BlockBefore

Ogden River Bridge, Spanning Ogden River at Washington Boulevard, Ogden

Ogden River Bridge, Spanning Ogden River at Washington Boulevard, Ogden, Weber County, UT. Surveyed as HAER UT,29-OGDEN,4-, with a 4,569-word written history.

From the record

“The Ogden River Bridge is a five-span, reinforced poured concrete structure built in It is a good example of an early century reinforced concrete bridge.”

Written record, HAER UT,29-OGDEN,4- survey. Machine-read text.

Surveyed by the federal HAER program as HAER UT,29-OGDEN,4- · the record runs 4569 words · one of 13 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

4436 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER UT,29-OGDEN,4-. Not written, edited or summarised by this site.

The Ogden River Bridge is a five-span, reinforced poured concrete structure built in It is a good example of an early century reinforced concrete bridge. Construction of such large concrete structures at such an early date in the development of reinforced concrete structure was unusual. The bridge is also significant because it reflects the city's growth and expansion during the In addition, this bridge was probably the last structural design by Fred Berne who built, among other important structures, the Ogden Egyptian Theater. Located on the Ogden River Bridge is the "Welcome to Ogden" sign, installed 55 years ago. Historians: Michael R. Polk, with contributions by Allen C. Roberts, Sagebrush Archaeological Consultants, Ogden, Utah, May Ogden River Bridge HAER No. UT-62 (Page 2) I.

BRIDGE HISTORY A. Need for a Bridge The state of Deseret was created in March by the earliest Mormon emigrants into the Salt Lake Valley. The legislative body of Deseret, the General Assembly, was first convened in December and continued until April 5, seven months after creation of the territory of Utah by the United States Congress.1 During its short life, this body created some of the most important and lasting legislation in Utah history. Realizing the vital importance of a regional transportation network, the assembly passed an ordinance on February 1, authorizing the location of two state roads, one from Temle Block in Salt Lake City to the county seat of then "Tuilla County" and the other from Ogden to Provo.

The road, built from Provo to Ogden, became known as the Territorial Road and then later as the State Road. In Ogden, this road changed names several times. It was first known as Main Street until Washington Avenue until and presently Washington Boulevard.2 It was also designated U.S. 89 when Utah adopted the Federal numbering system for highways in In planning road construction between Ogden and Salt Lake City, two prominent obstacles stood in the way: the Weber and the Ogden rivers. During a trip to Ogden in September Governor Brigham Young granted Captain James Brown, leader of a detachment of the Mormon Battalion, the right to build bridges across these rivers and to collect tolls from travelers.4 This grant was later sustained by the General Assembly.

As part of this grant, Brown was directed to build the bridges 13 feet wide and to use the collected tolls to maintain the bridges and roads near them in good condition. After five years, the two bridges were to be turned over to the road commission and would, thereafter, become the property of the territory.5 In the Spring of Captain Brown paid David Moore to build a log bridge over the Ogden River on the Territorial Road, thus providing the first dependable wagon access to Ogden across this waterway.6 Two other bridges were built in the same location during the and During the a bridge was constructed, using funds appropriated from the Utah Territorial Legislature.

Construction of this bridge was only authorized with an understanding that Ogden City and Weber County would provide a percentage of construction costs.7 In the third bridge to be built over the Ogden River on Main Street was constructed. Ogden City contracted with David Moore to construct a replacement bridge on Main Street (Washington Boulevard).

The cost of this bridge was Another bridge construction effort at this location began, as a major political struggle in Ogden reached its climax in In this year, the long struggle between Ogden Gentiles and Mormons reached a turning point when the Liberal Party (Gentiles) won every seat on the Ogden City Commission.9 Shortly after taking office, the new mayor and city commissioners undertook some municipal changes which, to some extent, altered the face of the city of Ogden. Most significantly, the city's northern boundary was moved twenty blocks north from the Ogden River to accommodate new growth. The east-west streets were then renumbered accordingly. Thus, old 5th Street became Street.10 Ogden River Bridge HAER No.

UT-^2 (Page 3) An opportunity presented itself soon after, to help promote new growth in this northern area of the city. On May 23, the Ogden city engineer briefed the Ogden City Commission on the deteriorated condition of the existing wooden bridge across the Ogden River at Washington Avenue.11 He recommended that the bridge be either replaced or that immediate repairs be undertaken by his office. About this same time, the Ogden City Railway expressed interest in expanding its trolley system tracks north of the Ogden River on Washington Avenue. It offered to pay three-eighths of the cost of a new bridge, providing it carried a trolley track portal in addition to the proposed roadway portal.

