The summer field team was under the direction of Eric N. DeLony, (Chief of HAER). The recording team included Andrew Johnston, Field Supervisor, (University of California, Berkeley); and Erin Ammer (Tulane University), Jason Currie (U.S.ICOMOS, Ottawa, Canada), Macy Street Viaduct (Macy Street Bridge) (Cesar Chavez A venue Bridge) HAER No. CA-277 (Page 2) Grant Day (University of Illinois, Champaign-Urbana), David Greenwood (University of Southern California) and Heather Larson (University of California, Berkeley), architects; Portia Lee, Project Historian, (California Archives, Los Angeles) and Elizabeth Watson (City University of New York Graduate Center), historian; and Brian Grogan, photographer, (El Portal, California). An additional drawing was done by German B.
Calas, (Structural Division, Bureau of Engineering). Project assistance was provided by Clark Robins, Deputy City Engineer, Bureau of Engineering, City of Los Angeles; Shashi Bhakta, Wenn John Koo, Raffi Massabki, Ejike Mbaruguru, Peter See, Alex Vidaurrazaga and Jim Hao-Jen Wu (Structural Division, Bureau of Engineering, City of Los Angeles); Amid Habbal (Vanir Construction Management); and Todd Croteau, (HAER Roads and Bridges Program, Washington, Macy Street Viaduct (Macy Street Bridge) (Cesar Chavez Avenue Bridge) HAER No. CA-277 (Page 3) Bridge Description Cesar Chavez Avenue Bridge, No. is a symmetrical reinforced concrete bridge, feet wide and feet long with 29 spans, one arch span, four lanes and a cantilevered walkway.
The counterfort rigid frame reinforced U-shaped concrete abutments, approach spans of reinforced concrete T beams, and reinforced concrete slabs are supported by four reinforced concrete columns. Its mainspan is a reinforced concrete, open spandrel fixed elliptical, four-ribbed arch 215 feet in diameter. As built, it contained cubic yards of concrete and pounds of steel. Roadway width is 56 feet between concrete curbs; two sidewalks measure 5 1 Cesar Chavez Avenue Bridge carries five lanes of traffic, but access is limited due to the placement of structures and railroad tracks around it. On the north and south sides of the structure west of the river, access roads lead to commercial buildings. Between these structures and the river are rail lines.
On the east side of the river, no access can be gained to either the north or south sides of the structure and additional rail lines run between the West Abutment and Pier 1. Along Mission Road industrial facilities limit access to the river. At the present time the bridge extends from the westerly line of Mission Road to the easterly line of Howard Street. 2 Bridge History Cesar Chavez A venue Bridge replaced a reinforced concrete bridge over the Arroyo de Los Posos at Macy Street. Parker of the Bureau of Engineering was the designer. Merrill Butler had just come to the Bureau as a drafter. This structure was considered a "unique" engineering feat at the time since it had both skew and rise.
Designed to support a roadway and double electric car tracks, sidewalks, an ornamental reinforced concrete railing and lamp post, the structure's total cost was of which the Pacific Electric paid about one-third of the cost. 3 A new Macy Bridge spanning the river was authorized in the bond issue of but did not get underway until the earlier bridge was removed. Opened to traffic on April 17, the structure was illustrated in the Los Angeles Examiner's story of the event under the caption,"Span Boon to East Side." The newspaper reported that the span was opened with a ceremony attended by government leaders representing "city, county and state" business leaders.
However, streetcar traffic had been given the first priority and so had already been carrying passengers over the viaduct for ten days. The story stated that 1 "Arch Bridge Rating Sheet, Bridge No. Macy Street Bridge" On file, California Department of Transportation Library, Sacramento, California. 2 "Seismic Retrofit of the Macy Street Bridge over the Los Angeles River. Finding of Adverse Effect," On file, Structural Division, Bureau of Engineering, City of Los Angeles. 3 "Unique Bridge of Reinforced Concrete," Southwest Contractor and Manufacturer, 12 December 6 Macy Street Viaduct (Macy Street Bridge) (Cesar Chavez Avenue Bridge) HAER No.
