North Main Street Bridge, Los Angeles

North Main Street Bridge, Los Angeles, Los Angeles County, CA. Surveyed as HAER CA-276, with a 1,793-word written history.

From the record

“Main Street Bridge is significant as the first open-spandrel three- hinge concrete arch bridge to be built in the western United States.”

Written record, HAER CA-276 survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-276 · the record runs 1793 words · one of 386 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

41 words

Source document Quoted word for word from HAER CA-276. Not written, edited or summarised by this site.

Main Street between Wilhardt and Albion City of Los Angeles, Los Angeles County, California USGS Los Angeles Quadrangle UTM Coordinates Date of Construction: Designers: City of Los Angeles Bureau of Engineering; Homer Hamlin, City Engineer Parker, Design Engineer Contractor: Carl Leonardt

Significance

78 words

Source document Quoted word for word from HAER CA-276. Not written, edited or summarised by this site.

Main Street Bridge is significant as the first open-spandrel three- hinge concrete arch bridge to be built in the western United States. It is associated with the pioneer engineers who began the reinforced concrete arch bridge building program in Los Angeles: Homer Hamlin and Parker. It is also eligible for the National Register as one of a group of twelve City Beautiful bridges over the Los Angeles River important in the settlement and transportation history of Los Angeles.

Written history

1569 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CA-276. Not written, edited or summarised by this site.

The summer field team was under the direction of Eric N. DeLony, (Chief of HAER). The recording team included Andrew Johnston, Field Supervisor (University of California, Berkeley), and Erin Ammer (Tulane University), Jason Currie (U.S.ICOMOS, Ottawa, Canada), Grant Day (University of Illinois, Champaign-Urbana), David Greenwood (University of Southern California) and Heather Larson (University of California, Berkeley), architects; Portia Lee, NORTH MAIN STREET BRIDGE HAER No. CA-276 (Page 2) Project Historian, (California Archives, Los Angeles) and Elizabeth Watson, (City University of New York) historian; and Brian Grogan, photographer (El Portal, California). An additional drawing was done by German B. Calas, (Structip:al Division, . Bureau of Engineering).

Project assistance was provided by Claik Robins, Deputy City Engineer (Bureau of Engineering, City of Los Angeles) and Shashi Bhakta, Wenn John Koo, Raffi Massabki, Ejike Mbaruguru, Peter See, Alex Vidaurrazaga and Jim Hao-Jen Wu, (Structural Division, Bureau of Engineering, City of Los Angeles); Amid Habbal (Vanir Construction Management); and Todd Croteau, Manager, (HAER Roads and Bridges Program, Washington, NORTH MAIN STREET BRIDGE HAER No. CA-276 (Page 3) Bridge Description Main Street Bridge over the Los Angeles River is feet wide and 280 feet long, with 3 spans, each 87 .5 feet with a rise of 11 feet. The bridge was symmetrical with 4 lanes and a flush walkway. The mainspan is a reinforced concrete, open spandrel, 3- hinged, elliptical, 6-ribbed arch measuring feet.

The structure crosses the river in a west to east direction. The context of the surrounding land use is light industrial with manufacturing units and warehouse buildings. 1 Bridge History In an article written during construction, City Engineer Homer Hamlin reported that the authorization for Main Street Bridge had come from City Councilman of the District, Bernard Healy.

The previous bridge near the site, old East Main Bridge, could no longer safely carry both street railway and highway traffic, The City of Los Angeles and the Los Angeles Railway Company were constructing a joint bridge at the crossing to cost approximately To secure sufficient waterway, the City Engineer reported, flat arches had been constructed abutting against massive steel hinges that were hidden from view and lights would be placed on concrete shafts over the piers. 2 In fact, Councilman Healy had been calling for East Main's replacement for several years. An article in the Los Angeles Daily Journal had an attention-grabbing headline: New Main Street Bridge. Councilman Healy is Firm in Demand-Rotten Stringers.

