BlockBefore

Telluride Power Company, Olmsted Hydroelectric Plant, Mouth of Provo River Canyon West of U.S. Route 189, Orem

Telluride Power Company, Olmsted Hydroelectric Plant, Mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT. Surveyed as HAER UTAH,25-OREM.V,2-, with a 1,638-word written history.

From the record

“This plant replaced the earlier Nunn Hydroelectric Plant (see HAER No.”

Written record, HAER UTAH,25-OREM.V,2- survey. Machine-read text.

Surveyed by the federal HAER program as HAER UTAH,25-OREM.V,2- · the record runs 1638 words · one of 21 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Present Use

50 words

Source document Quoted word for word from HAER UTAH,25-OREM.V,2-. Not written, edited or summarised by this site.

Hydroelectric generation. The Olmsted Hydroelectric Power Plant is used today to generate electricity for the regional power grid. With the completion of the nw Jordanelle Dam on the upper Provo River, power production at the plant will be curtailed, but not eliminated, because of increased water storage above the plant.

Written history

1360 words

Source document Quoted word for word from HAER UTAH,25-OREM.V,2-. Not written, edited or summarised by this site.

Donald C. Jackson, Addendum to: Telluride Power Company, Olmsted Hydroelectric Plant HAER No. UT-5 (Page.9{~ The Olmsted Power Plant is a 90-foot by 65-foot, single-story gable-roofed, brick hydroelectric power plant completed in by the Telluride Power Company to replace the Nunn Power Plant (see HAER No. UT-2 for more data on the Nunn Power Plant). The Nunn Power Plant was built by the Telluride Power Company under the direction of L. L. Nunn in order to develop hydroelectric power along the Provo River in Provo Canyon. k Because of difficulties with downstream water users in the Utah Lake Valley near Provo, Nunn was forced to abandon his plans to build a large storage dam in Provo Canyon.

Nunn subsequently built the original Nunn Power Plant under a 120-foot "head" (or water pressure) in order to generate electric power for mines in Eureka and Mercur. However, it was recognized from the beginning that this initial plant would probably be replaced as soon as it became politically possible and economically feasible to do so. In the company lengthened the power canal that served the Nunn plant and extended it to the mouth of Provo Canyon. This allowed the construction of a new hydroelectric power plant that operated under a "head" of 330 feet, an increase of 200 feet over the original Nunn Power Plant.

Completed in April and known as the Olmsted Power Plant in honor of an engineer involved in construction, the enlarged plant contained three horsepower Allis-Chalmers turbines with a combined capacity of over hp. This was almost a five-fold increase over the Nunn plant. The Olmsted plant also contained three volt, three-phase General Electric generators and a bank of volt transformers. Operation of the Olmsted plant required abandonment of the old Nunn plant and included construction of over feet of new wooden flume work, and feet of tunnels. [2] The upgrading of the Telluride Power Company's Provo River development coincided with the firm's expansion into general power production for the north/central Utah market.

In Nunn built a kilowatt capacity hydroelectric plant on the Logan River near Logan, Utah, that was subsequently transferred to the larger company. [3] The Logan plant operated under a head of 212 feet and expanded the firm's operations into the territory north of Salt Lake City. Despite being separated by more than 100 miles, the Olmsted and Logan installations were joined together by a lengthy transmission line that allowed the company to more efficiently serve the various "loads" placed upon it by an ever-growing number of customers. Within a few years of the Olmsted plant's construction, the Telluride Power Company became involved in implementing plans to use Bear Lake on the Utah/Idaho border as a reservoir for a new hydroelectric power plant on the Bear River.

[4] This new plant promised to dramatically increase the firm's generation capacity and help relieve problems exacerbated by water supply problems at Olmsted. Although Olmsted was equipped with generators capable of producing over hp of three-phase electrical power, there was only enough water to produce about half of this capacity. This situation soon became a major bone of contention between the Nunn brothers and the Telluride Power Company's eastern financial leadership under the direction of president James Campbell. In letters exchanged between Campbell and P. N. Nunn in bitter accusations over the company's operations were aired with Campbell, accusing the Nunn brothers of running a fiscally irresponsible electric power network.