Weber County also agreed to pay one-fourth of the cost of the bridge.12 The city requested bids for the project and received six by June 20. On June 22, the city awarded the job to the Smith Bridge Company of Toledo, Ohio, for The contract specified construction of a new iron and steel pin-connected Pratt through truss bridge across the Ogden River a Washington Avenue. The bridge measured 121 feet long and 24 feet high and had two portals, one for street cars and the other for wagons, horses and, later, automobiles. The "roadway portal" was 24 feet wide and was located on the east (upriver) side of the span. The "Motor Portal," measuring 12 feet wide, was on the west (downriver) side of the span.

A six-foot-wide sidewalk was placed on either side of the bridge.14 This motor portal served to take a single lane of streetcar traffic across the Ogden River. This line was one of several operated by the Ogden Rapid Transit Company from Street on the south, north to North Ogden. It was abandoned on December 25, and some of the tracks were removed from Washington Avenue in late including those on the concrete Ogden River Bridge, built in Another expansion of Ogden, north of the Ogden River, occurred during the and During this time, due to increased rail traffic in the west and the fact that Ogden was a critical railroad junction, the city was able to increase its importance as a center of agriculture and industry.

During the this growth was spurred by the construction of several new military facilities including the Defense depot, Ogden Arsenal, Clearfield Naval Supply Depot, and Hill Air Force Base.16 This growth promoted local highway improvements including replacement of the Riverdale viaduct, the relocation of U.S. Highway 89 from Weber Canyon through South Ogden along its present alignment, and the replacement of the old truss bridge with a reinforced concrete structure across the Ogden River at Washington Avenue.17 In early in this growth period, a bridge bond issue was passed in the city of Ogden for construction of a new bridge on Washington Avenue. It was not until however, that a decision was made to actually construct the new bridge.

The first note of construction interest was in an Ogden City Commission meeting on May 26, when the commission passed a resolution to move the in the Bridge Bond Fund to the Ogden City general fund 60 to 90 days in advance of the anticipated construction.18 This meeting was followed by the presentation of plans and specifications for the Ogden River Bridge to the city commission by the city engineer, Joseph M. Tracy, on July 17, Tracy specified that the bridge Ogden River Bridge HAER No. UT-62 (Page 4) would be a reinforced concrete bridge comprising a total span of 122 feet 4 inches, with two 20- foot sidewalls and a 78-foot roadway, and would accommodate two street railway tracks. Also to be included in this solicitation was the removal of the old steel truss bridge from this location.

This plan was unanimously carried by the board of commissioners, and bids were solicited between July 18 through July 23, The lowest bid of was presented by the Union Construction Company on their alternate design.20 The city engineer recommended that the Union Construction Company's bid of which included the extra materials, be accepted by the city. The commissioners unanimously agreed and awarded the contract to the company.21 B. Construction Chronology The city of Ogden was very anxious to have the bridge construction completed within a period of 70 days.

So, even before the final contract agreements were completed, the Union Construction Company began hauling construction materials to the site in early August.22 By the middle of August, demolition of the old bridge was already well underway and construction was expected to be complete within 70 days.23 Late in September the board of city commissioners solicited and obtained bids concerning the transfer of the old steel truss bridge from Washington Avenue to the Wall Avenue crossing of the Ogden River.

This work was awarded to the Union Construction Company on September 22for$15,497.25.24 A progress report on bridge construction was carried in the Ogden Standard Examiner on September 29, According to the article, unrestricted vehicular and streetcar traffic would be able to proceed across the west portion of the new bridge within 30 days.25 No other reports of construction progress were made during October and November, although one newspaper article reported that three workmen on the bridge were hit and injured by a passing streetcar in mid-November.26 In early December, it was announced that the new concrete bridge over the Ogden River was to be open for public use by January 1, at the latest.27 An article in the Standard Examiner, dated December 16, noted that the bridge construction was complete, except for paving of the east side.