The story reported that Healy had objected to the City Engineer and Board of Public Works' plan to spend on the old wooden bridge. To demonstrate the seriousness of the "rotten stringers, beams, flooring and other wooden portions, as well as the rusting iron bolts, plates and rods which had caused the timbers to rot away, leaving the bridge in a very dangerous condition. "3 Since Hamlin was himself mounting an ambitious plan to construct high water, permanent concrete arch bridge over the river, it is likely that he was delighted at the Councilman's action. Construction on a new Main Street Bridge began soon thereafter.

In the Daily Journal headline read, "Order More Improvements." The story was subtitled, "City Will Put Fancy Railing and Lights on Main Street Bridge." This time Hamlin had gone to Council, asking them to advertise for bids for the new bridge, which was "almost ready to receive such additional construction. "4 1 Arch Bridge Rating Sheet Bridge No. Main Street Bridge. On file, California Department of Transportation Library, Sacramento. 2 Homer Hamlin, "Bridge Construction in the City ofLos Angeles," in Charles Mulford Robinson, The City Beautiful (Los Angeles: John A. Porter, 3 "New Main Street Bridge," Los Angeles Daily Journal, 2 September 1 4 "Order More Improvements," Los Angeles Daily Journal, 19 November 1 NORTH MAIN STREET BRIDGE HAER No.

CA-276 (Page 4) Bridge Design Main Street Bridge was widely published and discussed in professional journals during the building process. The last of three concrete open-spandrel arch bridges constructed in the period between and it's construction method- the three- hinged-arch - had never before been built in the western United States. Hugo Eckhardt, a German engineer and contractor Carl Leonardt's engineer, developed the technique. Main Street Bridge's three spans, each 87 .5 feet, were supported by piers 226 feet below the river channel. The piers rested on piles driven 12 feet deeper into the riverbed. Nine feet thick on top, the piers were constructed hollow with walls 2 feet 3 inches thick at the spring line of the arch, then widening to 3 feet 5 Yi inches at the footing.

The abutments were also built hollow, extending 21 feet below the depth of the channel. The depth of the piers compensated for the lowering of the channel due to the extensive mining of sand and gravel from the riverbed. Eight ribs were contained in the width of the arch, one supporting each railway track, two supporting the railway on either side, and one supporting each sidewalk. One hinge is placed in the crown, the other in the end of the arch. Each hinge is a 3/16-inch steel shaft, which presses against cast iron, shoes, which in turn bear against a network of steel beams. After this construction is encased in concrete, joints around the shaft are filled with melted lead and a compressible joint is constructed across the entire rib.

The compressible joint, composed of one 3 3/8-inch batten with 'l4 inch of deadening felt, is pasted to each side. The story reported that Contractor Leonardt used a higher- priced cement, one manufactured in his own factory, because it resisted the action of oil, which was supposed to be prevalent in the river water at the crossing. 5 Bridge Architecture In line with the policy of Hamlin to build bridges that were "sightly" as well as practical, care was taken to ornament Main Street Bridge with elements in the City Beautiful, Beaux Arts style. The structure was detailed with applied decorative elements in cast concrete: a keystone in each arch; a <lentil below the railing on each of the piers and, when built, pierced starburst handrails.

6 Special attention was given to the arch rings: thirty days after the concrete was poured, the arch rings were picked out with a pointed tool, as were the spandrel walls. The concrete light posts were faced with "marbelite," a mixture of crushed marble and crushed lava to resemble granite. As a final 5 Southwest Contractor and Manufacturer," A Three-Hinged Ribbed Arch Concrete Bridge," 7 May 16. 6 State of California, Department of Parks and Recreation "Historic Resources Inventory, Main Street Bridge," on file, State Office of Historic preservation, South Central Coastal Information Center, Fullerton, California. See illustration in Southwest Contractor and Manufacturer, "A Three hinged Ribbed Arch," 16. NORTH MAIN STREET BRIDGE HAER No.

CA-276 (Page 5) touch, the arch ribs were darkened by adding one pound of lampblack per sack of cement and using dark stone from Hollywood. 7 Alterations The bridge has lost some integrity due to insensitive alterations. The decorative handrails are gone, having been replaced by tube rails. The period lamp posts have been altered by the addition of modem globes. Alteration to the river channel piers is the result of flood control and water diversion modifications.

