13 and again the hammer blow drove the pile to water level. Examination showed the bottom to be covered with fifty feet of mud deposited by the Bear River. To solve the problem forty-foot piles were driven into the mud then tied, capped, and braced.
The railroad hoped this would hold while the construction trains dumped their loads of fill and gradually solidified the bottom. All these problems overcome, the tracks from the east and west shores met near the center of the lake on November 13, A total of piles had been driven, enough to stretch a total of 2.8 million lineal feet. On Thanks- giving Day, November 26, Southern Pacific President E. H. Harriman, in the presence of railroad dignitaries from all over the United States, drove a solid gold spike into the last tie and thus celebrated the completion of the Ogden- Lucin Cut-Off Trestle. The road was opened for regular traffic March 8, just nine days short of two years after the unprecedented project was begun.
Scientific American (op.cit.) predicted in that the trestle would "ever stand as a fine monument' of achievement to its build- ers, " /Ba-3r9=?3 one can only echo that praise. T- Allan Comp Project Historian August, HAER UT-13
Bibliography
Arthur,, "Construction Work on the Southern Pacific Cut-Off Across the Great Salt Lake, Utah/1 Engineering News, November 27, Full-page report on early construction, including three small illustrations of embankment, temporary trestle and the "Promontory," Bennett, Herbert I. "Railroading Across Great Salt Lakej" Scientific American Supplement No. May 21, A short article praising the Ogden-Lucin cut-off across the Dead Sea of America. Includes five large illustrations of trestle fill-train and log-boom of pilings. Poster, Wolcott C. A_ Treatise' on Wooden Trestle Bridges* According to the-Present Practice on American Railroads. New York, A very thorough work on trestles.
Its earlier publication precludes mention of Ogden-Lucin; there is no discussion of gravel beds for ties on railroad trestles. "The New Line of the Southern Pacific Ry. Across Great Salt Lake," Engineering News, February 27, An early announcement of construction plans. Good source for reasons behind route selection. Leonard, John W. Whof s Who in Engineering.. New York, Southern Pacific Bureau of News, The Southern Pacific Tradition. San Francisco., Primarily a public-relations and tourist souvenir. Brief mention of Harriman reconstruction and the Ogden-Lucin cut-off. One good illustration of railroad pile-drivers meeting in the center of the lake.
ADDENDUM TO: HAER UT-13 SOUTHERN PACIFIC RAILROAD, OGDEN-LUCIN CUTOFF HAER UTAH,2-BRICI,3- TRESTLE Spanning Great Salt Lake Brigham City vicinity Box Elder County Utah COLOR TRANSPARENCIES HISTORIC AMERICAN ENGINEERING RECORD National Park Service U.S. Department of the Interior C Street NW Washington, DC
The federal surveyors worked through Brigham City building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER UTAH,2-BRICI,3-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.