Sacramento River Water Treatment Plant Intake Pier & Access Bridge, Spanning Sacramento River approximately 175 feet west of eastern levee on river; roughly .5 mile downstream from confluence of Sacramento & American Rivers, Sacramento

Sacramento River Water Treatment Plant Intake Pier & Access Bridge, Spanning Sacramento River approximately 175 feet west of eastern levee on river; roughly .5 mile downstream from confluence of Sacramento & American Rivers, Sacramento, Sacramento County, CA. Surveyed as HAER CA-324, with a 5,366-word written history.

From the record

“The Sacramento Water Treatment Plant Intake Pier and Access Bridge was constructed between and as a component of the Sacramento Water Filtration Plant.”

Written record, HAER CA-324 survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-324 · the record runs 5366 words · one of 165 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

52 words

Source document Quoted word for word from HAER CA-324. Not written, edited or summarised by this site.

Located on the Sacramento River, approximately 175 feet west of the eastern levee on the Sacramento River and roughly one half mile downstream from the confluence of the Sacramento and American Rivers. Sacramento Sacramento County California Date of Construction: Architect/ Builder: Dean and Dean/City of Sacramento Present Owner/ Occupant: City of Sacramento

Significance

4605 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CA-324. Not written, edited or summarised by this site.

The Sacramento Water Treatment Plant Intake Pier and Access Bridge was constructed between and as a component of the Sacramento Water Filtration Plant. Designed in a Spanish Revival influenced style, the Intake Pier draws water from the Sacramento River and carries it through a conduit to the main complex of the plant, where the water is then purified. When first constructed the filtration plant was the most modern facility in the west and utilized a new technique in water purification known as sand filtration. Date: April Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 2) NARRATIVE TEXT PART I. HISTORIC CONTEXT: DEVELOPMENT OF WATER

Supply in Sacramento

Early Water Supply in Sacramento Historically, the natural state of the Sacramento basin was typified by a system of natural levees along the rivers and creeks, with dense and boggy tule basins in the lowest lying areas. The basin was subject to regular, seasonal inundation. In the farmers settled along the natural levees, which were as much as twelve feet higher than the floor of the basin, and they utilized the rich soils for crops and the tule basins for livestock grazing. Between the and debris from hydraulic mining began to choke the streambeds, damage farmlands, and muddy the Sacramento River causing problems for the Sacramento water supply.

1 The City of Sacramento's early history was dominated by several devastating floods in the years following its founding in with particularly extensive flooding in the winter of As a direct result, the first levees were constructed around the city in the Beyond these levees lay scattered farmsteads and rural farmlands. It was protection of these lands that drew interest next, and that eventually allowed for urban and suburban development of areas outside the original urban levee system. 2 With the expansion of City of Sacramento came an increased need for public utilities, especially water. As with other services and infrastructure for the growing city, the founders of Sacramento's public water supply system were private entrepreneurs. William P.

Henry constructed Sacramento's first privately owned water supply system and began operations in Henry's system consisted of a five horsepower engine that pumped Sacramento River water from the river near the foot of I Street and delivered it to elevated wood tanks. The water was then picked up and distributed in pushcarts and by other crude methods and peddled around the city. This was a considerable improvement over using the previous method of buckets to pull water from the river. Soon after Henry's successful business got underway, Billy Anderson set up a similar endeavor downstream, and by the early the two men had combined their . 3 enterpnses.

Sacramento city leaders followed the lead of these private entrepreneurs and was one of the first cities in California to develop a public water system, a need that was especially apparent after the fire of destroyed much of the city. In the first publicly financed water system was put in operation at a cost of and its facilities were located in the city hall building at Front and I streets, near the location of Henry's earlier enterprise. The new municipal system pumped 1 History of Yuba County, Cal!fomia (Oakland: Thompson and West, John F. Burns, Sacramento: Gold Rush Legacy, Metropolitan Destiny, (Carlsbad, CA: Heritage Media Corp., 76. 1 Sharon Waechter, Far Western Anthropological Research Group, Inc., and Stephen R.

Wee, JRP Historical Consulting Services, "Cultural Resources Element for the City of Sacramento's Fish Screen Improvement Project Environmental Assessment/Initial Study," March 3 Myrtle Shaw Lord, A Sacramento Saga, (Sacramento, CA: Sacramento Chamber of Commerce, Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 3) water from the Sacramento River into gallon tanks, which delivered water by gravity flow to a distribution pipe system. This system served the city adequately (except for occasional pump failures) until about when the increasing number of customers and the expanding distribution system lowered the water pressure to an undesirable level for fire protection.

