Lost Creek Road Bridge, Spanning Sevier River at County Road 243, 2 miles east of Aurora, Aurora

Lost Creek Road Bridge, Spanning Sevier River at County Road 243, 2 miles east of Aurora, Aurora, Sevier County, UT. Surveyed as HAER UTAH,21-AURO.V,1-, with a 1,878-word written history.

From the record

“The Lost Creek Bridge is a timber stringer type, with cribbed timber abutments.”

Written record, HAER UTAH,21-AURO.V,1- survey. Machine-read text.

Surveyed by the federal HAER program as HAER UTAH,21-AURO.V,1- · the record runs 1878 words · one of 2 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Written history

1738 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER UTAH,21-AURO.V,1-. Not written, edited or summarised by this site.

Loma Billat, JBR Environmental Consultants, Inc., May Lost Creek Road Bridge HAER No. UT-86 (Page 2) n. HISTORY A.

Need for the Bridge

The town of Aurora is located in a small valley between the Pavant Range and the Sevier Plateau in Sevier County, Utah. It is approximately 14 miles northeast of the town of Richfield and about four miles southwest of Salina. The Sevier River traverses through this valley. Aurora was settled in by Mormon pioneers. It began and continues to be a community built on agriculture. The town was originally named Willow Bend because of its location on the Sevier River which was overgrown with willow trees1. It was changed to Aurora when the town applied for a Post. Office in The first co-op was built by the townspeople in Before that the community relied on homemade goods or had to travel to other towns to get supplies.

In addition, the arable locations for crops and livestock grazing were on both sides of the Sevier River. It became apparent that a means of crossing the river was necessary to access the areas and to transport the crops. In the Denver and Rio Grande Railroad came through the area bringing and distributing goods, and access across the river was necessary to utilize the railroad system3. The town of Aurora was incorporated in Lost Creek Road Bridge HAER No. UT-86 (Page 3) Following incorporation it appears that the town of Aurora started to flourish somewhat economicallly. Several businesses including four stores and a cafe were operating in town in Another store, the Sorensen Mercantile was completed in as well.

A garage and service station were operating in Aurora in and Another garage built in was sold and turned into a grocery store in Ice cream and candy were sold at the "Sweet Shop" in Aurora, in A sandwich shop and a cafe were open for business in and A barber shop was also in operation starting in the early A local builder and contractor in Aurora started a lumber business in In white clay was discovered northwest of town. Western Clay and Metals Company built a mill where the clay was dried, crushed, and bagged. The clay was utilized in refining oil. This provided employment for many living in the community.

Another economic development in the community was the construction of a cheese factory by the Nelson-Ricks Creamery Company in This provided a strong interest in the dairy business, which conveniently coincided with the agricultural ventures in the area. The construction of Lost Creek Road Bridge HAER No. UT-86 (Page 4) a bridge would greatly benefit the transport of the clay and the dairy products to the railroad5. B.

Construction Chronology

The first bridge constructed for the town of Aurora was built in the In these early years, territorial and county roads were financed through poll taxes and tolls. Poll taxes required one day of labor or per year from all able-bodied males of a certain age. In the poll tax law in Utah was changed to two days labor per year or per day in lieu of that7. Tolls were instituted to pay for maintenance on wagon roads and keep the necessary structures over streams passable. Knowlton acknowledged "this type of financing {was} very satisfactory for short sections of highway which involve primarily bridges, tunnels, or ferries."8 Railroad transportation was available in the area in when the Denver and Rio Grande Railroad was constructed through the valley.

This cut down on the need for road maintenance between many towns. As a result of the increased utilization of the railroad system, the funding provided by the state for inter-community roads was greatly reduced. Therefore, rural community road maintenance became strictly a county and/or city concern9. Lost Creek Road Bridge HAER No. UT-86 (Page 5) The State Road Commission was created in At that time, Sevier County roads were maintained mostly by the county. Only three small segments of state road were present in Sevier County. In the Bridge Department of the State Road Commision requested bids and awarded contracts for several small bridges in Sevier County10. The economy of Sevier County began and continues to be based on agriculture.

In a census of economic activities for fifty percent of the population was employed in agriculture. Rural roads are an integral part of the agricultural community providing links between the farm fields, settlements, and distribution lines. In the early to mid-1930s, federal work relief programs provided the labor for numerous engineering projects across the nation. Although unsubstantiated, it is within the realm of possibilities that this bridge was a Civilian Conservation Corps or Works Progress Administration (WPA) project. The suggestion that it could have been a CCC or WPA project was made by Mr. Gaylen Rappeleye, Sevier County Road Supervisor. There is no primary source for this suggestion.

There were at least two CCC camps in the Salina area from through Although no specific building projects were described for the Aurora area, Lost Creek Road Bridge HAER No. UT-86 (Page 6) bridges were one of the main types of structures built and maintained by the CCCU. The estimated construction date for the Lost Creek Road Bridge is which falls well within the CCC and WPA activity periods12. Road improvements on the Salina-Scipio road which passes through Aurora were noted as commencing in the fall of A local road contractor, Leland A. Young, was noted as the low bidder on a bridge contract over the Sevier River near Salina in It is possible that either of these construction projects refer to the Lost Creek Road Bridge. C.

