The Esquire Theater, built in was designed by William B. David, a prominent theater architect in northern California. It was owned by Blumenfeld Theater Circuit, a once thriving theater venture that ran several theaters in Sacramento and throughout the bay area. The integrity of the Modeme styling and materials of the front facade with marquee, grand entry lobby, tower and sign make this theater a representative example of popular theater style of the late and early The Esquire is one of the very few remaining examples of the pre-1950s commercial architecture that once dominated the streetscape of K Street's block.
Esquire Theater
Sacramento, California HABS No. CA-2674 Page 2 PART
Historical Information
Physical History: 1. Date of Erection: Original architectural plans were created by William B. David circa Construction of the theater was completed in early March (David The Esquire's grand opening date was March 15, 1940-(Riter 1940:E-2). 2. Architect: William B. David, a San Francisco architect noted for designing numerous movie theaters in northern California, was hired by the Blumenfeld Theater Circuit to design the Esquire Theater (Riter 1940:E-2). 3. Original Owners: Joe Blumenfeld and D. J. McNerney of the San Francisco- based Blumenfeld Theater Circuit were the original owners of the Esquire Theater (Riter 1940:E-2, E-4). 4. Builder, Contractor, Supplier: Moore & Roberts, a San Francisco-based general contracting firm, headed the construction of the Esquire Theater.
As instructed, Moore & Roberts hired predominantly Sacramento-based subcontractors, materials suppliers and laborers for the project (Riter 1940:E-4). 5. Original Plans and Construction: Original ink-on-linen or other plans for this building were not located. Photocopies were located at Carissimi Rhorer Associates of Sacramento, California. Construction costs for the theater equaled of the Blumenfeld Theater Circuit's total investment of in the theater project (David Riter 1940:E-2). 6. Alterations/Additions: Prior to the remodeling, the glass block ticket booth and the original lobby doors were removed. The lobby doors were replaced with four sets of glazed double-doors.
The Esquire building was extensively altered in to accommodate the needs of the State of California, Department of Health Services. This rehabilitation effort reconfigured the entire theater floor plan to include 3 full floors of office space. The lobby doors were again replaced with three sets of full-length double windows and one glazed entry door with sidelight. The neon letters set into a recess at the front (south) facade were removed; the letters were reset on the marquee, and the recessed area was replaced with concrete infill construction. A louvered window at the south (front) facade and doors/doorways at the north, west, and east exterior walls were removed and replaced with concrete infill construction. Windows were added to the north and west sides of the building at this time.
ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 3 Historical Context: The Esquire Theater, completed in was an integral part of downtown Sacramento's block on K Street. This city block had made a drastic visual change from distinctly residential in the late to entirely commercial by the mid (Sanborn-Perris Map Company Sanborn Map Company. The Esquire Theater's location was expected to play a big role in extending Sacramento's commercial district eastward by increasing pedestrian visitors to neighboring establishments and, also, by generating the opening of new businesses in the area (Riter 1940:E-7).
The Blumenfeld Theater Circuit invested a total of in the creation of this theater, encouraged by the success of two theaters the company already owned in downtown Sacramento; the Sierra and the Tower theaters (Riter E-4). The Blumenfeld Theater Circuit was a San Francisco-based company that had its start with original owner Max Blumenfeld's purchase of the Victory Theater in Sacramento. Max handed control of the company over to his two sons, Joe and Abe, in Joe Blumenfeld, along with a partner, Joe McNerny, owned the Esquire Theater. By time the Esquire was completed in March Blumenfeld Theater Circuit ran 25 theaters in Northern California (Riter 1940:E-4).
By the mid-1940s the company owned numerous movie theaters in Sacramento and vicinity including the Esquire, Tower, Grand, Times and Drive-in theaters (Sacramento Bee Sept. 13 and 14, William B. David, a San Francisco based architect, was hired by Blumenfeld Theater Circuit to design and supervise the construction of the Esquire Theater. Before his work on the Esquire, David had been noted for acting as architectural supervisor for other California theaters in such areas as Woodland, El Cerrito, Eureka, Gridley and Aresta. He had previously been hired by Blumenfeld Theater Circuit to supervise the building of the Tower Theater on Street and Broadway in Sacramento, a structure that was completed in (Riter 1940:E-4).