The city tried to solve the pressure problem by raising the height of the tanks in an improvement that proved inadequate. 4 The municipal water system was unable to cope with Sacramento's growing water needs, and in the city put a new water works system into operation. This system was constructed at a cost of and proved to be a more lasting method of distribution. The intake of the new system was located at the same place as the previous system, but it utilized an underground pipe chamber to supply water through a system of high-pressure supply mains. A steam powered Holly engine and other modifications created a direct pumping high-pressure supply system capable of a capacity between 40 and 100 psi.

The original pumps were replaced in with new equipment constructed by Southern Pacific Railroad. In largely through the efforts of Dr. N. E. Williamson, City Health Officer, the city added a chlorinization plant to the river intake. The result was improved water quality and a reduction in the number of cholera outbreaks. 5 Even though Sacramento had a steady supply of water by the there was continued public agitation for a cleaner supply than the river, although it met with little success. By late the newly organized Chamber of Commerce took up the problem of Sacramento's impure water supply and began attempting to organize change.

These efforts were not immediately successful but eventually resulted in the construction of the Sacramento River Water Treatment Plant, which was underway by the mid l 6 The Hyde and Wilhelm Report The water supply system, therefore, supplied the burgeoning city with water until the current Sacramento River Water Treatment Plant was put into operation in Arguments over the best method for an improved system had been ongoing for decades, but serious planning for a new system did not began until February when the city appointed the fim1 of Hyde & Wilhelm as consulting engineers to study the problem.

Hyde & Wilhelm issued a report in April that concluded that the existing water supply system (with its capacity of 22 million gallons per day) was inadequate and could not meet the demands of future growth. Three major alternatives for solving the water supply problem were studied in detail: an enlarged system to pump water from the Sacramento River; increased pumping of ground water through wells; and establishing a mountain water supply system to bring water from the Sierra Nevada. The Hyde & Wilhelm report concluded that increased pumping from the Sacramento River was the most viable option.

The report included designs for a new facility to be located feet east of the 4 Historic Environmental Consultants, "Sacramento River Water Filtration Plant Historic Property Report, Upgrade Project," February 4; Myrtle Shaw Lord, A Sacramento Saga, 5 Historic Environmental Consultants, "Sacramento River Water Filtration Plant Historic Property Report," 4. 6 Myrtle Shaw Lord, A Sacramento Saga, Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 4) eastern bank of the Sacramento River and feet south of the confluence of the Sacramento and American rivers. This location was eventually adopted as the site for the current facility.

7 Construction of the new facility was delayed, however, because various factions argued the validity of the options presented in the Hyde & Wilhelm report and questioned the scope of the report itself. The Sacramento Retail Merchant's Association, for example, believed that developing more water from wells was the better alternative, the Real Estate Men's Association wanted a mountain water supply, while various City officials favored Sacramento River pumping and filtration. This was the same indecisiveness that had slowed improvement of the system since the The stalemate was finally ended in when the Chamber of Commerce put together a committee, which hired its own consulting engineer, C. E. Grunsky, to perform another water supply evaluation.

Grunsky, like Hyde & Wilhelm before him, came to the conclusion that filtration of river water was the best alternative. The Chamber of Commerce and several other groups backed this proposal, and in June Sacramento voters approved a million bond measure for the construction of the new filtration plant. The city then purchased a 50-acre site for the facility from F. W. Warner in May for approximately 8 Design and Construction of the Sacramento Water Filtration Plant and Intake Pier Initial designs for the plant were based on those of the Hyde & Wilhelm report which included engineering layouts, site plans, and architectural designs prepared by Oakland architect, C. K. Bonestell.

The plans for the administration building essentially mirrored the plans for the nearby Pacific Gas & E Power Plant designed by Willis Polk of San Francisco. Polk was credited with being a major influence of the Bay Area Tradition, which undoubtedly had an effect on Sacramento architects, but the tradition was largely confined to the Bay Area. Instead, the Spanish Colonial Revival and Classical Revival style, as well as the nation wide City Beautiful movement, had much more influence on the designs of Dean and Dean, the Sacramento architects who were retained to finish the Water Filtration Plant and Intake Pier plans.

