BlockBefore

Hurricane Irrigation Canal, State Route 15 Vicinity, Hurricane

Hurricane Irrigation Canal, State Route 15 Vicinity, Hurricane, Washington County, UT. Surveyed as HAER UTAH,27-HURI,1-, with a 1,992-word written history.

From the record

“Hurricane Irrigation Canal, State Route 15 Vicinity, Hurricane, Washington County, UT”

Survey record header. Machine-read text.

Surveyed by the federal HAER program as HAER UTAH,27-HURI,1- · the record runs 1992 words · one of 108 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Written history

1911 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER UTAH,27-HURI,1-. Not written, edited or summarised by this site.

T. Allan Com?, HAER UT-17 0 && * UTAH THE HURRICANEACANAL J * The construction of the Hurricane Canal is one of early Utah's proudest stories of pioneer determination. Built completely by hand, the 7.5 mile canal clings to the sheer walls of the virgin River Canyon before leaving to follow the Hurricane Fault and then encircle the flat farmlands of the Hurricane Bench. The canal took eleven years and to build, most of the capital being represented by the labor of men who paid for their shares in the canal company by working on the canal during the winter months. The completed canal brought water to acres of parched bench land and created the now successful village of Hurricane, Utah.

Organization Early residents of the area settled on the small bottom lands of the upper Virgin River Valley and else- where, but the erratic floods of the river diminished the available land while expanding families increased the need for more farmland. As some families began to move out of the area in search of new lands, others turned their eyes to the Hurricane Bench. If farms could be established here families could remain together and lands would be freed from the threat of flood. But water was essential HAER UT-17 to this expansion, and few thought a canal was possible. In the Erastus Snow and pioneer surveyor John M. MacFarlane explored the area and decided a canal was not a feasible undertaking.

Brigham Young's son John came to the valley in with the idea of a canal to take water out on the bench, but after a quick survey decided it was impracticable and went home. The little towns of Virgin, Mountain Dell, Duncan's Retreat, Rockville, Grafton, Springdale, and Toquerville, prodded by their need for new land, continued to wish for some way of getting water to the bench despite the seeming impossibility of the task. Finally, two men from the area, James Jepson and John Steele, decided in that a dam and canal could be built and began to interest others in the project. By the end of June a committee of six had been formed and, after investigating the canyon, returned a favorable report.

The Hurricane Canal Company was soon created and the first meeting held in Toquerville Hall on July 11, August 25 brought aaother stockholders meeting, this time to hear the preliminary report of County Surveyor Isaac MacFarlane. He reported that the canal could be constructed, that it would have to be about 7.5 miles in length, would require a dam fifteen feet high, and would irrigate about acres. Although MacFarlane did not estimate costs, his report was accepted. The meeting then moved that the company incorporate and begin I1AER UT-17 construction. J. T.

Willis was appointed superintendent of construction on November 15, Construction Every reporter and historian who has visited the canyon of the Virgin River and the canal site comments on the impossibility of appreciating the difficulty of the undertaking. The steep canyon walls are chiefly lime rock and conglomerate which would often slide down the sides of the canyon after excavation was begun, burying the canal route under additional tons of cover. In other places fills had to be made with loose rock or a flume on trestle- work built across the opening or gap. There was no road into the canyon during the first year so all materials for canal and dam construction, as well as tools, bedding and food had to be carried in by hand.

Most of the work was done between November and May when farm chores were less demanding. Workers camped at the construction site and transients were often put to work for their board. Construction tools were quite simple. Except for a short distance near the dam, it was not possible to use horse teams with plows and scrapers so most of the work had to be done by hand. Wheelbarrows, picks, shovels, crowbars, and hand-driven drills were the basic tools used in the construction of the 12-foot grade or bed for the canal which was 8 feet wide and 4 feet deep. HAER UT-17 Canal company shareholders built the canal by the contract or piecework method. The working survey marked off the route in 4-rod lengths, then carefully estimated the cost of construction for each length.

These lengths or stations were taken up by stockholders working out their stock payments at per day. The survey esti- mates allowed 15< per cubic yard for earth excavation, 75$ per loose rock and gravel, and for solid rock. When workers could demonstrate that the estimates were incorrect, adjustments were made. Building the dam turned out to be much more diffi- cult than originally anticipated. Specifications called for a structure seventy five feet in thickness up and down the river, and five feet higher than the bottom of the canal. The river is about forty feet wide at the place called the Narrows where the dam was built.

The sides and bottom of the river are solid rock, the north side was a solid limestone cliff over 100 feet high and on the south was a rock that rose nine feet to a shelf above the river. The site was ideal for a dam, but inexperience with construction and the raging floods of the Virgin led to several disappointments. The plan was to use the shelf on the south side for a spillway and during the winter of huge rocks were blasted from the sides of the canyon and dropped into place as an anchor. Smaller rocks were then used to fill -5- HAER UT-17 in and complete the dam. The finished structure looked sturdy enough and the canal company paid the Isom Company for its work.