Seismic Retrofit Despite the technical advance the bridge represented and its economical construction, by the Bureau of Engineering already viewed the bridge as being a construction of a prior era and not to a "modem standard." Main and Aliso Street Bridges were the only two river crossin~s in the downtown area that did not provide a grade separation for the railroad tracks. Today, the bridge is both dangerous and inconvenient. Main Street Bridge is viewed as antithetical to good seismic design. The three hinged construction that made its single span across the river possible become three weak links in the event of an earthquake. While the hinges were filled and could tolerate shear forces, they still offer the least resistance to moment forces within the bridge.

Contemporary conceptions of earthquake force believe that the hinges offer the benefit of flexibility to movement. However, the plane of movement offered by the hinges was designed for vertical direction to accommodate settlement and shrinkage along the arch, not to counteract lateral or transverse forces. 9 No decision has been made on a plan to retrofit the bridge. Its inherent structural deficiency makes it doubtful that it can be retrofitted for less than building a new bridge. Since the consensus is that the bridge should be widened, it is probable that no decision will be made about a seismic upgrade without further study. 7 Southwest Contractor and Manufacturer, "A Three Hinged Ribbed Arch," 17.

8 Annual Report of the Bureau of Engineering, Los Angeles, 51.On file, Los Angeles City Archives. 9 City Engineers John Koo and Raffi Massabki, personal communication with the author, June NORTH MAIN STREET BRIDGE HAER No. CA-276 (Page 6)

Bibliography

Annual Report of the Bureau of Engineering, Los Angeles. Los Angeles City Archives. California Department of Transportation Library, Sacramento, California. Historic Resources Inventory. Sate Office of Historic Preservation, South Central Coastal Information Center. Fullerton, California. Hamlin, Homer. "Bridge Construction in the City of Los Angeles." Charles Mulford Robinson, ed. The City Beautiful. Los Angeles: John A. Porter, Koo, John. Interview with Elizabeth Watson, June Los Angeles Daily Journal. 2 September 19 November Massabki, Raffi. Interview with Elizabeth Watson, June Southwest Contractor and Manufacturer. 7May1910.

In context

Los Angeles, California The place record: every map, photograph and survey of this town.
Los Angeles County, California 1,078 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Los Angeles

24 of 142 records shown

The federal surveyors worked through Los Angeles building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Los Angeles River BridgesHAER CA-27121,165 words
Los Angeles Music CenterHABS CA-278018,683 words
Lytton Savings and Loan AssociationHABS CA-293616,955 words
Eames HouseHABS CA-290316,265 words
Times Mirror Building and Parking StructureHABS CA-293514,277 words
Los Angeles City HallHABS CAL,19-LOSAN,51-9,036 words
Crossroads of the WorldHABS CA-29658,968 words
Vickrey-Brunswig BuildingHABS CA-27988,766 words
Plaza HouseHABS CA-27998,766 words
Golden Gate TheaterHABS CA-28798,348 words
Holiday BowlHABS CA-27758,280 words
Westlake School for GirlsHABS CA-27918,007 words
Morris Landau HouseHABS CA-27897,644 words
The Hollywood Reporter BuildingHABS CA-29597,302 words
Olive Switching StationHABS CAL,19-LOSAN,80-7,190 words
El AlisalHABS CAL,19-LOSAN,15-6,775 words
Parker CenterHABS CA-29236,594 words
First Street Viaduct over Glendale BoulevardHAER CA-23436,577 words
Brunswig AnnexHABS CA-27936,453 words
University of California Los AngelesHABS CA-2678-A5,023 words
California Teachers Association Building No. 1HABS CA-29604,425 words
Hollyhock HouseHABS CAL,19-LOSAN,28-4,248 words
Rancho La Brea AdobeHABS CAL,19-LOSAN,26-4,227 words
Bullinger BuildingHABS CA-29644,042 words

Provenance

  • Written history. Quoted verbatim from HAER CA-276. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.