The Spanish Colonial Revival style, from the Mission phase on, was a logical choice as a regional vernacular that was seen as both traditional and unique to the state.9 It was adaptable to a large variety of building types and the basic simplicity of forms lent itself well to both stuccoed two-by-four frame and concrete construction. Because the distinctive elements of the style were established by arched openings and large expanses of stuccoed surfaces, rather than through fine details, buildings of this style could be designed by a contractor-builder as well as an architect. 10 7 Historic Environmental Consultants, "Sacramento River Water Filtration Plant Historic Property Report, Upgrade Project," 5.

8 Historic Environmental Consultants, "Sacramento River Water Filtration Plant Historic Property Report, Upgrade Project," 5; Myrtle Shaw Lord, A Sacramento Saga, 9 David Gebhard, Architecture in California, (Santa Barbara: The Art Galleries, University of California Santa Barbara, April 11. An exhibition organized by David Gebhard and Harriette Von Breten to celebrate the centennial of the University of California. 10 Gebhard, "The Spanish Colonial Revival In Southern California ( Journal of Society of Architectural Historians, Volume XXVI, No. XXVI, Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No.

CA-324 (Page 5) From its inception in the late the Spanish Colonial Revival style was widely used throughout the state and replaced the earlier Richardson Romanesque as the preferred style for public works buildings. Spanish Colonial Revival was especially dominate in Southern California where it influenced many public buildings, city planning, and landscape gardening. It was also widely used in Northern California. In Sacramento, notable examples include the Old Sacramento County Hospital designed by Rudolph Herold and Harry Devine (major potions have been demolished), McClunie Community Center in McKinley Park, Coloma Community Center on T Street, and Alhambra Theater on Alhambra Boulevard (also demolished).

In addition to the Spanish Revival style, Sacramento also had an established tradition of classically designed works, such as the State Capitol and the other government buildings such as the Post Office on I Street. In the early twentieth century, Sacramento underwent a substantial period of growth with a great influx of people to the city. This growth stimulated further residential development, the extension of public utilities, and construction of new schools, many of which were designed in the Classical and Spanish Revival styles. In the early portion of the twentieth century alone, between and thirty buildings were completed in these styles in Sacramento.

Of these buildings, notable examples were City Hall City Library the Masonic Temple the Sacramento Public Market ( the Senator Hotel ), the Elks Club Building and Memorial Auditorium With the construction of so many public buildings and the growing sense of civic pride, the citizens of Sacramento became increasingly concerned over the haphazard growth of the city. 11 The City hired various city planners during this period who compiled a comprehensive park system plan (adopted in passed a zoning ordinance in and a master plan in This planning reflected the nationwide City Beautiful movement, which was explicitly reform- minded and held that beautiful cities would inspire inhabitants to moral and civic virtue.

Influenced by the City Beautiful movement, the design for the plant and its setting resulted in a park like landscape. This aesthetic approach was to counteract the developing industrial nature of the Richards Boulevard district. Specific landscape plans do not exist for the plant, even though, the general setting of the plant indicates that planning went into the grounds. 12 The architects of record for the Water Filtration Plant and the Intake Pier, Charles F. Dean and James S. Dean, came to California between and and worked for the State Architect's Office.

The firm is known for such buildings as the Sacramento YMCA building, Shasta Union 11 City of Sacramento Neighborhoods, Planning and Development Services Department, Implementation Plan for the Preservation Element of the City of Sacramento General Plan, December (amended April 20, Sec 10, 11. 12 City of Sacramento Neighborhoods, Planning and Development Services Department, Implementation Plan for the Preservation Element of the City of Sacramento General Plan, Sec 10, 11; City of Sacramento Utilities Department, Contract set of plans for the Sacramento River Water Treatment Plant. Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No.

CA-324 (Page 6) High School, Hart's Cafeteria, the Westminster Church, Memorial Auditorium, two fire houses and several schools, residences, and other buildings in the region. 13 Construction began on the plant in January with the Clearwell Storage Tank. The River Intake facility (the subject of this documentation) was started in July and the rest of the facilities were constructed between and Mathews Construction Company was the primary contractor for the construction of the filtration portion of the facility and Coast Construction was the initial contractor for the intake facilities. The City of Sacramento, with Frank C. Miller as city engineer, George J. Calder as resident engineer, and Mason I. Fisher as water department engineer, constructed the pumping portion of the system.