CA-277 (Page 4) the bridge was the catalyst for new real estate and industrial development in the district, in particular the City Terrace Development. 4 Architectural Design The Report of the Municipal Arts Commission reported their approval of the plans for the Macy Street Viaduct, adding "Spanish colonial architecture was selected owing to the fact that El Camino Real crosses this viaduct." 5 The Macy Street pylons, massive and highly ornamented, became instant city landmarks. The pavilion-style pylons, paired at each end of the mainspan, utilized elements of classical Spanish art, such as the twisted baldochino column that had become a feature of early adobe architecture. The pavilions, dedicated to missions' founder Father Junipero Serra, displayed the City Seal.
The structure was also ornamented below the roadway. Between the mainspan arch and the roadbed, the square pillars of a ribbed arcade have similar corbels. This ornamentation was intended to be seen by visitors to the city arriving by train. As City Engineer Homer Hamlin reported: The total cost, exclusive of the sum of paid for land to straighten Brooklyn A venue, was This expenditure, which provided a structure that will be not only permanent, but an ornament to the city, was justified by the fact that there is no bridge in Los Angeles that will be seen each day by as many people as will this one. In addition to the Brooklyn A venue cars that will pass over it, all Interurban cars to Pasadena, Alhambra, Covina and other suburbs pass by or under it.
6 Seismic Retrofit In after the bridge seismic retrofit was underway, by action of the Los Angeles City Council, portions of Sunset Boulevard, Macy Street and Brooklyn A venue were renamed Cesar E. Chavez A venue in to honor the late President of the United Farm Workers Union. 7 4 "Macy Viaduct Open to Public Motor Travel, Los Angeles Examiner, 18 April Pt. IV, 5. 5 Los Angeles Municipal Art Department, Annual Report, Report, 13. The El Camino Real, the "Royal Road," was the historic trail that followed the path of the missions, which were established at intervals equivalent to one day's trip on horseback. 6 Homer Hamlin, "Bridge Construction in the City of Los Angeles," addendum to Charles Mulford Robinson, The City Beautiful (Los Angeles: John L.
Porter, 7 George Ramos "A New Name Can't Change a Street's History," Los Angeles Times, 20 September Pt. B, 3 Macy Street Viaduct (Macy Street Bridge) (Cesar Chavez Avenue Bridge) HAER No. CA-277 (Page 5) Macy Street Bridge kept substantial design integrity over time, although the historic handrails had been replaced with modem tube railing. As partial mitigation for the retrofit, these were reconstructed in accordance with original plans. The retrofit design plans for Macy Street required extensive column replacement in Bents They were replaced to historic dimensions. On the arch, beams at the top of the spandrel columns were strengthened by adding of concrete below the existing bottom face of the beams.
Concrete shear walls were placed transversely between spandrel columns, extending upward from the arch ribs to the beams and four horizontal struts between the arch ribs were removed and reconstructed to historic dimensions. Spandrel columns were partially removed and reconstructed for the first 3 feet at the bottom, slightly increasing the original dimensions. Beams three feet in depth added near the spandrel columns now connect the middle two spandrels closest to the arch abutments to the abutments themselves. 8 8 John Koo, Engineer, Structural Division, Bureau of Engineering, City of Los Angeles. Personal communication to the author, August Macy Street Viaduct (Macy Street Bridge) (Cesar Chavez Avenue Bridge) HAER No.
CA-277 (Page 6) SOURCES CONSULTED Published Los Angeles Municipal Art Department. Annual Report, (Los Angeles "Macy Viaduct open to Public Motor Travel. Los Angeles Examiner, 18 April Ramos, George. "A New Name Can't Change a Street's History." Los Angeles Times, 20 September "Span Boon to East Side." Los Angeles Examiner. 17 April "Unique Bridge of Reinforced Concrete. Southwest Contractor and Manufacturer, 12 December Unpublished Arch Bridge Rating Street, Bridge No. Macy Street Bridge. On file, California Department of Transportation Library, Sacramento Koo, John. Engineer, Structural Division, Bureau of Engineering, City of Los Angeles. Personal communication to the author, August "Seismic Retrofit of the Macy Street Bridge over the Los Angeles River.
Finding of Adverse Effect." On file, Structural Division, Bureau of Engineering, City of Los Angeles.