David's architectural practice has been noted for designing at least 182 theaters in northern California (David The general contracting firm chosen for the Esquire Theater project, Moore & Roberts of San Francisco, was directed to hire as many Sacramento-based subcontractors and materials suppliers as feasible (Riter 1940:E-4). As a result, many Sacramento companies were employed by the Esquire Theater project. These included Sacramento Rock and Sand Company for concrete and plaster material, Thomas F. Scollan Company for plaster work, Diamond Match Company for lumber, Moore & Garlick for mill work, J. H.
Mendenhall for sheet metal work, Valley Terrazzo Company for terrazzo flooring, Acme Roofing Company for roofing material and insulation, Willy & Rhoads for plumbing, Palm Iron Works for steel work, and the Sacramento branches of York Ice Machinery for the heating and ventilating system and Electrical Products Corporation for the neon tower sign and marquee (Riter 1940:E- ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 4 2,E-4). All construction laborers for the project were hired from local building trade unions (Riter 1940:E-4). Outside companies were hired to furnish many decorative features and theater furnishing for the Esquire Theater. Ornamental metalwork, theater seats and stage drapes were supplied by San Francisco-based businesses (Riter1940:E-2).
Custom- made tiles for the front entry facade were supplied by Gladding McBean & Company of Lincoln, California, then one of the largest tile manufacturers in the world. A noted Pacific Coast theater decorator of the time, Miguel Santocono, was employed to supervise the decorating of the theater, including the completion of murals on the auditorium walls. Carpeting was designed and woven especially for the theater by a rug manufacturer from the east (Riter 1940:E-4). The completion of the Esquire Theater seems to have been a major event for the City of Sacramento considering the multi-page layout entitled the "Esquire Theater Edition" printed in the March 14, issue of The Sacramento Bee.
The articles focused on an array of subjects pertaining to the Esquire Theater itself, such as key figures associated with the theater and significant design elements of the building, as well as to the general state of movie theaters at that time (Riter The issue announced The Esquire's grand opening on March 15, at 5 PM. The headline movie being shown that night was a comedy entitled The Amazing Mr. Williams (Riter 1940:E-2). In the Esquire Theater was described as having a "functional modem" (sic) exterior design and as being "the last word in motion picture playhouse architecture." The vertical neon-lighted sign at the entry facade was said to reach a height of 90 feet and, in March was speculated to be the tallest such sign west of Chicago (Riter 1940:E-4).
The glass block tower, marquee, and neon lighting, as well as the ceramic tiles and terrazzo flooring that showcased the Esquire's red, buff and blue color scheme, all added to the grandness of the building.
Innovative elements of the time that were used in the theater included auditorium wall decorations completed in fluorescent paint and illuminated in the dark with black lights; stadium-type seating arrangements and fluted wall designs for good acoustics in the auditorium; a circular canopy proscenium at the stage area; the "finest and newest" sound equipment; the latest projection equipment in a soundproof, fireproof, air conditioned and "thoroughly" ventilated room; silhouette-type lettering on the marquee; fluorescent tube lighting fixtures; and colored fixtures in the restrooms (Riter 1940:E-2, E-4, E-5). Special attention was paid to providing the audience with a comfortable atmosphere.
Decorations, finishes, furniture and fixtures were chosen with the customer's visual pleasure in mind. Mechanically controlled heating, ventilating and ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 5 air-conditioning systems throughout the building maintained theater temperatures. The stage was wide and curved toward the audience for maximum visibility from every seat. The stadium-type design allowed every seat an unobstructed view of the screen. Each auditorium seat had 1.5 inch thick foam rubber cushions. The carpeting was laid over three-quarter inch padding to give a "luxurious feel." Furniture in the lobby, lounge and women's powder room was of Modeme design and had goat's hair covers. The women's powder room also included plate glass mirrored walls and a make-up table.
The lobby provided an electrically cooled drinking fountain (Riter 1940:E-2, E-4, E-7). George Ingham was the first manager of the Esquire Theater and his assistant was Jack McNerny, son of theater co-owner D. J. McNerny. Original theater operating hours were from 12 noon until midnight, and admission costs were 30 cents for matinees and 40 cents for evening shows (Riter 1940:E-2, E-4; The Sacramento Bee The Esquire Theater building's first floor plan also included two non-theater commercial spaces that flanked either side of the lobby and were entered from the K Street facade. Opening shortly after the theater was The Topper Bar, located in the east store of the Esquire Theater building.