In when the project was about thirty percent complete, the City reevaluated the and found that an additional was needed for its completion. It took eight months for the issuance of new bonds because a lawsuit challenged the city's new charter that had been adopted in By the time the State Supreme Court upheld the city's charter and the bonds were approved, the city decided to rebid the project. As a result, the city took over the construction of the intake facilities and pumping works from Coast Construction, while Mathews Construction Company completed the remainder of the buildings and structures. The portion of the construction taken over by the city was completed through day labor.

14 The Sacramento River Water Filtration Plant was originally estimated to cost Of this sum, the intake system cost less than the initial estimate of It consisted of two 60-inch intake conduits resting on concrete slabs buried beneath the river bottom that ran from the base of the intake pier eastward through the levee to the pumping station. Two conduits were used so that one side could be shut down while the other could still maintain a full supply of water. In similar fashion, equipment throughout the plant was installed in duplicate to ensure a constant water supply and to provide for future needs.

15 The official dedication of the plant took place on New Years Day Perhaps the most dramatic aspect of the dedication was that President Coolidge "touched a telegraph key, thereby sending across the continent an electric impulse that opened a new plant in Sacramento." 16 At the time it was completed, the Sacramento Water Treatment Plant was considered state of the art in the United Sates and could provide twice the estimated peak load of water used by Sacramento, which was 20 million gallons per day. 17 13 Historic Environmental Consultants, "Sacramento River Water Filtration Plant Historic Property Report, Upgrade Project," 6; Architect & Engineer, 90: 1 (June 90.

14 Historic Environmental Consultants, "Sacramento River Water Filtration Plant Historic Property Report, Upgrade Project," 7; The Sacramento Bee (February 24, E4, and (March 31, ES. 15 The Sacramento Bee, February 24, E4, and March 31, ES. 16 "Coolidge Touches Key Opening Sacramento Filtration Plant," Sacrament Union (January 1, I, 3. 17 Historic Environmental Consultants, "Sacramento River Water Filtration Plant Historic Property Report, Upgrade Project," 7; The Sacramento Bee (March 31, ES. The plant was constructed on the low lying sandy soil between the American and Sacramento Rivers on a site that had been the former channel of the American River until it was recut in to flow into the Sacramento River north of this location.

Most of the plant was erected on concrete columns and the surrounding ground filled in with sand to bring up the grade to the level of the levees to prevent seepage and flooding. This construction method caused settling of the facilities beyond what was expected Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 7) The Sacramento River Water Filtration Plant provided the sole source of water for Sacramento until the when wells were also developed to serve outlying areas.

The plant has been upgraded periodically to increase production, and in combination with the development of additional wells, has served as the sole treatment plant for the ever-increasing population until a second river water treatment plant was constructed in the early 18 The Intake Pier and Access Bridge has largely remained unaltered since its construction and became an American Water Works Association historical landmark in 19 by engineers, including serious cracking of concrete walls, t1oors and ceilings. There were also cracking problems in the pumping station and the filters. In the city hired consulting engineer Henry D. Dewell, who evaluated the problems, and found that insufficient steel reinforcement of concrete walls was a major contributor.

To fix these construction problems, a third bond measure was passed for to repair and strengthen the facility and add eight new filters. An additional was needed in to add new sedimentation basins. 18 Planning for the second plant began when City Engineer E. A. Fairbairn recognized the need for another plant Lo accommodate future growth. Construction on the Fairbairn Water Treatment Plant, located southeast of the California State University, Sacramento campus began in 19 Historic Environmental Consultants, "Sacramento River Water Filtration Plant Historic Property Report, Upgrade Project," 8; American Water Works Association website, "Honors and Awards" online at W ARDS/WATERLAN.CFM. Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 8) PART II.

Physical Setting and Description of the Sacramento Intake Pier and Access Bridge The Intake Pier is located in what is now commonly referred to as the Richards Boulevard district, an industrial area of Sacramento located north of downtown (Figure 1). When the Water Filtration Plant and Intake Pier were constructed, this area was agricultural land (Figure 2), used by farmers to raise truck gardens and vegetables for sale in the Sacramento urban markets. 20 With the construction of the Pacific Gas and Electric & E.) steam generating plant in (located southwest of the Intake Pier), the Sacramento garbage disposal plant, and the main complex of the Water Treatment Plant in the area started to take on a more industrial character.