Traffic was expected to be allowed by the bridge by Christmas.28In late December, severe weather hit northern Utah, ushering in a very cold and wet winter. This temporarily halted bridge completion, but it was expected to resume as soon as the weather moderated.29 The weather did not improved as expected, further delaying the paving of the east side of the bridge.30 By mid-February, it became apparent that the only practical solution to the construction problem was to open the entire bridge to traffic and pave the east side in the Spring.31 There is no indication that a dedication of the bridge ever took place. Final paving of the east portion of the bridge apparently was done in late March or early April, since the seventh and Ogden River Bridge HAER No.

UT-62 (Page 5) final payment for bridge work was paid to the Union Construction Company on April 22, atacostof$4,099.64.32 C. Location The bridge, with its decorative sign, has always been and continues to be a vital link in the transportation network of northern Utah. The bridge initially served as the only reliable access for road travelers going from Ogden and points south to anywhere north of the city, including Box Elder County and Idaho. It maintained this vital importance from territorial days, up until about the beginning of World War II. When Hill Field (later to become Hill Air Force Base) was constructed in the late and early a new route was established from Layton, north along the present route of Highway SR to Hot Springs, north of Ogden.

This route allowed truck and other through traffic to avoid passing through the center of Ogden. When the Interstate 15 route was completed through the city in the early and a decision was made to divert truck traffic west to Wall Avenue, that too decreased through traffic volumes on Washington Boulevard. Interstate 84, completed in from the mouth of Weber Canyon to Riverdale, also diverted traffic from Wyoming off U.S. 89 and onto Interstate 15. Nevertheless, traffic volume on the route and over the bridge has continued to increase every year. II. THE BRIDGE A.

Description The 67-year-old Ogden River Bridge on Washington Boulevard runs north-south over the west- flowing Ogden River.33 As designed and represented in five sheets of construction drawings prepared in the bridge is a five-span, steel reinforced, poured concrete structure, parallelogram-shaped in plan, and measuring 123 feet 9 inches in length and width.34 The bridge's vertical, load-bearing superstructure consists of 12- to 14-feet-tall concrete abutments on each end, with four bullnose-edged piers situated in between, creating spans of 22 feet 6 inches, 25 feet 9 inches, 25 feet 9 inches, 25 feet 9 inches; and 22 feet 6 inches, respectively, measured to the centerline of each pier from the north and south abutments.

The abutments sit upon rock masonry revetments or walls which extend along the bank 25 feet from the southwest, northwest and northeast wing. A concrete revetment extends 65 feet along the bank from the southeast wing. The bridge's horizontal superstructure consists of concrete T- beams, ranging from 3 feet 8 inches to 8 feet on center, running east to west across the piers. The beams range from 14 feet to 19 feet in width and 20 feet to 28 feet in height and are chamfered along their bottom edges. The bridge has a slight chamber or bow along its length and has a deck or vehicle-driving surface of concrete topped with bituminous overlay. The original decking has been resurfaced with asphalt overlay over the years.

Along the east and west sides of the bridge are concrete sidewalks and railing. The steel-reinforced railing consists of roughly 4-inch-wide concrete "posts" at each end and over each pier, with lengths of round-arched balusters in between. Ogden River Bridge HAER No. UT-62 (Page 6) Above the balusters is a wide concrete rail, and below a chamfered concrete curb. All concrete work is smooth-finished, although the form-lines are exposed on the surfaces of the concrete superstructure. Although built in the bridge is quite modern in appearance, especially its superstructure. It is of no practical architectural style, having been built in the transitional period between the Neo-Classical Revival and Art-Deco styles.

Still, the bridge has some cracking, spalling, and scouring, and there are some stains on the underside of the deck. The pedestrian rails are quite deteriorated in places, with some section broken out. The reinforcing steel is also exposed in places. B. Bridge Modifications Some minor remedial repair work has been done on the bridge over the years, but no major structural modifications or repairs appear to have been undertaken since its construction. There have been, however, several deletions of original elements of the bridge over time, in addition to the loss of the double track streetcar line which once crossed the bridge.

The four, single-ole, three-globe street lights, which once flanked the edges of the bridge pavement, were removed at some point after the early There are currently no street lights on the bridge itself other than the neon sign. One other minor modification was a crosswalk which was placed in the middle of the bridge during the late to early Two small metal signs were hung above the crosswalk from the bottom of the Ogden sign (between the *0* and 'G' and the *E* and *N* in the word OGDEN) to warn motorists of the crossing. This crosswalk and the sign had been removed by the C. Ownership and Future The city of Ogden paid to have the Ogden River Bridge built and, presumably, owned the bridge for a period of time following its construction.