[S] In response, Nunn accused the eastern capitalists of not understanding the complexities of the business. In addition to the underutilization of the Olmsted plant's generating capacity, Campbell's complaints centered around company support for L. L. Nunn's Telluride Institute. This institute was established in Colorado in the early when Nunn faced a critical shortage of men qualified to oversee operation of the troublesome single-phase motors used by the Telluride mines. Under Nunn's guidance, the Telluride Institute trained non-college men for employment in the company's ever- expanding electric power empire. As a result of Nunn's interest in the welfare of his workers, the institute also created a cadre of employees bearing extreme personal loyalty to Nunn.

The technical necessity of the Addendum to: Telluride Power Company, Olmsted Hydroelectric Plant HAER No. UT-5 (Page 3 institute was somewhat lessened when the company abandoned its single-phase system in favor of less troublesome polyphase facilities. However, Nunn still believed in its character-building function and its ability to foster a partnership between management and labor that was relatively unique. As such, in he moved the Telluride Institute to new headquarters next to the Olmsted plant and began planning for its continued growth. In contrast, Campbell considered the institute to be an unnecessary drain on the company's financial resources. He also thought the loyalty that it fostered among workers to Nunn was akin to old-fashioned cronyism.

To Campbell, the institute constituted a facade that allowed the Nunn brothers to provide special treatment for their friends at the company's expense. For several years, the problems between the Nunn brothers and the firm's eastern corporate leadership slowly intensified. Finally, in Campbell and his associates were able to remove L. L. Nunn from the board of directors and effect litigation of the Telluride Power Company's assets. [6] As part of this, the Telluride Institute at Olmsted was shut down and the buildings adapted to other uses. This marked the beginning of the modern Utah Power & Light Company that was formed around the nucleus of the hydroelectric power network created by Nunn.

This new company eventually acquired all of the major power generating units in northern Utah (and much of southern Idaho) and became the focus of electric power development in the region. The Olmsted plant played an important role in the operations of the new company, especially once agreements with downstream irrigators were reached that allowed more water to flow through its turbines. In an additional hp generator unit was added to the Olmsted plant and this brought the facility up to its present capacity. Aside from this, there has been no major alteration of the plant. However, with construction of the new Jordanelle Dam by the Bureau of Reclamation , the power production of the Olmsted plant will be reduced, but not eliminated, in the future.

Addendum to: Telluride Power Company, Olmsted Hydroelectric Plant HAER No. UT-5 (Page),tJ 'I [1] Full photographic coverage of the Olmsted Hydroelectric Plant is proved in HAER No. UT-5. This file includes photographs taken by Jack Boucher in copies of historic photographs and copies of historic drawings of the site. [2] Data on the Olmsted system is given in "The Telluride Power Company - Utah (File (circa pp. This typewritten manuscript is in the historical files of the Utah Power & Light Company. The author thanks Dr. John McCormick of the Utah State Historical Society for making it available. [3] The Logan plant is illustrated in Nunn, "Pioneer Work in High Tension Electric Power Transmission," pp.

[4] The early history of the Bear Lake development is described in "Utah Power & Light Company: History of Origin and Development," pp. [5] Evidence of friction between Nunn and others in the firm's corporate leadership is provided in "The Telluride Power Company - Utah (File pp. This includes a copy of a letter from James Campbell to P. N. Nunn dated September 8, and a response from P. N. Nunn to James Campbell dated December 4, These letters comprise an acrimonious exchange over the operation and direction of the Telluride Power Company's hydroelectric power systems. [6] L. L. Nunn's involuntary removal from the Telluride Power Company's Board of Directors in is described in "The Telluride Power Company - Utah (File pp.

Nunn's departure from the company just prior to its merger into the new Utah Power & Light Company is sometimes related to his poor health. However, Nunn lived until and he left the company not because he want to do so, but because he was forced to do so. [7] A list of all the predecessor companies that formed the Utah Power & Light Company as of is provided in the frontispiece of "Utah Power & Light Company: History of Origin and Development.

In context

Orem, Utah The place record: every map, photograph and survey of this town.
Utah County, Utah 218 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Orem

3 records

The federal surveyors worked through Orem building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Telluride Power CompanyHAER UTAH,25-OREM.V,13,267 words
Denver & Rio Grande Western RailroadHAER UTAH,25-OLMS,1-755 words
Telluride Power CompanyHAER UTAH,25-OREM.V,1A-40 words

Provenance

  • Written history. Quoted verbatim from HAER UTAH,25-OREM.V,2-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.