The bar was originally owned by Leonard Giordano, and was in business at least into the (Riter 1940:E-7; Anonymous No information has been found regarding what business(es), if any, occupied the east store after the Topper bar closed until Some time after the east store was turned into an office space for the State of California, Department of Health Services (Dreyfuss & Blackford Architects An early business (possibly the first) to locate in the west store was Noack's Jewelers (Anonymous ca. This business remained here at least until the (Anonymous A restaurant is located in the west store today.
The Esquire Theater functioned as a movie theater until After the building was rehabilitated to accommodate three floors of office space for the State of California, Department of Health Services. Rehabilitation design services were rendered in late by Carissimi Rhorer Associates, Architects and Planners, Inc. of Sacramento (Carissimi Rhorer Associates ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 6 PART II. ARCHITECTURAL INFORMATION A. General Statement 1.
Architectural Character: The Esquire Theater is of concrete construction and was designed in the Modeme style, which was a popular style for theater design in the and The asymmetrical south (front) facade - the building's most distinctive extant feature - consists of a lower entry level with original marquee, ceramic tile wall surfaces, terrazzo floor, and formed wood doorway dividers, and has an upper portion marked by sculptural, curved concrete forms, decorative horizontal channel grooves and V grooves, and a tall glass block tower with a neon sign (CA- CA-2674-4, CA-2674-5). 2. Condition of Fabric: Although the theater building appears to be in excellent condition structurally, many of the building's original design elements have been compromised due to modem rehabilitation efforts.
The interior has been completely altered to create three levels of office space. Fenestration has been added at the north and west exterior walls. The south (front) facade has lost its original ticket booth, main entry doors and inset neon sign. B. Description of Exterior 1. Overall Dimensions: The footprint of the whole theater complex is symmetrical and loosely rectangular in shape, tapering inward 5 feet 4 inches on each side at the building's rear. The building is 80 feet long at its front (south) facade, 69 feet, 4 inches long at the north (rear) wall and 161 feet 1 + inches long at the sides (east and west walls). The large rear portion of the building, which is mainly the auditorium, maintains an elevation height of 43 feet to the top of the parapet.
The front portion of the building is stepped, having varied elevation heights of 46 feet, 51 feet, 6 inches, 58 feet, 3 inches, 55 feet, 3 inches, 48 feet and 43 feet (CA-2674-3). 2. Foundations: The theater structure was built on a foundation of reinforced concrete footings. Originally, concrete slab floors were supported on the footings. These concrete slab floors were below grade (basement/furnace room at the north end of the building), at grade, or above grade at varying heights, depending on the section of the building. Spaces between footings and above grade concrete flooring contained fill (David ca.1940).
After the building was altered to have a more level concrete slab foundation and the south basement/furnace room was closed off (Carrissimi Rhorer Associates ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 7 3. Walls: All exterior walls are of poured-in-place concrete built up between square concrete columns placed 21 feet on center. The west, north and east walls have exposed exterior form marks with a brush coated stucco finish (CA-2674-6). The south ends of the east and west concrete walls are lower in height and rounded at their terminals (CA-2674-4). The lower level of the south (front) facade is surfaced entirely in ceramic tiles (CA-2674-5). The six-inch by six-inch, six-inch by twelve-inch and three-inch by six-inch tiles are Chinese red (Riter E:2).
One-half-inch by six-inch ribbed tiles with blue and white glazing and one-and-a-half-inch by six-inch sculptural beveled tiles with blue gazing make up the horizontal banded decoration along the south (front) facade. The only untiled lower south (front) is the upper wall to the west of the east storefront door. The area is coated with cement plaster and is above a tile wainscot (CA-2674-9). The upper portion of the south (front) facade consists of large sculptural, curved forms constructed of poured-in-place concrete and finished with smooth, cement plaster, as well as channel groove and V-groove linear decoration and a glass block tower (CA-2674-3, CA-2674-4). A section of glass block is built into the upper south wall over each store area (CA-2674-3). 4.