At some point after that time, possibly during the early when Utah State Road Commission maintenance records on the bridge first appeared, bridge ownership reverted to the state and has remained with it since that time. The Ogden River Bridge carries a large volume of traffic and represents a vital part of the most important surface road in Ogden. Thousands of vehicles daily cross the structure, so its maintenance and continued upgrading are an important part of overall transportation planning for the Ogden area. Due to continuing deterioration of the bridge, and the fact that it is not as wide as the boulevard, continued use of the existing bridge was not considered possible.

In the Federal Highway Administration's "Determination of Eligibility and Finding of Effect" for the Ogden River Bridge, it was recommended that preservation through HAER documentation, demolition and construction of a new bridge be undertaken.35 Ogden River Bridge HAER No. UT-62 (Page 7) III. BRIDGE BIOGRAPHICAL MATERIAL A. Engineering and Design The design for the Ogden River Bridge was a product of the Ogden city engineer's office. Both the original plans and the modified design, which were used in construction, list "F. Berne" as the designer. "F. Berne", or Fred Berne, was a fairly well-known contractor of the time, though it is not known whether he was a staff member of the city engineer's office or a subconsultant.

Berne arrived in Utah around and died of heart trouble on December 23, during the final construction phase of the Ogden River Bridge.36 According to his obituary, Berne was a well-educated, creative contractor and designer. He was born in France in and graduated from the School of Arts at Chaions. After working on several construction projects in Europe, Berne came to the United States in and, as a contractor, built a number of large buildings in Georgia, Pennsylvania, Maryland, and Washington. Most significantly, he designed and patented a concrete construction design which made steel reinforcements less expensive and better.

He came to Ogden in and, among other buildings, constructed the Egyptian Theatre.37 Berne's well-known experience with reinforced concrete structures made him an attractive candidate to design such a massive structure as the Ogden River Bridge. B. Contractor The bridge was built by the Union Construction Company of Ogden, which was formed in This construction company was composed entirely of local Ogden businessmen. Principals of the company in included W. Earl Roche, general manager and president; William H. Taylor, vice president; and Joseph Ririe, secretary-treasurer.38 In Roche moved to Oakland, California.39 In the Polk Directory for Ogden, William H.

Child had assumed the presidency, with Taylor as vice president and general manager, and Ririe remaining secretary- treasurer.* This remained constant until Taylor assumed the presidency of the company after Child's death in Ririe remained secretary-treasured until his death in The company appears to have ceased operations in Interestingly, Child was a well-known brick and tile manufacturer for thirty-five years in the intermountain area before assuming control of the Union Construction Company. Ririe was the Utah State auditor from to and state treasurer from until his death in The Union Construction Company had a strong achievement record from early in its existence.

Many construction projects in Ogden and Weber County were conducted by this company during and These included resurfacing of the state road between Clearfield and Layton, building the Riverdale viaduct, building the Ogden River Bridge, and moving the iron bridge from Washington to Wall avenue.45 In later years, the company apparently continued to do federal highway construction work, but did much of it in Idaho, particularly between Salmon And the Idaho-Montana state line.46 A search for other bridge construction projects by the company was not fruitful. The company did construct the Riverdale viaduct over the Weber River in and relocated the iron truss bridge over the Ogden River from Washington Avenue to Wall Avenue in the same year.

However, the company's involvement in other bridge construction projects after that time is not known. HAER No. UT-62 (page 8 ) Photographic copy of photograph (ca. original print in possession of Utah Department of Transportation, District One, Ogden, Utah). Ogden River Bridge; view to northeast. Ogden River Bridge HAER No. UT-62 (page 9 ) IV. ENDNOTES 1. Laws and Ordinances of the State ofDeseret, compilation of (Salt Lake City, Utah: 2. Roberts, Richard C. and Richard W. Sadler, Ogden: Junction City (North- ridge, California: Windsor Publications, Inc., 56 and 59; Ogden City Commission, Minute Book, 3. Utah State Road Commission, State Road Map of Utah (Salt Lake City: State of Utah, 4. Milton R.

