BlockBefore

High Mountain Dams in Upalco Unit, Water Lily Lake Dam, Ashley National Forest, 1.1 miles Northeast of Swift Creek Campground, Mountain Home

High Mountain Dams in Upalco Unit, Water Lily Lake Dam, Ashley National Forest, 1.1 miles Northeast of Swift Creek Campground, Mountain Home, Duchesne County, UT. Surveyed as HAER UTAH,7-MOHO.V,1-N-, with a 561-word written history.

From the record

“The Water Lily Lake Dam is the oldest manmade structure to reservoir a natural lake in the Swift Creek drainage.”

Written record, HAER UTAH,7-MOHO.V,1-N- survey. Machine-read text.

Surveyed by the federal HAER program as HAER UTAH,7-MOHO.V,1-N- · the record runs 561 words · one of 28 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

441 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER UTAH,7-MOHO.V,1-N-. Not written, edited or summarised by this site.

The Water Lily Lake Dam is the oldest manmade structure to reservoir a natural lake in the Swift Creek drainage. With a crest length of 64 feet, it is the smallest of the dams in the Upalco Unit of the Central Utah Project. The reservoir was never a water storage success and has reverted to near a natural state. Long left unused, the dam on Water Lily Lake has deteriorated significantly and no longer functions to impound water for active storage. Inventoried by: Clayton Fraser and James Jurale Fraserdesign Loveland, Colorado October 19, High Mountain Dams in Upalco Unit, Water Lily Lake Dam HAER No. UT-42-N (Page 2)

Historical Information

Located at the head of a smail creek at an altitude of approximately feet, Water Lily Lake is the lowest of the impounded lakes in the Swift Creek drainage. Its outlet tumbles down feet of descent to Swift Creek about one-half mile north of its confluence with the Yellowstone River. On January 25, the Farmers Irrigation Company filed for irrigation water storage rights totalling 723 acre-feet from Water Lily Lake. The permit was approved by the State Engineer the following April, but the National Forest Service had already granted a special use permit to build a dam in November By the company had completed the small-scale earth-fill dam over the outlet at the south point of the lake. Fed by an extremely small drainage area, Water Lily was limited in its active storage capacity.

It was reported unused in and again in Today, the lake is drained by a 24-inch-diameter concrete outlet pipe with an upright (and inoperable) upright headgate. The dam is choked with debris by beavers, which have repaired a partial breach in the wall. It is proposed that the breach be further repaired and the outlet blocked to return the lake to its natural state.

Architectural Information

Dam length: 64 feet Dam height: 10 feet Dam width: 4 feet Construct: Earth fill dam with stone riprap facing Lake size: acres; 470 acre-foot maximum capacity; 3 vertical foot maximum drawdown Outlet: Gated pipe BIOGRAPHICAL INFORMATION "Preliminary Engineering Report: Stabilization of High Mountain Lakes, Upalco Unit" National Forest Service Report, William F. Gettleman, "Report on the Lakes and Reservoir of the Headwaters of the Uintah, Whiterocks and Lakefork Rivers, Uintah Project, Utah: Feb. page 24. Water Lily Lake Reservoir File Roosevelt District Ranger Office, Ashley National Forest, Roosevelt, Utah Field inspection by Robert Righter, July 27, For additional information, see Irrigation Canals in the Uinta Basin, HAER No. UT-30.

High Mountain Dams in Upalco Unit, Water Lily Lake Dam HAER No. UT-42-N (Page 3) pSAWPOWN DAM 5CALCS i" = CaOOX

In context

Mountain Home, Utah The place record: every map, photograph and survey of this town.
Duchesne County, Utah 77 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Mountain Home

15 records

The federal surveyors worked through Mountain Home building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-1,736 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-C-591 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-F-560 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-H-527 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-G-526 words
High Mountain Dams in Upaco UnitHAER UTAH,7-MOHO.V,I-L-517 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-E-514 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-K-513 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-O-493 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-M-492 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-J-491 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-A-487 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,-1-I-474 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-D-472 words
High Mountain Dams in Upalco UnitHAER UTAH,7-MOHO.V,1-B433 words

Provenance

  • Written history. Quoted verbatim from HAER UTAH,7-MOHO.V,1-N-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.