Structural System: Structural support is provided by the concrete foundation, and reinforced concrete exterior walls (square concrete columns placed 21 feet on center with poured-in-place concrete in-fill). The concrete columns carry a roof framing system of wood arch trusses (Carrissimi Rhorer Associates Valasco 5. Porches, stoops, balconies, bulkheads: Originally, there were wood exit ramps on the east and west sides of the building which were pitched down toward the north side of the building and had one-and-a-half inch pipe railings. The walls that covered the underside of the ramp had a plaster finish (David ca. After both wood ramps were removed and a concrete ramp with metal railing was added to the west side.
The entry to the south (front) end of the theater is marked by the large marquee that extends 10 feet south from the south (front) facade. The faces of the marquee are surfaced with metal banding and neon lights. From beneath the marquee, the semi- circular recessed exterior lobby is entered. The lobby retains its original red, buff and blue terrazzo flooring and the walls are surfaced with red, white and blue ceramic tiles. Originally the ceilings of the marquee lobby were finished with plaster and had a recessed lighting system that was covered with white flashed glass panels.
The existing ceilings of the marquee and lobby have been overcoated with plaster, have exposed neon tube lighting in the recessed areas (originally covered with glass panels) and have modem recessed can lighting fixtures, which were added later (CA-2674-5). The entries to the stores that flank each side of the theater entry are recessed as well and have one-and-a-half-inch by one-and-a-half-inch light blue ceramic floors. ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 8 6. Chimneys: A concrete chimney associated with the building's original heating/ventilating system extends approximately three feet above the north parapet wall. The chimney has a 16-inch by 16-inch terracotta flue and its north concrete wall is continuous with the building's north exterior wall (David ca. 7.
Openings: a. Doorways and Doors: Original fenestration for doors/doorways was symmetrical at the east, north and west. At the north (rear) wall, two metal-covered double-doors provided egress to and from the alleyway and once had galvanized iron hoods which projected two feet over the doorways. The east and west walls each had two sets of metal-covered double-doors with galvanized iron hoods that projected one-and-a-half feet from the exterior wall. These doors/doorways were located at the second bay and fourth (slanted) bay from the north side of the building. The doors at the second bay, due to their lack of presence on William B. David's original plans, may have been later additions. The doors located at the fourth bay were accessed by the above-mentioned wood ramps (David ca.
By the original north, east and west wall doors/doorways were removed and replaced with concrete infill construction (CA-2674- 6). Another doorway at the slanted bay of the east wall has been replaced with concrete infill construction. The existing doorway at the west wall is located at the third bay in from the north side of the building and is accessed by the above-mentioned concrete ramp. This doorway is recessed approximately six feet from the main facade wall and consists of metal double-doors. The original south (front) facade doors to the theater portion of the building were removed before There were four sets of white metal double-doors with wood and colored plate glass design elements (David ca.
These were later removed and replaced with four sets of glazed aluminum double-doors (Carissimi Rhorer Associates These doors were removed some time after The existing theater doorway area consists of three sets of aluminum frame double-door-like fixed windows and one glazed aluminum entry door with sidelight (CA-2674-5). Regardless of fenestration type, the main doorway area to the theater has remained in the same location. The doorways to the south (front) facade stores originally had single doors of the same design as the theater's original south (front) facade doors. These doors were removed at a later date and replaced with glazed aluminum doors (CA-2674-3). b. Windows: From until the only windows on the building were located on the south (front) facade.
Fixed plate glass windows located at the eastern and western sides of the front facade (at the storefronts that flank the centered main entry to the theater) in William B. David's circa plans. A photograph confirms that the eastern storefront was redesigned to be curved, surfaced in ceramic tiles, and did not ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 9 include any windows (Anonymous An existing section of over-painted three- inch by six-inch white ceramic tiles at the wainscot (to the west side of the east storefront doorway) is a remnant of the tile design that once extended along the curved storefront.
By the curved, tiled storefront was removed and both storefronts have fixed plate glass windows (Carrissimi Rhorer Associates A fixed window with steel sash and wood "fins" was located at the second floor level of the south (front) facade (David ca. Post-1982 rehabilitation work removed the second floor level window, replaced it with concrete infill construction, and added three levels of aluminum fixed windows to the west and north walls (CA- 8. Roof: a. Shape, Covering: The main auditorium roof is rounded, due to the wood arch truss framing, and is surfaced with composition sheets. The roof appears to be approximately 51 feet above grade at its highest point.