Hunter, compiler and editor, Beneath Ben Lomond's Peak: A History of Weber County Second Edition (Salt Lake City: The Deseret News Press, 5. Ibid., 6. Ibid., 7. Ezra L. Knowlton, History of Highway Development in Utah (Salt Lake City: Utah State Road Commission, 60. 8. Hunter, Beneath Ben Lomond's Peak: A History of Weber County 9. Roberts and Sadler, Ogden: Junction City, 56. 10. Ibid., 59. 11. The Standard, 21 June 6. 12. Ogden City Commission Minutes, Book H, 13. The Standard, June 26, 1. 14. Ogden City Engineer's office, Drawing no. traced (Ogden, Utah: Ogden City, One large format photograph of this drawing is attached as part of this documentation. 15. William W. Terry, Weber County is Worth Knowing (Ogden, Utah: privately published), D. W.

"Red" McCarthy, personal communication, Utah Historical Records Project, A History of Ogden (Ogden, Utah: Ogden City Commission), 58; The Ogden Standard Examiner, 13 November 7A. 16. Roberts and Sadler. Ogden, Utah: Junction City, 114 and 17. The Ogden Standard Examiner, 31 January 8; Ibid., 11 October 8. 18. Ogden City Commission Minutes, Book Fl, Ogden River Bridge HAER No. UT-62 (page 10) 19. Ibid., 20. Ibid., 21. Ogden City Corporation, "Advertisement, Instructions to Bidders, Proposal, Specifications, Contract and Bond for Bridge over Ogden River at ^shington Avenue" (Ogden, Utah: Office of the city engineer, 17 July 22. Ibid., 11 August 1. 23. Ibid., 22 August 6. 24. Ibid., 30 September 1. 25. Ibid., 29 September 6. 26. Ibid., 16 November 9. 27. Ibid., 3 December 12. 28.

Ibid., 16 December 12. 29. Ibid., 23 December 5. 30. Ibid., 4 January 8. 31. Ibid., 18 February 10. 32. Ogden City Commission, Minute Book, 33. The bridge is portrayed in nine large format photographs and one photographic copy of a ca. photograph which are included as part of this documentation. 34. Much of the information on the structural aspects of this bridge come from the original plans for the bridge and from the bridge inspection file. Original plans for the bridge are located at the Ogden City Engineer's office under Drawing nos. and Four large format photographs of these drawings are included as part of this documentation.

Following are the refer- ences for these two sources of information: Structures Department, Inspection File for Ogden River Bridge, Utah Department of Transportation, District One, Ogden; Engineer's Office, "Ogden River Bridge at W&shington Ave., Submitted by Union Construction Co, Adopted Design. Drawing Numbers Ogden City, Ogden, 35. Federal Highway Administration and Utah Department of Transportation, "Determination of Eligibility and Finding of Effect for Project No. Ogden River Bridge Replacement (Salt Lake City, Utah: Utah Historic Preservation Office, 12 September R. L. Polk, R. L. Polk & Co's Utah State Gazatteer (Salt Lake City, Utah: R. L. Polk & Co. of Utah, 36. The Ogden Standard Examiner, 24 December 3. Ogden River Bridge HAER No. UT-62 (page if) 37. Ibid. 38. R. L. Polk, R.

L. Polk & Co's Ogden City Directory (Salt Lake City, Utah: R. L. Polk & Co. of Utah, 39. Ibid. 40. Ibid. 41. The Ogden Standard Examiner, 27 October 1. 42. The Ogden Standard Examiner, 10 July 1. 43. Polk, R. L. Polk & Go's Ogden City Directory. 44. The Ogden Standard Examiner, 10 July 1. 45. Ibid., 1 February 14. 46. Ibid., 27 October 1. V . BIBLIOGRAPHY A. BOOKS AND PUBLISHED

Sources

Hunter, Milton R., compiler and editor. Beneath Ben Lomond's Peak: A History ofVkber County Second Edition. Salt Lake City, Utah: The Deseret News Press, Knowlton, Ezra C. History of Highway Development in Utah. Salt Lake City: Utah State Department of Highways, Laws and Ordinances of the State of Deseret. Compilation of Salt Lake City, Utah, R. L. Polk & Co's Ogden City Directory. Salt Lake City, Utah: R. L. Polk & Co. of Utah, R. L. Polk & Co's Ogden City Directory. Salt Lake City, Utah: R. L. Polk & Co. of Utah, R. L. Polk & Co's Ogden City Directory. Salt Lake City, Utah: R. L. Polk & Co. of Utah, R. L. Polk & Co's Ogden City Directory. Salt Lake City: R. L. Polk & Co. of Utah, Ogden River Bridge HAER No. UT-62 (page 12) Roberts, Richard C. and Richard W. Sadler. Ogden: Junction City.