Additionally a county road was laid out on the east side of the pier, as early as the mid that ran parallel to the levee. During the Interstate 5 replaced the road as the main thoroughfare, effectively dividing the Richards Boulevard district from the river. The area adjacent to the Intake Pier still retains an industrial character, although commercial construction has grown up north of the PG & E plant. Additionally, the American and Sacramento rivers are now used for more recreational purposes and the eastern levees form part of the American and Sacramento River bike path. The riverbank along the Sacramento River, adjacent to the Intake Pier and Access Bridge, is characterized by riparian thicket with a 12 foot wide paved pedestrian and bike path located on the crest of the levee.

This path passes directly in front (east) of the entry to the Access Bridge of the Intake Pier. The Intake Pier is made up of two major components: an oval shaped concrete pier and a metal cable suspension bridge. The design of the suspension bridge is typical of this type of bridge construction and is made up of three major parts: an anchor or abutment at the eastern levee, a central tower, and bridge deck. The concrete abutment or anchor, is set nine feet into the eastern Sacramento River levee and rising one foot above the crest of the levee. In addition to serving as an anchor for the bridge, it also acts as the approach to the bridge. Two four foot concave walls, of poured concrete, frame the abutment. These walls end at posts that sit on a base block and are topped with a simple cap.

Brick pavers are laid on top of the abutment in a herringbone pattern. From the abutment, the first, or approach span of the access bridge extends to the central reinforced concrete tower, where the suspension cables are set into cradles at the top of the tower. This span is 35 feet long and composed of a series of Warren trusses supporting steel floor beams and stringers with diagonal members forming lateral cross bracing. This system in tum supports the metal lattice deck, originally specified in the contract set of plans as a concrete deck. Because the approach span of deck is short, it functions as a pony truss and is not supported from the main suspension cables. The battered central tower or bridge pier also acts as a controlled access point to the main span of the bridge.

The bridge pier is 69 feet tall and is supported by several 28-foot concrete piles 20Sharon Waechter, Far Western Anthropological Research Group, Inc. and Stephen R. Wee, JRP Historical Consulting Services, "Cultural Resources Element for the City of Sacramento's Fish Screen Improvement Project," Appendix C, East Levee-Sacramento River, DPR 523 form, Significance, 4. Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 9) driven into the river bed. A 25 foot base sits above water level carrying the 26-foot tower fitted with a metal gate and hinged door. The tower is crowned with a simple cornice. The bridge tower provides support for the eastern end of the main, or suspended, span of the bridge.

The stiffening Warren truss and steel floor beams are carried by suspended cables and truss hangers spaced at seven foot intervals along the main span. The western terminus of the 130 foot suspended span is the Intake Pier itself. The two suspension cables pass over cable saddles mounted on the top of a five-foot tower projecting from the eave of the Intake Pier roof. The suspension cables are embedded within the concrete structure of the Intake Pier which forms the westerly anchor for the cables. This projection mimics the design of the cornice of the central tower. The main portion of the Intake Pier is a three-story reinforced concrete pier, which extends approximately twenty feet below the water level and two stories above water.

The pier is a battered, oval shaped structure housing the intake system located within the shaft of the pier and a machine room. Five metal sluice gates are located on the pier at four different water levels. These draw water from the river and are connected to two hollow shafts inside the Intake Pier called "float chambers." These chambers are twelve feet wide and pump water through two conduits, attached to the pier and carrying water to the pumping plant. The intake gate openings are located at different depths to allow water to be drawn as the water level changes, which can vary from two feet during the late summer and early fall to 32 feet during the hundred year flood level.

These intake gates have been fitted with sluice gates on the south side, and screens on the east and west sides. Once the water is drawn into the valve, it is forced through two conduits by the pumps in the machine room. The conduits run along the stream bed roughly under the suspension bridge, below the river water level. They pass through two openings in the tower and, in the concrete abutment. The pipes then continue to the north side of the PG & E plant beneath Jibboom Street, Interstate 5, and Bercut Drive to the filtration plant where the water begins the treatment process. The gate operator room at the top of the Intake Pier contains the pressure equipment necessary to pump the water to the plant, as well as control valves.