Due to tapering of the east and west exterior walls and the use of smaller roof trusses, the northern (rear) portion of the roof is not as high or as wide as the southern (front) portion. The roof's arch span ends short of the east and west parapet, creating two gutter-like areas that both have four inch square cast iron drains at their north and south ends. Each drain sends the water through its respective three-inch-diameter vertical iron drainpipe (located inside the building at each comer) which sends the water back to the exterior via drain outlets near ground level (David ca. The front (south) portion of the theater building has a stepped design with several flat roofs at varied levels above grade.
The roofs in this portion are all surfaced with composite material, except for one small roof section next to the glass block tower that is surfaced with galvanized iron. For drainage reasons, many of these roofs have a slight pitch and/or a cast iron drain (David ca. b. Cornice, Eaves: The roof has concrete parapets at all sides. The north and east side parapets are brush coated and lack decoration. The west side parapet includes vertical fluted decoration from its junction with the south parapet to a point approximately 35 feet north; the remainder of the east side parapet is brush coated and lacks decoration. The front (south) facade is stepped with several parapetted roof sections (David ca.
The roof parapets that elevate to 20 feet, 6 inches above grade (above each store area) are undecorated. The parapets that elevate to 43 feet and 46 feet above grade include vertical fluted decoration. The parapetted areas that rise to 48 feet and 55 feet, 3 inches above grade and are directly to the east of the glass block tower are undecorated. The parapet that elevates to 51 feet, 6 inches above grade has two horizontal v-grooves, the top groove being approximately 1 foot, 6 inches below ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 10 the top of the parapet. At a later date, the east side parapet was extended higher (CA- c.
Dormers, Cupolas, Towers: The major focal point of the south (front) facade is the glass block tower with sign that extends from the top of marquee to approximately 90 feet above grade (including the sign's finial). The tower is composed 12-inch square glass block, rises to 58 feet, 3 inches above ground level and has a wood parapet with galvanized iron channeled decoration on the exterior, galvanized iron cap, flashing and counter flashing, and composition roof. A sign extends out and along the south face of the tower. This sign includes seven white panels with red, four-foot-high Modeme- style letters, which together vertically read "ESQUIRE." The panels and frames have a "ferro" porcelain enamel finish (David ca.
The eight bottom panels (closest to the marquee) originally had a bulletin board, which was removed at a later date (Anonymous Concrete and galvanized iron linear and curved decoration, a finial and neon lighting are also incorporated into the tower/sign design (CA-2674-4). C. Description of the Interior: 1. Floor Plans: a. Basement: The only basement level space to have been in the building was the Esquire Theater's furnace room. The symmetrically shaped room was directly beneath the stage area and was accessed by a stairway entered from the northern auditorium exit hall to the west of the stage area. Post-1982 construction closed off this basement area. b.
First Floor: The original first (main) floor was symmetrical in plan and consisted of three business areas; a centrally-placed theater flanked to the southeast and southwest by two single-story spaces for non-theater related businesses. The non-theater business spaces were irregularly shaped in plan and each had an interior length that equaled the distance from the south end of the theater lobby area to the north end of the theater lounge area (approximately 66 feet in length) (David ca. The original plan for the theater portion consisted of an exterior, recessed lobby (semi-circular in plan) with a ticket booth. From the lobby, the vestibule was entered through four sets of double-doors and then the foyer was entered through another four sets of double-doors.
Located directly to the north of and up two steps from the foyer was the lounge. The ladies' powder room and toilet room was entered at the west side of the lounge and the men's toilet room was entered at the east side of the lounge. Entered from the north wall of the lounge were a board room and a telephone area. The large auditorium was entered by wide ramps that extended from the foyer and along the outer wall of the lounge area. The auditorium had a stadium-type design with stepped rows for seating. The north end of the auditorium included a centrally-placed ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 11 stage platform. To the east and west sides of the stage platform were exit areas leading to the rear (north) alleyway.
The original interior first floor plan was demolished in when the building was gutted and rehabilitated to include three full levels of office space. The original southwest store area still functions as a separate commercial space from the rest of the building, although its length was shortened at the north end due to the construction. The southeast store was also converted to office space in the early c. Second Floor: The original second floor was located at the southern portion of the building and was accessed by a stairway at the east side of the theater section of the building. From the stairway, a hall was entered. To the north of the hallway was a locker room, to the west was the manager's office with a closet off its west wall, and to the south were two small rooms.