North- ridge, California: Windsor Publications, Inc., Terry, William W. Wkber County is Vforth Knowing. Ogden, Utah: Privately published, B. NEWSPAPERS Ogden Standard Examiner. "Get Ready to Build New Ogden Bridge", 11 August p. l,col. 2. "City to Open River Street", 22 August p. 6, col. 2. "Bridge Lights Will Go Soon", 29 September p. 6, col. 4. "Union Given Bridge Work", 30 September p. 1, col. 4. 16 November p. 9, col. 5. "Bridge will be Open Jan. 1", 3 December p. 12, col. 5. "Iron Bridge Almost Ready", 16 December p. 5, col. 1. "Defer Plans for Bridge Dedication", 23 December p. 12, col. 5. "Berne Rites Next Friday", 24 December p. 3, col. 4. "Storm Hinders New Bridge Work", 4 January p. 8, col. 3. "Road Work to Open in Spring", 31 January p. 8, col. 6.

"New Record in Paving Set", 1 February p. 14, col. 1. "New Bridge Open for Full Width", 18 February p. 10, col. 4. H. Child of Ogden Expires of Pneumonia", 27 October p. 1, col. 8. Ogden Standard Examiner. "Cold Fatal to Joseph Ririe", 10 July p. 1, col. 7. Standard (Ogden), [City Council Minutes!, 21 June p. 6, col. 1 and 2. . "The New Iron Bridge", 26 June p. 1, col. 7. Ugden River Bridge HAER No. UT-62 (page 13) C. DOCUMENTS AND REPORTS Federal Highway Administration and Utah Department of Transportation. "Determination of Eligibility and finding of Effect for Project No. Ogden River Bridge Replacement", 12 September Utah Historic Preserva- tion Office, Salt Lake City. Ogden City Commission Minute Book H. 1 July p. 619 and Ogden City Commission Minute Book Fl. 26 May p. . 31 July p.

508 and . 11 August p. Ogden City Commission Minute Book, 22 April p. Ogden City Engineer's office. "Advertisement, Instructions to Bidders, Proposal, Specifications, Contract and Bond for Bridge Over Ogden River at Washington Avenue", 17 July Utah State Archives, Salt Lake City. D. PERSONAL COMMUNICATIONS Young, Michael. Personal communication, [This was a telephone conver- sation between the author and Mr. Young who is president of Young Electric Sign Company and grandson of its founder, Thomas Young.] E. MAPS/DRAWINGS Utah State Road Commission. State Road Map of Utah. Salt Lake City, Utah, Ogden City. "Steel Bridge over Ogden River at Washington Avenue, Drawing No. Traced by A. H. Shaw, February 13, Ogden City Engineering Department, Ogden, Utah.

[The "At ^fcshington Avenue, is crossed out and "Moved to Avenue" is penciled in.] Ogden City. "Ogden River Bridge at Washington Avenue", Submitted by Union Construction Company, Adopted Design. Drawings No. Ogden City Engineers office, Ogden, Utah, August

In context

Ogden, Utah The place record: every map, photograph and survey of this town.
Weber County, Utah 88 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Ogden

11 records

The federal surveyors worked through Ogden building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Union Stock YardHALS UT-516,356 words
Ogden Canyon ConduitHAER UTAH,29-OGCA,2-6,015 words
Odgen River BridgeHAER UT,29-OGDEN,4A-3,499 words
Miles Goodyear CabinHABS UTAH,29-OGDEN,2-1,762 words
Fairmont BridgeHAER UTAH,29-OGCA,1-1,687 words
Lewis BuildingHABS UTAH,29-OGDEN,3-726 words
Union Pacific RailroadHAER UTAH,29-OGDEN,1-39 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AU-no text held
Ogden ArsenalHAER UTAH,6-LAY.V,1AR-no text held
Ogden ArsenalHAER UTAH,6-LAY.V,1AS-no text held
Ogden ArsenalHAER UTAH,6-LAY.V,1AT-no text held

Provenance

  • Written history. Quoted verbatim from HAER UT,29-OGDEN,4-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.