LOCATION The bridge spans the Sevier River along Lost Creek Road (County Road in Sevier County (Figure 1). It is about four miles southwest of Salina, two miles east of the town of Aurora, and east of the Denver and Rio Grande Railroad tracks. The bridge provides access to arable lands on both sides of the Sevier River. Lost Creek Road Bridge HAER No. UT-86 (Page 7) ID. THE BRIDGE A.

Description

The Lost Creek Road Bridge was built around an estimate provided by the UDOT structure inventory and appraisal sheet and the Utah Historic Bridge Inventory record15. It crosses the Sevier River with a span of 33 feet (single span) and is 20 feet wide. TTie abutments are constructed of notched log cribbing with rock fill. The cribbing is eleven courses high with six timbers running perpendicular to the stringers and five running parallel. Stream cobbles have been placed between timbers for added support. Stringers were used to connect the abutments and comprise the superstructure of the bridge. There are 11 stringers across the 20 foot width. These stringers measure 12 inches by 16 inches indicating the bridge was constructed post-193016. The wood deck is laid upon the stringer base.

The bridge has two wooden double-rail guardrails flanking either side of it. The rail posts have been bolted to the outer stringers. The rails have been notched into the rail posts and nailed. The wood deck of the bridge has been covered with dirt. Timber was an ideal construction material for numerous reasons. Wood is an abundant and renewable resource that is relatively easy to procure. Lost Creek Road Bridge HAER No. UT-86 (Page 8) Initial cost and maintenance are lower than that of other, less accessible materials (i.e. steel). Further, a timber bridge can be constructed in any weather and is not damaged by continuous freeze and thaw,17 an important consideration in Utah. Little skilled labor is necessary to construct a timber bridge. B.

MODIFICATIONS The bridge deck planks and timber stringers have been replaced periodically which is a normal and required part of maintenance18. The construction materials and techniques used in this maintenance have been consistent with the original bridge design and workmanship. The log cribbing abutments have not been replaced and are original construction. C.

Ownership and Future

The Lost Creek Road Bridge was built, owned, and continues to be maintained by the County of Sevier. Recent study of the bridge indicated limitations in handling projected traffic volumes and loads in the years ahead. It was deemed necessary to replace the bridge in order to handle forthcoming use. Lost Creek Road Bridge HAERNo.UT-86 (Page 9) IV. FOOTNOTES 1. Van Cott, John W., Utah Place Names, p. 16. 2. Warnock, Ivan L., Thru the Years, p. 3. Warnock, Ivan L., Thru the Years, p. 4. The Richfield Reaper, 3 October 5. Warnock, Ivan L., Thru the Years, p. 6. The Richfield Reaper, 3 October 7. Knowlton, Ezra C, History of Highway Development in Utah, p. 21. 8. Knowlton, Ezra C, History of Highway Development in Utah, p. 23. 9. Knowlton, Ezra C, History of Highway Development in Utah, p.

78 10. Knowlton, Ezra C, History of Highway Development in Utah, p. 11. Baldridge, Kenneth W., Nine Years of Achievement: The Civilian Conservation Corps in Utah, p. 12. Poll, Richard D., Utah's History, p. 13. The Richfield Reaper, 16 August 14. The Richfield Reaper, 31 May 15. FraserDesign, Utah Historic Bridge Inventory. 16. Axline. Jon. Monuments Above the Water: Montana's Historic Highway Bridges. p. 27. 17. Ou, Fong L. and Clyde Weller, An Overview of Timber Bridges, p. 1. 18. Hughes, Charles E. and Asa S. Nielson, A Cultural/Paleontological Resource Inventory of the Proposed Lost Creek Road Bridge Replacement Project Over the Sevier River Near Aurora. Sevier County. Utah, p. 5. Lost Creek Road Bridge HAER No. UT-86 (Page 10) V. BIBLIOGRAPHY A.

BOOKS Baldridge, Kenneth W., Nine Years of Achievement: The Civilian Conservation Corps in Utah. Unpublished doctoral dissertation, Department of History, Brigham Young University, Prove Knowlton, Ezra C, History of Highway Development in Utah. Salt Lake City, Utah, Poll, Richard D. (editor), Utah's History. Logan, Utah State University Press, Van Cott, John W., Utah Place Names. Salt Lake City, University of Utah Press, Warnock, Irvin L. (editor), Thru the Years. Springville, Art City Publishing Co.. B. PERIODICALS Ou, Fong L., and Clyde Weller, An Overview of Timber Bridges, in Timber Bridges, Transportation Research Record Washington Transportation Research Board National Research Council, C.

NEWSPAPERS The Richfield Reaper, 31 May The Richfield Reaper, 16 August The Richfield Reaper, 3 October Lost Creek Road Bridge HAER No. UT-86 Page 11 LOST CREEK ROAD BRIDGE SPANNING THE SEVIER RIVER NEAR AURORA, UTAH FIGURE 1 BRIDGE LOCATION t jbr m envtr environmental npnauttants. Inc. City, Utah C*dor Cily, ut *o. H *OOO Oho. Ni

In context

Aurora, Utah The place record: every map, photograph and survey of this town.
Sevier County, Utah 87 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Sevier County

1 record

The federal survey recorded these other structures elsewhere in Sevier County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Nebeker Lane BridgeHAER UTAH,21-ANNA.V,1-1,839 words

Provenance

  • Written history. Quoted verbatim from HAER UTAH,21-AURO.V,1-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.