The eastern small room provided access to the interior of the glass block tower. The original second floor plan was demolished in d. Third Floor: The original third floor was located at the southern portion of the building and was accessed by the same stairway as the second floor. The major space at this third level was the projection room. The original third floor plan was demolished in when the building was gutted and rehabilitated. e. Attic: The original attic plan was open and contained primarily ductwork for the heating, ventilation and air-conditioning systems. The original attic plan was demolished in when the building was gutted and rehabilitated. The existing attic plan includes two areas for mechanical equipment. 2.
Stairways: Originally, two stairways were located in the theater building - one at the south end and one at the north end. The northern stairway was constructed of wood, was entered from the east side of the theater foyer, and connected the first, second and third floors of the theater's southern end. The southern stairway was constructed of wood, was entered from the west exit area at the auditorium's north end, and connected to the basement-level furnace room. All original stairways were removed when the building was gutted in The existing two stairways are of steel construction, are located in concrete stair shafts and connect the first, second and third floors of the building. An elevator was also added during construction and is located next to the southern stair shaft. 3.
Flooring: The original first floor interior spaces consisted of concrete floors. The vestibule was finished with terrazzo flooring and rubber mats, and the remainder of the first floor was carpeted. The upper stories at the south section of the building had wood framed floors. Second floor spaces were carpeted. Third floor spaces had a two- inch cover of cement. All original flooring materials and finishes were removed in ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 12 when the building was gutted for rehabilitation. The existing flooring is built- up from steel ceiling/floor beams. The sub-flooring system is topped with one-and-a- half-inch layer of concrete.
The finished floors are mainly carpeted, with exceptions being the bathrooms (one-inch square ceramic mosaic tile floors), the equipment, janitor, stair, elevator and electrical area (concrete floors), and the attic mechanical space (wood floors). 4. Wall and Ceiling Finishes: Originally, all interior walls and ceilings above the basement (furnace room) were of wood frame construction with a plaster finish. The bathroom areas also include ceramic tiling. The ladies' powder room walls were surfaced with plate glass mirrors. The auditorium wainscots and ramp area walls were finished with Keene's Cement, a type of plaster. Auditorium wall sections between original fluted pilasters were covered with a dark blue sound-absorbing material.
The lounge walls were finished in walnut paneling with decorative lighter wood inserts (Riter 1940:E-2). All original wall and ceiling materials and finishes were removed when the building was gutted in Existing walls are of gypsum wallboard construction and are finished with eggshell alkyd enamel or semi-gloss alkyd enamel. Elevator, stair, janitor and electrical areas have concrete masonry unit walls and are finished with eggshell alkyd enamel. Bathrooms have six-foot high wainscots of four-inch-square ceramic tile and janitor areas have four-foot-high hardboard wainscots. Existing ceilings are surfaced with acoustic panels in all tenant areas with gypsum board with enamel finish elsewhere (Carrisimi Rhorer Associates 5. Openings: a.
Doors/Doorways: Included with the original doors of the interior were four sets of doors located between the vestibule and lobby area of the theater. These doors were of the same construction as the main entry doors of the lobby (David ca. All original interior doors/ doorways were removed when the building was gutted in 83. All existing interior doors are solid core white birch. Some doors have single-light glazing. 6. Decorative Trim: All original interior decorative trim was removed when the building was gutted in Existing modern decorative trim includes stained wood wall bases. 7. Hardware: All original interior architectural hardware was removed when the building was gutted in ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page 13 8. Mechanical Equipment: a.
Heat, Ventilation, Air Conditioning: Original systems for heating and ventilation were located at a basement area that was at the north end of the building. This area consisted of a furnace room, which included a 30 hp Frecon condensing unit, a furnace with a 4-speed 70 hp fan, and a "Fresh Air and Return Air Mixing Chamber." A main supply duct ran from the furnace room straight up to the attic, and then ran horizontally through the attic and connected to the projecting room. The main supply duct had four smaller duct branches that all ended with "Anemostats. " These passed the air into the auditorium (David ca.
The basement area and all original heating, ventilation and air conditioning systems were removed when the building was gutted in The existing heating, ventilation and air-conditioning systems operate out of two mechanical rooms located in the attic level. b. Kitchen Appliances: There are no kitchen appliances associated with this building. c. Lighting: All original interior lighting fixtures were removed when the building was gutted in Existing lighting consists primarily of two-foot by four-foot lay-in fluorescent lighting fixtures in tenant areas and incandescent lighting fixtures in entry and hall areas. d.