About a year later flood water came surging out of the Narrows, picked up the dam and left the huge boulders strung along the river below the dam site. For its second attempt the company secured a big pine log from the Kolob Mountains north of Virgin and laid it across the river by setting one end into a hole in the limestone cliff and the other into a slot cut into the south shelf. Juniper posts were then laid with their butts on the log and their tops upstream in the river and the whole mass weighted down with rocks. This dam held for about a year until another flood lifted the log and its load of juniper posts and rock out of its mountings and carried the timber downstream. The third time proved the charm.

The pine log was recovered and put back in its slots and junipers again placed with their tops upstream. This time two layers of rocks were placed on the juniper logs and then the whole mass was woven together with heavy galvanized wire. The dam held. It had taken about six years and three attempts, but there was now water available for the canal to carry. If the dam was difficult, the canal was only more so. Carving a twelve foot bed out of solid limestone or loose conglomerate was hard and dangerous work. Time dragged on HAER UT-17 and work.progressed slowly. Landslides wiped out months and even years of work, tunnels had to be blasted through solid rock, flumes on trestlework were built to span open spaces like Chinatown Wash.

Winter after winter passed and still the canal remained uncompleted. Discouragement began to overtake the workers until by only seven or eight men were still working on the canal. As progress came to a standstill, the canal board realized it must find the cash necessary to supply construction needs or work would stop altogether. Stockholders had considered asking the Church for help as early as but four more years of effort passed before the canal company decided the assistance was essential. Finally, in James Jepson, one of the originators of the canal, went to Salt Lake City for an audience with Church President Joseph H. Smith. After a brief but determined exchange between Jepson and Smith, Jepson returned home with the cash the canal company needed.

The stimulus of Mormon Church support and the cash were sufficient to renew the spirit and the treasury of the company and work again went ahead. On August 6, eleven years after the canal was begun, water flowed over the dam spillway, through the canal and onto the Hurricane Bench. UT-17 Settlement When the company formed in each share of stock entitled the owner to one acre of farm land with primary water right and an equity in a town lot. Both fields and town lots were distributed by drawing, a sort of pioneer land lottery.

Individuals were restricted to a twenty acre maximum because the company wanted to keep the size of stockholdings down to a size men could afford to carry (numerous assessments were levied on the stock to help defray canal construction expenses) and also to make it possible for all men, young and old, to get farms and homes rather than just a few wealthier men owning all. The only exception to the twenty acre maximum was made for each ^ men with grown sons who were-.each 'allowed twenty acres'. With water on the bench, the 11-year-old company stock could finally deliver what it had long promised and farming on the new lands began almost immediately. Some grain was raised in (some fields producing fifty bushels of wheat per acre) and in Mr. and Thomas P.

Hinton moved into a wooden granary to become the first residents of Hurricane. Other stockholders farmed their lands by camping during the week and then returning home for the weekend. Ten families established homes in Hurricane in and although there was still trouble with the new ditch breaking, a rather common event until the structure settled, the new lands of the Hurricane IIAER UT-17 Bench proved themselves.well worth the struggle to bring in irrigation water. Conclusion If the Hurricane Canal is considered within the secu- lar framework of technological history, a somewhat analyti- cal perspective becomes possible. As an engineering accom- plishment, the Hurricane Canal can hardly be compared favorably with earlier canals, be they Egyptian, Roman, Medieval, or even early American.

The Hurricane Canal is perhaps best seen as the recognition of necessity. New lands and the water to irrigate them were essential if families were to stay intact. To bring water to those lands a canal had to be constructed. Once that necessity was recognized, the rest followed as a matter of course. While one may marvel at men willing to accomplish their goals by using rather primitive hand tools in the midst of a rapidly industrializing society, it is their determina- tion' and not their engineering prowess which should be most admired. Allan Comp Project Historian August

Bibliography

Sources for Hurricane Canal history are few in number and often colored by the drama of an early Utah pioneer adventure. Of those that do exist, Larsen is by far the most carefully researched and documented. Evans, Richard L., "When Water Came to Hurricane," The Improvement Era, August Jensen, Andrew (compiler) Manuscript History of Hurricane Ward, Washington County, Utah. Unpublished manuscript compiled about and kept in the L. D. S. Church Historical Office. Larsen, Andrew Karl, I Was Called to Dixie, Salt Lake City, Utah, Washington County Chapter; Daughters of Utah Pioneers Under pixie Sum A History of Washington County by Those Who Loved Their Forebearers. Panguitch, Utah,

In context

Hurricane, Utah The place record: every map, photograph and survey of this town.
Washington County, Utah 84 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Hurricane

4 records

The federal surveyors worked through Hurricane building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Virgin River BridgeHAER UTAH,27-HURI.V,I-4,489 words
Gould Wash BridgeHAER UTAH,27-HURI.V,4-2,966 words
Virgin River Warren Truss BridgeHAER UTAH,27-HURI.V,3-45 words
Virgin River BridgeHAER UTAH,27-HURI.V,2-37 words

Provenance

  • Written history. Quoted verbatim from HAER UTAH,27-HURI,1-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.