A projecting deck surrounding this machine room provides a six-foot wide walkway around the pier and is encircled with a metal pipe rail. Brackets below the deck provide support and are set at one foot spacing. Centered on the east side of the pier is a metal door to the machine room, which is framed by the terminus of the second span of the access bridge. The interior of the machine room has been left unfinished with the concrete forms visible; the ceiling is a barrel vault. Windows are located on north, south, and west sides of the machine room and are metal sash windows. They have concrete sills and have been fitted with rough wire glazing. Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 10) SOURCES OF INFORMATION A.

Architectural Drawings: City of Sacramento Filtration Department. "Sacramento River Water Treatment Plant," Sheet Nos. 1, 4, 5, 6, 7, 8, 9, 10, and "Sacramento River Water Treatment Plant," Sheet Nos. On file with City of Sacramento Utilities Department. The table below provides a list of the sheets relating to the Intake Pier that are located in the contract set. Sheet Title Description Date No.

1 Project Plan Intake, Intake Conduit, Pumping Station, Force Mains and Filtration Plant 4 Intake Pier Superstructure plans and elevation and details 5 Intake Pier Plans, Elevation and Sections 6 Intake Pier Plans, Screens, and Details 7 Intake Pier Bridge Pier and Abutment 8 Intake Pier Bridge Stress Sheet 9 Intake Pier Bridge Details 10 Intake Conduits Profile, Sections, and Details 115 Completion of Intake Plans Profiles, and Details Conduits-Proposition II 117 Completion of Intake Pipe Sections and Plans . Conduits (Revised) B. Early Views: Bob McCabe Photograph Collection. Sacramento Archive and Museum Collection Center, Sacramento CA. David Joslyn Photograph Collection. Sacramento Archive and Museum Collection Center, Sacramento CA.

Early photograph of the Sacramento Water Filtration Plant, undated. Photo No. David Joslyn Collection, Sacramento Archives and Museum Collection Center. Merrite Nickerson Photograph Collection. Sacramento Archive and Museum Collection Center, Sacramento CA. Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 11) Norwood Silsbee Photograph Collection. Sacramento Archive and Museum Collection Center, Sacramento CA. Sacramento Intake Pier and Access Bridge, undated. Photo Nos. 69/206/47a, Norwood Silsbee Collection, Sacramento Archives and Museum Collection Center. Note the Intake Pier and Access Bridge on the right center side of photo. Sacramento Filtration Plant, Spring Air Photo by Lusk. Photo No.

Bob McCabe Collection, Sacramento Archives and Museum Collection Center. Note the Intake Pier and Access Bridge on the right center side of photo. Sacramento Water Filtration Plant in the Photo No. Don Rivett Collection, Sacramento Archives and Museum Collection Center. C.

Sources

623 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CA-324. Not written, edited or summarised by this site.

Burns, John F. ed. Sacramento: Gold Rush Legacy, Metropolitan Destiny. Carlsbad, CA: Heritage Media Corp., Gebhard, David. "The Spanish Colonial Revival in Southern California: Journal of the Society of Architectural Historians (Volume XXVI, Gebhard, David and Hariette von Breten. Architecture in California: Santa Barbara: University of California, Lord, Myrtle Shaw. A Sacramento Saga. Sacramento, CA: Sacramento Chamber of Commerce, Thompson and West. History of Yuba County. Oakland: Thompson and West, 2. Unpublished California State Office of Historic Preservation. "Directory of Properties in the Historic Property Data File for Sacramento County." October City of Sacramento. "Official Register, City of Sacramento, California.

Official Listings of Structures and Preservation Areas with Architectural or Historical Significant (Pursuant to Title 32 of the City Code), Including Other Properties also Subject to Provisions of Title 32 of the City Code." October Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 12) City of Sacramento, Neighborhoods, Planning and Development Services Department. "Implementation Plan for the Preservation Element of the City of Sacramento General Plan." December amended April 20, Historic Environmental Consultants. "Sacramento Water Filtration Plant Historic Properties Report, Upgrade Project." February Minute Books of the Sacramento City Council. Sacramento Archive and Museum Collection Center, Sacramento, CA.

Waechter, Sharon (Far Western Anthropological Research Group, Inc) and Stephen R. Wee, Historical Consulting Services). "Cultural Resources Element for the City of Sacramento's Fish Screen Improvement Project Environmental Assessment/Initial Study," March 3. Internet American Water Works Association, "Honors and Awards." .awwa.org/about/oandc/AW ARDS/W ATERLAN.CFM. 4. Periodicals: The Architect and Engineer, June Volume 90, Number 1. Sacramento Union, January 1, The Sacramento Bee, March 31, and February 24, D. Likely Sources not yet investigated: None. F. Supplemental Material: 35 mm photographs showing engineering details of the Intake Pier are included with this report. Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 13) PART IV.