Plumbing: All original plumbing fixtures were removed when the building was gutted in Existing plumbing fixtures are at the first, second and third floors and were installed during rehabilitation. 9. Original Furnishings: Original theater furnishings included loge-type theater seating with 1.5-inch thick foam rubber cushions in the auditorium, large seats, chairs and sofas with imported goat's hair coverings in shades of buff and blue in the lounge, and an architect-designed make-up table in the ladies' powder room (David ca. Riter 1940:E-2,E-4). All original furnishings were removed from the building. D. Site: I. General Setting and Orientation: (CA-2674-1, CA-2674-2). The Esquire Theater building is located on Tax Block 111 in the City of Sacramento, Sacramento County, California.
The lot appears to have been used for residential purposes from at least the late until (Sanborn-Perris Map Company Sanborn Map Company The Esquire Theater, completed by September is situated on its lot so that the main entry (south) facade faces onto K Street. The rear (north) facade faces directly onto a 20-foot-wide-alleyway, which bisects Tax Block 111 on an east-west axis (CA-2674-6). The Esquire's eastern neighbor is the Studio ESQUIRE THEATER Sacramento, California HABS No. CA-2674 Page I~ B. Historic Maps and Views: Anonymous ca. Photograph - Theaters - K Street from Street looking west. Note: The date given to this photograph is incorrect given the adjoining western building's circa construction date. On file, Sacramento Room, Sacramento City Library, CA.
Photograph - Theaters - Esquire Theater, K Street. On file, Sacramento Room, Sacramento City Library, CA. Photograph - Theaters - Esquire Theater, Premier of movie Steel Town, K Street. On file, Sacramento Room, Sacramento City Library, CA. Sanborn-Perris Map Company Fire Insurance Map of Sacramento, California, Map No. 15. Sanborn-Perris Map Co., New York. On file, California Room, California State Library, Sacramento, CA. Sanborn Map Company Fire Insurance Map of Sacramento, California, Map No. 28. Sanborn Map Co., New York. On file, California Room, California State Library, Sacramento, CA. Fire Insurance Map of Sacramento, California, Map No. 28. map revised to Sanborn Map Co., New York. On file, California Room, California State Library, Sacramento, CA. C.
Interviews: Valasco, Tony (Dreyfuss & Blackford Architects) Information about Esquire theater construction. D.
Bibliography
269 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HABS CAL,34-SAC,67-.
Not written, edited or summarised by this site.
David, William B. Letter to Marie McLean, Department of Parks and Recreation. On file, City of Sacramento, CA. Gail Ervin Consultants Esquire Center Project Final EIR. On file, City of Sacramento,
Ca. Esquire Theater
Sacramento, California HABS No. CA-2674 Page )I' IS- Riter, Bradley, ed. Esquire Theater Edition. The Sacramento Bee, March 14, pp. E-2 - E- 7. On file, California Room, California State Library, Sacramento, CA. Sacramento Bee Advertisement. The Sacramento Bee, March 15, On file, California Room, California State Library, Sacramento, CA. Sacramento Bee Advertisement. The Sacramento Bee, September 13 and 14, On file, California Room, California State Library, Sacramento, CA. Sacramento County Planning Department Historic Resources Inventory - Esquire Theater. Prepared for the State of California, Department of Parks and Recreation. On file, California Office of Historic Preservation, Sacramento, CA. PART IV.
PROJECT INFORMATION A portion of the Esquire Theater, located on the block of K Street in downtown Sacramento, California is set to be demolished to make room for construction of a proposed 22-story office and cinema complex. The Environmental Impact Report for the project stipulated that, prior to demolition of part of the theater, the City of Sacramento must record the building according to HABS/HAER standards and file documents with the Office of Historical Preservation and the Western Regional Office of the National Park Service, San Francisco, California. This recordation has been prepared to meet those stipulations. The report was prepared by Tracy D. Bakic and Mary L.
Maniery, cultural resource specialists, and Claire Warshaw, graphic illustrator, with PAR Environmental Services, Inc., Sacramento, California. Photography was prepared by David DeVries, Mesa Technical, Berkeley, California.
The federal surveyors worked through Sacramento building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HABS CAL,34-SAC,67-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.