PROJECT INFORMATION The project was undertaken to fulfill the requirements of a "Memorandum of Agreement" between the California State Historic Preservation Office, US Bureau of Reclamation, and the City of Sacramento signed in May and June The intake pier and access bridge are to be abandoned in place once the new intake pier is completed in Fall Amanda Blosser and Meta Bunse of JRP Historical Consulting Services prepared this report for the City of Sacramento Utilities Department. Ms. Blosser conducted the field work and wrote the site description as well as the narrative with contributions from Ms. Bunse. Andrew Walters assisted with the research and the narrative. Both Ms. Blosser and Mr.

Walters conducted research in various university repositories, including California State Library, Sacramento Archives and Museum Collection, the City of Sacramento Planning Department, City of Sacramento Department of Utilities, and University of California, Davis, Shield Library. Bill Dewey produced the photography. Sacramento River Water Treatment Plant Intake Pier & Access Bridge HAER No. CA-324 (Page 14)

Location Map

Location of Sacramento Water Treatment Plant Intake Pier and Access Bridge Sacramento River Water Treatment Plant Intake Pier and Access Bridge HAER No. CA-324 (Page 15) Figure 1. Intake Pier and Access Bridge, undated. From the Sacramento Archives and Museum Collection Center, Norwood Silsbee Collection, Photo Nos. 69/206/47a, Sacramento River Water Treatment Plant Intake Pier and Access Bridge HAER No. CA-324 (Page 16) Figure 2. Sacramento Filtration Plant, Spring Air Photo by Lusk. From the Sacramento Archives and Museum Collection Center, Bob McCabe Collection, Photo No. Note the Intake Pier and Access Bridge on the center right side of the photo. I I Sacramento River Water Treatment Plant Intake Pier and Access Bridge HAER No. CA-324 (Page 17) Figure 3.

Early photograph of the Sacramento Water Filtration Plant, undated. From the Sacramento Archives and Museum Collection Center, David Joslyn Collection, Photo No.

In context

Sacramento, California The place record: every map, photograph and survey of this town.
Sacramento County, California 221 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Sacramento

24 of 101 records shown

The federal surveyors worked through Sacramento building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Southern PacificHAER CA-30359,252 words
Reclamation District 1000HAER CAL,33-SAC.V,1-17,861 words
Central Pacific Transcontinental RailroadHAER CAL,34-SAC,63-14,932 words
Southern Pacific Railroad DepotHABS CA-234013,351 words
Strub BuildingHABS CAL,34-SAC,60-11,356 words
Sacramento Junior CollegeHABS CAL,34-SAC,68A-9,730 words
Hudson-Cippa-Wolf RanchHABS CAL,34-SAC,61-8,813 words
Southern Pacific Railroad DepotHABS CAL,34-SAC,69A-8,744 words
California State Printing OfficeHABS CAL,34-SAC,59-7,759 words
Leland Stanford HouseHABS CAL,34-SAC,9-7,047 words
McKinley ParkHALS CA-1336,971 words
Sacramento Army DepotHAER CAL,34-SAC,49-6,269 words
Esquire TheaterHABS CAL,34-SAC,67-5,837 words
Coolot BuildingHABS CAL,34-SAC,66-5,269 words
Crocker Art GalleryHABS CAL,34-SAC,20-5,036 words
Sutter's Fort State Historic ParkHALS CA-1304,608 words
Studio TheaterHABS CAL,34-SAC,70-4,362 words
Sacramento River BridgeHAER CAL,34-SAC,58-4,200 words
Lincoln SchoolHABS CAL,34-SAC,55-3,869 words
California State Library & Courts BuildingHABS CAL,34-SAC,64-3,336 words
Sacramento City HallHABS CA-418-A3,285 words
California State Office Building No. 1HABS CAL,34-SAC,65-3,154 words
Sacramento City HallHABS CAL,34-SAC,48-3,130 words
San Francisco BoulevardHALS CA-1462,189 words

Provenance

  • Written history. Quoted verbatim from HAER CA-324. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.